Seller 290021 Aberdeen

Rating:Unrated (New)
Hourly Rate:£61.11
Available From:01 February 2009

[ Top | CV | Skills ]

CV

QUALIFICATIONS

RGIT Offshore Survival & Medical.

AVEVA Vantage PDMS 11.5 Equipment & Piping Design (M3, M4 & M5)

AutoCAD 10, 11, 12, 13, 14, 2000 & 2002. Autoplant, Pro-pipe.

Microstation V, 95, Java, Version 7.1 & 8

Plant Space 3D Modelling. Photogrammetry / Videogrammetry.

EMPLOYMENT DETAILS

Nov 2004-To Date Senior Piping Engineer

Wood Group Engineering. Alliance Centre. Aberdeen.

BP Schiehallion Repair Orders & Various Change Proposals. (Senior Piping Engineer).

Principal Piping Designer/

Apache Forties Charlie M.O.L. Pumps. (Principal Designer PDMS & Microstation V7 &V8)

May 2004-To Oct 2004. Principal Piping Designer / Piping Engineer. (MicrostationV8)

Joint Integrity Group. (Shell, AMEC, Jacobs). Seafield House. Aberdeen.

Shell UK N.U.I. Projects F.E.E.D. Study.

Normally Unmanned Installation Cutter & K17. Comprising of 4 Conductors with single-tree facilities.

Layout of equipment and re-usable energy sources to facilitate day to day operations.

Escalation of construction Plan and Methods of constructability. Contract completed upto to bid status.

Detail Design in progress and ongoing by third party engineering companies in the UK & Netherlands.

Feb 2003-To May 2004 Principal Piping Designer/ Senior Piping Designer

Wood Group Engineering. (PDMS, Plant Space & Microstation V7 &V8)

AllianceCentre. Aberdeen.

BP Magnus Additional Conductor Slots

F.E.E.D. Study.

The installation of 5 Conductors with double-tree facilities. Re-route of existing lines and equipment to facilitate

Conductor, Tree and Flowline installation. Escalation of construction Plan and Methods of constructability.

Detail Design.

Sep 2002- Nov 2002 Lead Piping Engineer.

MSD Design. Tullos. Aberdeen.

Global SantaFe.

Rig 135 & Arctic III Re-fit of Drilling Vessels and Upgrade of facilities. Escalation of construction Plan and Methods of constructability.

Oct 2001-Sep2002 Senior Piping Designer / Field Engineer. (Microstation V5)

Sigma3. Aberdeen

Shell Central Fields Small Scope Team.

Offshore surveys, Detail Drawings, Workpacks, Jobcards. Liaison with Vibration and Corrosion specialists.

Sep 2001-to 0ct 2001 Lead Piping Engineer.

MSD Design. Altens. Aberdeen.

Banff FPSO Call off contract.

Various Change Proposals, Offshore surveys, Detail Drawings, Workpacks, and Jobcards.

Apr-2001-Sep 2001 Senior Piping Designer.(Microstation V5 / Omnipipe)

Wood Group Engineering. Aberdeen.

Texaco Captain FPSO Project.

Call off contract. Various Change Proposals, Offshore surveys, Detail Drawings, Workpacks, Jobcards.

Feb 2001- Apr 2001 Layout Piping Designer. (AutoCAD2000 LT)

KCA Drilling. Aberdeen.

Claymore 'A' drilling upgrade. Mud Tanks & Pumps Layout.

Jan 1999-Feb 2001 Lead Piping Designer/ Piping Field Engineer. (AutoCAD 14)

PGS Atlantic Power.Aberdeen. & Blohm & Voss. Hamburg. Germany.

Banff FPSO Preparation for First Oil/ First Gas. Co-Ordinating Offshore Survey Team of 4 men for pipe supports Verification Survey of PAU-04 & PAU-06. Various offshore surveys for Change Proposals, Conceptual onshore & offshore studies for Fuel Gas re-heating, Vessel hose bunkering, Galley waste disposal, Maintenance drain distribution & Various other workpacks to validate steady production targets. From Oct 2000 through till Jan 2001, I was part of the Sailover crew to Blohm & Voss ship repair yard Hamburg for the Ramform Banff Re-fit. During leave cycles whilst the vessel was in dock, I was Stand-in Construction Superintendent then resumed my duties as Piping Field Engineer.

Sep 1998- Jan 1999 Piping Layout Engineer. (Microstation 95)

Wood Group Engineering. Aberdeen.

Shell Brent Charlie Gas Re-Injection Compressor. Layout of New Gas Compressor and temporary Air Compressor, for the Re-Injection of Gas into the Reservoir. Offshore construction Hook-up and contract close out.

Shell I.S.C. Flowline replacement contract. Like for like replacement of corroded Flowlines.

Apr 1997-Aug-1998 Area Lead Piping Designer. (AutoCAD 12/13 Autoplant)

Aker Maritime. Aberdeen.

Banff FPSO Project. Layout of Various PAUs (AutoCAD 12/13 Autoplant). Supervising a team of 14 Piping Designers during detail design phase. Reporting progress of design status to management team. Project transferred to construction site Feb 1998. Assisting site team with Design, Engineering & Technical site queries. Chairing multi-discipline team regarding envelope space allocation for Topsides equipment and piperack.

Feb 1997-Apr 1997 Principal Piping Designer (Microstation V)

Amec Process & Energy Ltd. Aberdeen.

