Freelance Planning Engineer Wirral
Senior Planning Engineer and Systems Developer ‑ Working primarily in the fields of engineering design & construction 1 have been deeply involved in corporate planning for the past eleven years. 1 possess an extensive knowledge of Primavera, Artemis 9000 & 7000 and Microsoft Project having received formal training in these products.
In addition to Primavera, Artemis and MS Project 1 have had extensive experience of a wide variety of additional project management software. 1 have also used both Artemis and OpenPlan to perform risk analysis studies on a number of high value projects.
Having a background in engineering design and construction 1 am well placed to interpret large project, multi‑contract, planning needs and 1 possess a sound track record in representing my employers contractual and programme interests at all levels.
In my present position 1 am employed as Senior Planning Engineer based in the Netherlands working in the field of worldwide Oil and Gas sub‑sea pipelaying. i am responsible for project planning of multimillion pound pipelay projects for customers who include Shell, Exxon and Statoil In addition to project planning 1 have spent several periods offshore scheduling mission critical vessel completion works and planning fast track, emergency repair programmes.
| Rating: | Unrated (New) |
| Hourly Rate: | |
| Available From: | Seller ID: | 295681 |
CV
QUALIFICATIONS & Training COURSES
BSc Hons.Mechanical Engineering ‑ Liverpool Polytechnic 1974‑78
Artemis 9000 Application Development Course
Artemis 9000 to 7000 Developers Conversion Course
Artemis 7000 for Windows Application Interface Design Course
1 SUMMARY OF EXPERIENCE
Apri 1991,
Senior Planning Engineer and Systems Developer ‑ Working primarily in the fields of engineering design & construction 1 have been deeply involved in corporate planning for the past eleven years. 1 possess an extensive knowledge of Primavera, Artemis 9000 & 7000 and Microsoft Project having received formal training in these products.
In addition to Primavera, Artemis and MS Project 1 have had extensive experience of a wide variety of additional project management software. 1 have also used both Artemis and OpenPlan to perform risk analysis studies on a number of high value projects.
Having a background in engineering design and construction 1 am well placed to interpret large project, multi‑contract, planning needs and 1 possess a sound track record in representing my employers contractual and programme interests at all levels.
In my present position 1 am employed as Senior Planning Engineer based in the Netherlands working in the field of worldwide Oil and Gas sub‑sea pipelaying. i am responsible for project planning of multimillion pound pipelay projects for customers who include Shell, Exxon and Statoil In addition to project planning 1 have spent several periods offshore scheduling mission critical vessel completion works and planning fast track, emergency repair programmes.
in addition to my planning activities 1 have worked periodically writing bespoke software and have developed several Permit Control Database systems for a number of UK power generators.
On many occasions 1 have been able to incorporate my software skills into the planning role. Data management systems have included items as diverse as document tracking software, budget distribution analysis packages and a progress monitoring database linked to the company CAD system.
Former employers have included
National Nuclear Corporation Power Station Construction
Costain Petrocarbon Multi‑disciplined Engineering Construction
Nuclear Electric Electrical Power Generators
National Power Electrical Power Generators
Swan Hunter Shipbuilders Shipbuilders
PRESENT EMPLOYMENT
Allseas Engineering BV‑ Delft, Netherlands
Senior Planning EngineerFebruary 1998Until Present
Apri I
Allseas Engineering B.V. based in Delft in the Netherlands are the owners of the worlds largest sub‑sea
1 g
vessel the Solitaire. Using this, and several other vessel they undertake sub‑sea pipelaying for all the major oil and
g
gas field developers. Their client list includes Shell, Exxon, Texaco, Amoco and Statoil working in locations as diverse as the North sea, Gulf of Mexico, Canada and Indonesia.
As Senior Planning Engineer 1 am responsible for preparation, monitoring and reporting on contract plans for these projects
The planning, which is carried out using Artemis 7000 Unix, is developed in two distinct halves, onshore and offshore. The onshore planning is related to the preparation of engineering design safety and quality documentation, logistics and welding / NDT strategy in line with the client's contractual requirement
g cl
The offshore planning, which is far more critical due to the massive revenue bias as well as vessel management
g ‑
issues, is planned by the hour and contains detailed interfacing between the pipelay vessel and Its support craft as well as interfaces with the client's other construction activities.
As the Solitaire is a new vessel she is still undergoing completion works and modifications and 1 have undertaken several offshore assignments to plan these works. These activities involve complex management of resource due to
g
the limitations of available bed spaces on the vessel as well as working around the problems associated with completing the vessel while she is in production.
