Freelance project manager
project management or site management
| Rating: | Unrated (New) |
| Hourly Rate: | |
| Available From: | Seller ID: | 289976 |
CV
Qualifications:-
City & Guilds full Tech Cert,( HNC ) Mechanical Eng`g
Assoc.Inst.prod`n.Eng`s. T.Eng(CEI)
Computer literate- Autocad, Word, Excel, and MS project software, plus sage accounting
Experience:
`01 - present - Director - k4Projects Ltd - numerous contracts carried out including:-
RJLewis Projects - Contract Project Engineer / design manager - Various building services projects involving HVAC, mechanical services and design solutions for refurbishment projects
Site services -Shell medical centre, and CD Hydro project.
Production of tender packages, and Planning supervisory role
Lab refurbishment-Saffil- design outline HVAC and ventilation system
Extraction system design - QVC
Mivan Telecommunications- Project Co-ordinator - Covering planning and detail design packages in house and site based telecommunications sites for Greenfield and rooftop projects
Insolvency Service London - Site Design Manager - Building Services- Coordination and design of new building services to co-ordinate with office refurbishments - 5 storey building M & E Services design and management/co ordination with construction, installation of services. £ 2m plus
Merseyside Police - Site Manager - Design/construction of police training area, including civils roadway, underground tankage, drainage and surfacing for petrol handling conditions
Ineos Chlor - Site Project Manager - Refurbishment of offices/labs, new construction of temporary accommodation, planning and installation works, temporary services etc.., new construction medical centre extension, refit of existing administration office blocks, services upgrades etc. £2m plus
KDS Ltd / KDS Projects `95 - 2001
Numerous Multi discipline Projects including:
ABB - Power - Project Director - Various power station site projects
Including design of new pump house and pipework system for boiler feed and including pipe bridges, civils foundations, etc. Circa £ 200k design package
Astra Zeneca - Project director - Various site based small projects for site services and building maintenance, involving project management and engineering liaison with preferred site contractors for installation
MK International ( Worldcom ) - Project Director - Overall control for in house and site based design team for Telecommunications design projects, covering planning and detail design drawings for mast sites, greenfield and rooftop packages, also structural and electrical engineering design
Rhone Poulenc Rorer - Project manager - Overall control for Tank farm design and site installation supervision package
Including tanker loading/offloading, mechanical electrical and control systems design, civils roadways, drainage, and construction design, process design. Contract package Circa £200k
Hercules / Betz Dearborn- Project Director- Factory transfer and relocation -Winsford to Widnes, re-development of Widnes site to accommodate and plant design, procurement and sub contract installation. Circa £ 600k contract package
Projen Ltd.-Northwich (formerly- MDA-Engineering Projects Ltd)
March 82- `95 Positions- Project Manager / Q.A.-Manager / Resources Manager
Various Projects including:-
Betz UK-Winsford- New process mixing vessel installation including, pipework, electrics, civils foundations, structural steelwork/platform, and pumping facility. Design and procurement package, with installation.- Project manager
Betz UK-Winsford-New Tank Farm installation, including design, procurement,& installation of two double compartment storage vessels plus process pumping and pipework, site management & in house design- Project Manager
Van Den Berg foods-Bromborough-Sugar Paste line design, procure, installation package- Project Manager
.
Datac Adhesives-Hyde-New process plant installation, multi vessel package, plus pipework, civils, electrical, structural,& control/instrumentation, for new process production, within existing building confines.- Planning Engineer.
Kimberly Clark-Flint-Forty million pound plant expansion-process/services pipework design- Planning Engineer.-
J.F.Renshaw-Liverpool-Building extension/process plant installation package, design and co-ordination of installation of new plant, services, and building service pipework, electrics, and structures. -Project Manager. -Two million pound package.
BNFL-Sub contract liaison-McQuillan eng`g.-design for in cave assemblies, design team coordination, sub contractor liaison, build supervision.- Project Manager
ICI-R&T -Hillhouse site, Neorad Project-Development from small rig units through to full scale production facility at site, involving new purpose designed building, modular constructed process rigs, pipework, electrics, instrumentation-computer software, clean room facility to class 1,warming rooms, and storage areas. Designed in house, rigs built at sub contractors-site liason, planning liaison, civil/structural liaison, total value-two million pounds, built to programme and budget-fast track requirement-.
Project Manager.
ICI-The Heath-Runcorn-design and development of lab scale rigs for chemists, various installations, involving sub contract liaison / purchasing, installation, planning- Project manager.
BNFL-Capenhurst-Design team (in house) on autoclave enclosures for flask handling, rail access, load cell location/operation, and design of hot boxes/services for process pipework-reprocessing plant- Design team Leader
Various small scale in house projects for:-
ICI Winnington-structural access platforms and plant refurbishment.
Shell research-Laboratory revisions/installations, and demolition packages.
Associated Octel-plant tank level measurement package.
Daresbury Laboratory-design of experimental line equipment for construction/installation, involving-stainless steel high vacuum vessels and associated equipment and services. Design team leader.
Additional Responsibilities:-
QA Manager -Selected to drive company to goal of obtaining BS5750PT.1 accreditation, which was achieved in July 92.
Now responsible for day to day running of the systems and ongoing development of same.