Brae Projects Alliance. Various call off projects on TMR

Oct 1996-Feb 1997 Senior Piping Designer (AutoCAD 12)

Brown & Root/AOC/Total J.V. Aberdeen.

Total-Dunbar, North Alwyn & St. Fergus. Offshore & Site surveys to complete the design and re-work of the aforementioned Platforms and Oil and Gas Terminal.

Mar 1996-Oct 1996 Senior Piping Designer (AutoCAD 13)

McDermott Marine Construction Ltd. Aberdeen.

Layout of M.O.L. Platform. Occidental ISND Redevelopment. Doha Qatar

Feb 1996 - Mar 1996 Lead Piping Designer (AutoCAD 12)

Aker Engineering. Aberdeen.

Amoco - Arbroath Platform. Isometrics, Pipe supports & Checking.

Nov 1995 - Feb 1996 Senior Piping Designer (AutoCAD 12)

Brown and Root, Aberdeen.

Total - Dunbar, North Alwyn and St. Fergus.

Sep 1995 - Nov 1995 Lead Piping Designer

AMEC Process and Energy, Aberdeen.

LTFD Brent Charlie Detailed Design. Service water header & Distribution. Wellbays & water injection.

May 1995 - Sep 1995 Lead Outfitting Designer (AutoCAD 12)

Sener Ingeneria Y Sistemas,

Madrid, Spain.

All drawings, MTO's and Technical Data were to be completed in technical Spanish.

For the Texaco Captain Project. (F.P.S.O.)

Nov 1992 - May 1995 Lead Piping Designer

AMEC Process and Energy, Aberdeen.

LTFD Brent Charlie and Bravo Detailed Design. M.O.L. Chemical Injection package, Service Water

Distribution Water Injection & Area de-classification.

Apr 1992 - Nov 1992 Field Engineer / Senior Piping Designer.

AOC International, Aberdeen / Offshore

Shell Gannet 'A' Hook-up and commissioning. Line punching, As-builts & Hydro testing.

Nov 1991 - Apr 1992 Senior Piping Designer

John Brown Engineering, Aberdeen.

Elf Enterprise Caledonia, Flotta Refinery.

Aug 1990 - Nov 1991 Senior Piping Designer

Foster Wheeler Wood Group, Aberdeen.

BP Magnus Water Injection Upgrade Layout of Water Injection Pump. Chevron Ninian Third Party Project. Layout of Module 11 (Gas Compression)

Apr 1990 - Aug 1990 Senior Piping Designer

OilFab Group Ltd, Aberdeen.

BP Magnus and BP Thistle Call Off contracts.

Oct 1989-Apr 1990 Senior Piping Designer

Wimpey Offshore, Aberdeen.

Phillips Moira & Mobil Gas Sales (Beryl Alpha & Bravo)

Aug 1989 - Oct 1989 Senior Piping Designer

ALC / Brown and Root, Aberdeen.

BP Forties Artificial Lift Consortium.

Jun 1989 - Aug 1989 Senior Piping Designer

Fluor Daniel, Haarlem, The Netherlands.

Du Pont BV Lycra Plant, Dordrecht.

Feb 1989 - Jun 1989 Piping Designer / Senior Piping Designer

Offshore Design Ltd, Aberdeen.

Occidental Claymore Platform and Flotta Refinery (AutoCAD 10)

Oct 1988 - Feb 1989 Senior Piping Draughtsman

Press Offshore Ltd, Wallsend.

Shell Kittiwake Project.

Sep 1988 - Oct 1988 Piping Designer / Draughtsman

Clol, South Shields.

Amerada Hess Rob Roy / Ivanhoe Conversion Platform.

Jun 1988 - Sep 1988 Piping Designer / Draughtsman

Redpath Engineering, Stockton-on-Tees.

BNFL Refurbishment Project.

Mar 1988 - Jun 1988 Piping Designer / Draughtsman

Mapel-Norge A/S, Stavanger,

Norway.

BP Gyda (Norway / Scotland) and Statoil Vesselfrikk (Norway).

Jan 1987 - Mar 1988 Piping Draughtsman / Surveyor / MTO

Caxios Pipework Systems, Cumbria.

MASWEP EP1 - BNFL Sellafield. Bibby's edible oil manufacturing plant (Liverpool).

Aug 1986 - Jan 1987 Mechanical Draughtsman

American Air Filters, Cramlington.

Mechanical MTO. Conoco Loggs field.

Jul 1985- Aug 1986 Piping Designer/ M.T.O.

Kvaerner Brug. Egersund.

Norway.

Gullfaks 'C' project

Jan 1985 - Jul 1985 'Spooler' Piping Controller

HamiltonBros Oil and Gas, Northumberland

Esmond, Forbes and Gordon Hook-up and commissioning. Tagging & punchlisting. Part of the offshore construction team

May 1984 - Jan 1985 Piping Draughtsman

Press Offshore Ltd, Wallsend.

Hamilton Bros, Esmond, Forbes and Gordon. Construction Isometrics,

Sep 1978 - May 1984 Apprentice Draughtsman / Piping Draughtsman

Charlton Leslie Offshore Ltd, Wallsend.

Piping, mechanical and structural training on various construction projects including Chevron Ninian, Phillips 66 Maureen, Marathon Brae 'A' and Hydrocarbons Morecambe Bay.

[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.