1 have also been responsible for the planning of emergency repair works to the vessel following major storm damage while operating in the North Sea.
1 addition to my planning role 1 have undertaken Artemis development projects to enhance the budget contro capabilities of the corporate planning software.
PREVIOUS EMPLOYMENT
Mowlem Engineering Projects ‑ Bromborough, Wirral, Merseyside
Senior Planning Engineer July 1997 Until February 1998
Employed by Mowlem as Senior Planning Engineer at their Bromborough offices where the business activities are split into three primary groups, Process, Power and Environment with project values typically ranging from £1 m to £20.
I was responsible for preparation of bid plans for tendering and for progress monitoring and reporting on live projects using Primavera P3 and Artemis 7000. In addition to providing planning expertise for client feedback 1 am also required to control in house cost monitoring against a detailed work breakdown 1 cost centre accounting system.
In addition to project planning 1 was responsible for preparation of programme related submission associated with contractual litigation proceedings.
n ‑c
April 19 99
Swan Hunter (Tyneside) Limited ‑ Wallsend, Newcastle Upon Tyne
Senior Planning Engineer February 1996 Until July 1997
Employed as Senior Planning Engineer on a conversion of an 80,000 tonne bulk freight carrier into a
sub‑sea pipe laying vessel for Allseas Engineering BV in the Netherlands.
1 was initially responsible for designing and maintaining a fast track planning system for scheduling and monitoring the Engineering design phase of the project. The role included defining multi‑discipline manning requirements, work scheduling to meet the demands of a heavily overlapped construction programme and progress reporting.
Detailed planning, for use at the workface, was carried out using Primavera Suretrak while corporate reporting and efficiency monitoring is carried out using Artemis 7000.
1 was responsible for making presentations to our own management and the client's representatives at all levels and for preparation of all periodic reporting.
Following significant completion of the construction phase 1 took on the role of planning the 'putting t
work and commissioning of the ship's systems and pipelay production plant.
Swan Hunter (Tyneside) Limited ‑ Wallsend, Newcastle Upon Tyne
Senior Planning Engineer February 1996 Until July 1997
Employed as Senior Planning Engineer on a conversion of an 80,000 tonne bulk freight carrier into a
sub‑sea pipe laying vessel for Allseas Engineering BV in the Netherlands.
1 was initially responsible for designing and maintaining a fast track planning system for scheduling and monitoring the Engineering design phase of the project. My role included defining multi‑discipline manning requirements, work scheduling to meet the demands of a heavily overlapped construction programme and progress reporting.
Detailed planning, for use at the workface, was carried out using Primavera Suretrak while corporate reporting and efficiency monitoring is carried out using Artemis 7000.
1 was responsible for making presentations to our own management and the client's representatives at all levels and for preparation of all periodic reporting.
Following significant completion of the construction phase 1 took on the role of planning the 'putting t work' and commissioning of the ship's systems and pipelay production plant.
National Power PLC ‑ Swindon, Wiltshire
Planning Software Developer & Senior Planning Engineer May 1993 Until February 1996
Contracted to National Power plc, Project Development & Construction Division, based in Swindon but
spending extended periods resident at their Little Barford and Deeside CCGT construction sites,
Initially recruited to enhance the Artemis 9000 mainframe planning system. Six months spent carrying out a major upgrade to the user interface and graphical reporting capabilities of the application.
Upon completion, 1 was seconded to the Little Barford construction team as site planning co‑ordinator on a £200m CCGT power station project. While at Little Barford 1 was Responsible for representing NP interests, at all levels, in meetings with the main contractor GEC Alsthom and for the verification of progress associated with stage payment approval. 1 was subsequently employed as Planning Engineer on a number of projects associated with Power Plant modifications and research plant installations. 1 also carried out post construction reviews on problem CCGT sites as Deeside and Killingholme.
In addition to planning and software development 1 was responsible for user training and system
administration.
‑ ‑‑ ‑‑ A ‑ 1
Nuclear Electric PLC ‑ Knutsford, Cheshire
Artemis Development Engineer January 1988 Until May
1993
Working in the Engineering Services Department where 1 was employed in the development of Project
Management software using Artemis 9000. My initial projects were associated with engineering design,
budget monitoring and procurement planning at the Knutsford design headquarters. However, as
emphasis shifted to the construction site 1 was more often involved in the creation of utilities to enable the
site planning group to monitor construction progress. For several months 1 was based at the Sizewell 'B'
construction site where, besides application development, 1 was responsible for training and
familiarisation.
My final year was spent with Future Projects Division where 1 was responsible for developing new software systems for planning the next generation of PWR power stations.
Kingston Management Consultants ‑ Altrincham, Cheshire
Associate Periodic Assignments 1987 to 1993
My work for Kingston Consultants has been extremely varied and involved development of microcomputer data management systems using Clipper, Lotus 123, Symphony and others. Some of the major tasks undertaken have included:‑ Hazleton Medical Research ‑ Leeds. Medical Researchers involved in drug testing on human volunteers. 1 developed an expert system for generating drug study costing and quotations. Hazleton U.K. Harrogate. ‑Research Laboratories. Responsible for the development of a multiple Cost and Profit centre accounting system. Kempster‑Holt Limited ‑ Rochdale. Engineers engaged in valve manufacture. 1 developed a multipurpose utility package used to plan workshop loading, material procurement, budget monitoring and incentive scheme payments.
Constain‑Petrocarbon Limited ‑ Sharston, Manchester
Senior Mechanical Engineer June 1986 Until January 1988
Responsible to the Lead Mechanical Engineer for controlling all aspects of mechanical design of a
Transfer Facility to handle medium level radioactive, liquid effluent to be constructed at BNFL plc.
'Sellafield' works. My responsibilities included conceptual design, supervision of both Engineering and
Draughting personnel during detailed design, presentation of proposals to the client at all levels and
technical support in calculations, selection and application of standards and preparation of specifications.
National Nuclear Corporation ‑ Knutsford, Cheshire
Mechanical Engineer May 1984 Until June 1986
Responsible to the L.P.Services Section Head for vetting and approval of subcontractors submissions of design calculations, plant/materials, fabrication/erection procedures for compliance with contractual obligations on all non‑active service pipework on Torness nuclear power station.
F. E. S. Northern Limited ‑ Runcorn, Cheshire
Project Engineer October 1982 Until May 1984
Responsible to the Project Manager for customer liaison/design interpretation, detail design, materials
procurement and monitoring fabrication of skid mounted, high pressure, low temperature chemical plant
packages for Monsanto Europe SA. for a variety of their clients throughout Europe and Asia.
Beirne Owen Engineering ‑ Runcorn, Cheshire
Mechanical Project Engineer October 1979 Until October 1982
Responsible to the Technical Manager for the supervision of draughtsmen and tracers involved in
projects of mechanical design. Work included Jig & Tool design for the aircraft industry, compartment layout and cable routing for 'Invincible' class cruisers for the MOD(Navy), chemical plant layout and detail for ICI's Corvic 7 plant.
Sillito Boyd Limiter‑ Runcorn, Cheshire
Mechanical Project Engineer June 1978 Until October 1979
Responsible to the Technical Manager for the supervision of contract draughtsmen involved in
mechanical design projects.
March. 1997
CURRICULUM VITAE OF
QUALIFICATIONS:
BSc Hon's. Mechanical Engineering
TRAINING COURSES:
Metier -Artemis 9000 Application Development
Lucas MS.-Artemis 9000 to 7000 Developers Conversion
Lucas MS- Artemis 7000 for Windows Application Interface Design
SUMMARY:
Senior Planning Engineer and Systems Developer - Working primarily in the fields of engineering design & construction, deeply involved in corporate planning for the past nine years. Gained an extensive knowledge of both Artemis 9000 and 7000 having received formal training in both products. Employed as both Senior Planning Engineer and sole technical support for the company's' Artemis Software.
In addition to Artemis had extensive experience of a wide variety of project management software including Microsoft Project, Primavera Suretrak and OpenPlan, also used both Artemis and OpenPlan to carry risk analysis studies on a number of high value projects.
Having a background in engineering design and construction , well placed to interpret large project, multi-contract, planning needs and possess a sound track record in representing my employers contractual and programme interests at ail levels.
Work periodically writing bespoke software and have often written database management systems as stand alone applications or as enhancements to my project management systems.
Former employers have included:- National Nuclear Corporation, Costain Petrocarbon, CEGB, Nuclear Electric, National Power and Swan Hunter.
EMPLOYMENT:
Feb 1998 - Present Allseas Engineering BV, Delft, Netherlands
Senior Planning Engineer
The company are the owners of the world's largest sub-sea pipelaying vessel the Solitaire. Using this, and several other vessel they undertake sub-sea pipelaying for all the major oil and gas field developers. Their client list includes Shell, Exxon, Texaco, Amoco and Statoil working in locations as diverse as the North Sea Gulf of Mexico, Canada and Indonesia.
Responsible for preparation and reporting on contract plans for these projects.
The planning, which is carried out using Artemis 7000 Unix, is developed in two distinct halves, onshore and offshore. The onshore planning is related to the preparation of engineering design, safety and quality documentation, logistics and welding/NDT strategy in line with the client's contractual requirement.
The offshore planning, which is far more critical due to the massive revenue bias as well as vessel management issues, is planned by the hour and contains detailed interfacing between the pipelay vessel and its support craft as well as interfaces with the client's other construction activities.
As the Solitaire is a new vessel, she is still undergoing completion works and modifications and undertook several offshore assignments to plan these works. These activities involve complex management of resource due to the limitations of available bed spaces on the vessel as well as working around the problems associated with completing the vessel while she is in production.
Also responsible for the planning of emergency repair works to the vessel following major storm damage while operating in the North Sea.
In addition to the planning role, undertook Artemis development projects to enhance the budget control capabilities of the corporate planning software.
July 1997 - Feb 1998 Mowlem Engineering Projects, Bromborough, Wirral
Senior Planning Engineer
Business activities are split into three primary groups - process, power and environment with project values typically ranging from £1m to £20.
Responsible for preparation of bid plans for tendering and for progress monitoring and reporting on live projects. In addition to providing planning expertise for client feedback. Also required to control in-house cost monitoring against a detailed work breakdown/cost centre accounting system.
February 1996 Until July 1997 Swan Hunter (Tyneside), Wallsend, Newcastle Upon Tyne
Senior Planning Engineer
Presently employed as Senior Planning Engineer on a £50m conversion of an 80,000 tonne bulk freight carrier into a sub-sea pipe laying vessel. Initially responsible for designing and maintaining a fast track planning system for scheduling and monitoring the Engineering design phase of the project. The role included defining multi-discipline manning requirements, work scheduling to meet the demands of a heavily overlapped construction programme and progress reporting.
Detailed planning, for use at the workface, is carried out using Primavera Suretrak while corporate reporting and efficiency monitoring is carried out using Artemis 7000.
Responsible for making presentations to our own management and the client's representatives at all levels and for preparation of all periodic reporting.
Following significant completion of the construction phase took on the role of planning the 'putting to work' and commissioning of the ship's systems and pipelay production plant.
May 1993 until February 1996 National Power PLC. Swindon, Wiltshire
Software Development Engineer
Contracted to National Power plc, Project Development & Construction Division, based in Swindon but spending extended periods resident at their Little Barford and Deeside CCGT construction sites.
Initially recruited to enhance the Artemis 9000 mainframe planning system. Six months spent carrying out a major upgrade to the user interface and graphical reporting capabilities of the application.
Upon completion, was seconded to the Little Barford construction team as site planning co-ordinator on a £200m CCGT power station project. While at Little Barford was responsible for representing NP interests, at all levels, in meetings with the main contractor GEC Alsthom and for the verification of progress associated with stage payment approval.
Subsequently employed as Planning Engineer on a number of projects associated with Power Plant modifications and research plant installations. Also carried out post-construction reviews on problem CCGT sites as Deeside and Killingholme.
Besides planning and software development I was responsible for user training and system administration.
January 1988 until May 1993 Nuclear Electric PLC. Knutsford, Cheshire.
Software Development Engineer
Working in the Engineering Services Department employed in the development of Project Management software using Artemis 9000. Initial projects were associated with engineering design, budget monitoring and procurement planning at the Knutsford design headquarters. However, as emphasis shifted to the construction site was more often involved in the creation of utilities to enable the site planning group to monitor construction progress. For several months was based at the Sizewell 'B' construction site where, besides application development, was responsible for training and familiarisation.
Final year was spent with Future Projects Division with responsibility for developing new software systems for planning the next generation of PWR power stations.
1987 - Jan 1988 Kingston Management Consultants, Altrincham, Cheshire.
Associate
Extremely varied and involved development of microcomputer data management systems using Clipper, Lotus 123, Symphony and others. Some of the major tasks undertaken have included:-
Hazleton Medical Research - Leeds. Medical Researchers involved in drug testing on human volunteers. Developed an expert system for generating drug study costing and quotations.
Hazleton U.K. Harrogate. - Research Laboratories, responsible for the development of a multiple Cost and Profit centre accounting system.
Kempster-Holt Limited - Rochdale. Engineers engaged in valve manufacture. Developed a multipurpose utility package used to plan workshop loading, material procurement, budget monitoring and incentive scheme payments.
June 1986 to 1987 Costain Petrocarbon Limited, Sharston, Manchester,
Senior Mechanical Engineer
Responsible to the Lead Mechanical Engineer for controlling all aspects of mechanical design of a Transfer Facility to handle medium level radioactive, liquid effluent to be constructed at BNFL plc. 'Sellafield' works. My responsibilities included conceptual design, supervision of both Engineering and Draughting personnel during detailed design, presentation of proposals to the client at all levels and technical support in calculations, selection and application of standards and preparation of specifications.
May 1984 until June 1986 National Nuclear Corporation, Knutsford, Cheshire.
Mechanical Engineer
Responsible to the LP.Services Section Head for vetting and approval of subcontractors submissions of design calculations, plant/materials, fabrication/erection procedures for compliance with contractual obligations on all non-active service pipework on 'Torness' nuclear power station.
March 1984 until May 1984 Monsanto Europe SA. Brussels, Belgium.
Design Engineer
Employed by Monsanto Separations Division to carry out design modifications to a skid mounted chemical plant package, provisionally designed whilst working for FES Northern the year previously.
October 1982 until March 1984FES Northern Limited. Runcorn, Cheshire.
Project Engineer
Responsible to the Project Manager for customer liaison/design interpretation, detail design, materials procurement and monitoring fabrication of skid mounted, high pressure, low temperature chemical plant packages for Monsanto Europe SA. for a variety of their clients throughout Europe and Asia.
October 1979 until October 1982 Beirne Owen Engineering. Runcorn, Cheshire.
Mechanical Project Engineer
Responsible to the Technical Manager for the supervision of draughtsmen and tracers involved in projects of mechanical design. Work included Jig & Tool design for the aircraft industry, compartment layout and cable routing for 'Invincible' class cruisers for the MOD(Navy), chemical plant layout and detail for ICl's Corvic 7 plant
June 1978 until October 1979:Sillito Boyd Limited. Runcorn, Cheshire.
Mechanical Project Engineer
Responsible to the Technical Manager for the supervision of contract draughtsmen involved in mechanical design projects.
Categories & Skills
Engineering & Technical
Categories
- Building & Construction (Construction)
- Construction
- Energy
- Engineering
- Nuclear Energy (Energy)
- Oil & Gas (Energy)
- Scientific & Technical
Skills
- BSC or Equivalent (Construction - Building & Construction - Education Level)
- BSC or Equivalent (Engineering - Education Level)
- BSC or Equivalent (Scientific & Technical - Education Level)
- BSC or Equivalent (Energy - Nuclear Energy - Education Level)
- BSC or Equivalent (Energy - Oil & Gas - Education Level)
- Chemical (Energy - Oil & Gas - Experience)
- Commissioning (Construction - Building & Construction - Experience)
- Commissioning (Energy - Oil & Gas - Experience)
- Conceptual Design (Engineering - Experience)
- Conceptual Design (Energy - Nuclear Energy - Experience)
- Construction (Engineering - Experience)
- Construction (Energy - Nuclear Energy - Experience)
- Construction (Energy - Oil & Gas - Experience)
- Construction Planning (Construction - Building & Construction - Experience)
- Control (Scientific & Technical - Experience - Cost)
- Control Systems (Engineering - Experience)
- Control Systems (Energy - Nuclear Energy - Experience)
- Control Systems (Energy - Oil & Gas - Experience)
- Corporate Reporting (Energy - Oil & Gas - Experience)
- Cost (Scientific & Technical - Experience)
- Cost Control (Engineering - Experience)
- Cost Control (Energy - Nuclear Energy - Experience)
- Design Engineer (Engineering - Job Role)
- Design Engineer (Scientific & Technical - Job Role)
- Design Manager (Construction - Building & Construction - Job Role)
- Development (Engineering - Experience - Power)
- Development Engineer (Energy - Oil & Gas - Job Role)
- Documentation (Engineering - Experience - Safety)
- Draughting (Engineering - Experience)
- Education Level (Construction - Building & Construction)
- Education Level (Engineering)
- Education Level (Scientific & Technical)
- Education Level (Energy - Nuclear Energy)
- Education Level (Energy - Oil & Gas)
- Engineer (Construction - Building & Construction - Job Role)
- Engineering (Engineering - Experience - Safety)
- Engineering (Scientific & Technical - Experience - Safety)
- Engineering (Energy - Nuclear Energy - Experience - Safety)
- Engineering Design (Energy - Oil & Gas - Experience)
- Environment (Construction - Building & Construction - Experience)
- Estimating/Proposals (Construction - Building & Construction - Experience)
- Fabrication (Engineering - Experience)
- Fabrication & Erection (Construction - Building & Construction - Experience)
- Fabrication & Erection (Energy - Oil & Gas - Experience)
- Layout (Engineering - Experience - Plant)
- Mechanical Design Engineer (Engineering - Job Role)
- Mechanical Design Engineer (Energy - Nuclear Energy - Job Role)
- Mechanical Engineer (Construction - Building & Construction - Job Role)
- Mechanical Engineer (Engineering - Job Role)
- Mechanical Engineer (Energy - Nuclear Energy - Job Role)
- Mechanical Engineer (Energy - Oil & Gas - Job Role)
- Mechanical Engineering (Engineering - Experience)
- Mechanical Engineering (Energy - Nuclear Energy - Experience)
- Mechanical Project Engineer (Engineering - Job Role)
- Mechanical Project Engineer (Energy - Nuclear Energy - Job Role)
- Microsoft (Construction - Building & Construction - Software Skills)
- Microsoft (Engineering - Software Skills)
- Microsoft (Scientific & Technical - Software Skills)
- Microsoft (Energy - Nuclear Energy - Software Skills)
- Microsoft (Energy - Oil & Gas - Software Skills)
- Nuclear (Engineering - Experience)
- Offshore (Energy - Oil & Gas - Experience)
- Onshore (Energy - Oil & Gas - Experience)
- P3 (Construction - Building & Construction - Software Skills - Primavera)
- P3 (Engineering - Software Skills - Primavera)
- P3 (Scientific & Technical - Software Skills - Primavera)
- P3 (Energy - Nuclear Energy - Software Skills - Primavera)
- P3 (Energy - Oil & Gas - Software Skills - Primavera)
- Planning Engineer (Engineering - Job Role)
- Planning Engineer (Energy - Nuclear Energy - Job Role)
- Planning Engineer (Energy - Oil & Gas - Job Role)
- Plant (Engineering - Experience)
- Plant Layout (Energy - Nuclear Energy - Experience)
- Power (Engineering - Experience)
- Power Plant (Engineering - Experience - Power)
- Power Stations (Construction - Building & Construction - Experience)
- Power Stations (Energy - Oil & Gas - Experience)
- Primavera (Construction - Building & Construction - Software Skills)
- Primavera (Engineering - Software Skills)
- Primavera (Scientific & Technical - Software Skills)
- Primavera (Energy - Nuclear Energy - Software Skills)
- Primavera (Energy - Oil & Gas - Software Skills)
- Procurement/Buying (Construction - Building & Construction - Experience)
- Project (Construction - Building & Construction - Software Skills - Microsoft)
- Project (Engineering - Software Skills - Microsoft)
- Project (Scientific & Technical - Software Skills - Microsoft)
- Project (Energy - Nuclear Energy - Software Skills - Microsoft)
- Project (Energy - Oil & Gas - Software Skills - Microsoft)
- Project Engineer (Construction - Building & Construction - Job Role)
- Project Engineer (Engineering - Job Role)
- Project Engineer (Scientific & Technical - Job Role)
- Project Engineer (Energy - Nuclear Energy - Job Role)
- Project Engineer (Energy - Oil & Gas - Job Role)
- Project Manager (Construction - Building & Construction - Job Role)
- Project Manager (Engineering - Job Role)
- Project Manager (Scientific & Technical - Job Role)
- Project Manager (Energy - Nuclear Energy - Job Role)
- Project Manager (Energy - Oil & Gas - Job Role)
- Safety (Engineering - Experience)
- Safety (Scientific & Technical - Experience)
- Safety (Energy - Nuclear Energy - Experience)
- Senior Engineer (Construction - Building & Construction - Job Role)
- Senior Engineer (Energy - Oil & Gas - Job Role)
- Software Skills (Construction - Building & Construction)
- Software Skills (Engineering)
- Software Skills (Scientific & Technical)
- Software Skills (Energy - Nuclear Energy)
- Software Skills (Energy - Oil & Gas)
- Systems Engineer (Engineering - Job Role)
- Welding (Engineering - Experience)