Regular team meetings held and continuous improvement sought, at present modifying system to latest ISO9001 requirements.
Resources Manager-Responsible for day to day resources allocation of in house and off site personnel, totalling eighty plus, for projects, and including CAD and other hardware facilities, currently running 11 workstations, release 11 & 12 Autocad, plus D.T.Publishing and planning systems-MS Project and PMW.
CAD Manager-responsible for incoming work loading/resourcing on Cad stations and personnel, development of IT systems, software/hardware management and budgets/purchasing requirements.
Health and Safety-Management team member, tie in with QA /systems within office, liaison with safety officer, training needs, etc..
Management Business Improvement Team member, involved with development of office business plan, and structure.
Previous employment:-
Contract design/engineering work for--
Pilkington Fibreglass- Designer -Heavy process plant, conveyors, services, ductwork for extraction systems, plant layouts, and mechanical handling.1980/81
Daresbury Laboratory- Designer - design and plant layouts for Synchrotron radiation source, involving initial service and plant installation design and development of shielding and equipment layouts, for vacuum vessels and structures. Vessel mechanical design and liaison with site scientists, converting conceptual design into reality of mechanical equipment.1978/1980.
Previous staff employment:--
T.I.New World- Project engineer -responsible for new plant installation design and re-siting of plant from other sites, strip out liaison, contractor liaison, layout formulation, development of site.
Responsible to works engineer.1978
Babcock Wire Group -design of wire drawing machinery for home and European markets.
Rubery Owen Conveyancer / Electro-Hydraulics -Warrington-1967-77.
Works Engineer -responsible for day to day running of 40 acre site involving plant maintenance, planning, control of staff of 30.Responsiible to group engineer. Budget of 250k for refurbishment of redundant warehousing into new production facility for Karritainers (dock handling mobile cranes)-use of sub contractors & labour, design & planning to complete fast track project to budget.-Two year term.
Redundancy -due to company wind down.
Previously- Project engineer-Responsible to works engineer-promoted.
Designer-Projects office-Site projects design and plant/services drawings.
Apprenticeship -Full engineering apprenticeship, covering all mechanical engineering aspects.
Including work in prototype machine shop, on aircraft undercarriage parts, various machine tool experience.1967
Categories & Skills
Engineering & Technical
Categories
- Building & Construction (Construction)
- Civil & Structural (Construction)
- Construction
- Engineering
- Infrastructure
- Rail (Infrastructure)
Skills
- AutoCAD (Construction - Building & Construction - Software Skills)
- AutoCAD (Infrastructure - Rail - Software Skills)
- AutoCAD (Engineering - Software Skills)
- Bridges (Construction - Civil & Structural - Experience)
- Building Projects (Construction - Building & Construction - Experience)
- Building Services Design (Construction - Building & Construction - Job Role)
- Conceptual Design (Engineering - Experience)
- Construction (Infrastructure - Rail - Experience)
- Construction (Engineering - Experience)
- Construction Manager (Construction - Building & Construction - Job Role)
- Construction Manager (Infrastructure - Rail - Job Role)
- Construction Planning (Construction - Building & Construction - Experience)
- Contract Manager (Construction - Building & Construction - Job Role)
- Control & Instrumentation (Engineering - Experience)
- Control Systems (Engineering - Experience)
- Design Co-ordinator (Construction - Building & Construction - Job Role)
- Design Engineer (Infrastructure - Rail - Job Role)
- Design Engineer (Engineering - Job Role)
- Design Management (Construction - Building & Construction - Experience)
- Design Manager (Construction - Building & Construction - Job Role)
- Drainage (Construction - Civil & Structural - Experience)
- Drainage (Infrastructure - Rail - Experience)
- Electrical Engineering (Engineering - Experience)
- Engineer (Construction - Building & Construction - Job Role)
- Equipment Installation (Construction - Civil & Structural - Experience)
- Equipment Installation (Engineering - Experience)
- Health & Safety (Construction - Building & Construction - Experience)
- Health & Safety (Construction - Civil & Structural - Experience)
- Health & Safety (Infrastructure - Rail - Experience)
- Health & Safety (Engineering - Experience)
- Hydraulics (Engineering - Experience)
- ISO9001 (Construction - Building & Construction - Experience)
- ISO9001 (Construction - Civil & Structural - Experience)
- Liaison Officer (Construction - Building & Construction - Job Role)
- Management (Infrastructure - Rail - Experience - Safety)
- Management (Engineering - Experience - Safety)
- Mechanical Engineering (Infrastructure - Rail - Experience)
- Mechanical Engineering (Engineering - Experience)
- Mechanical Handling (Engineering - Experience)
- Planning (Engineering - Experience - Production)
- Planning Engineer (Engineering - Job Role)
- Process Design Engineer (Engineering - Job Role)
- Process Engineer (Engineering - Job Role)
- Procurement/Buying (Construction - Building & Construction - Experience)
- Production (Engineering - Experience)
- Project Co-ordinator (Infrastructure - Rail - Job Role)
- Project Co-ordinator (Engineering - Job Role)
- Project Director (Construction - Building & Construction - Job Role)
- Project Engineer (Construction - Building & Construction - Job Role)
- Project Engineer (Construction - Civil & Structural - Job Role)
- Project Engineer (Infrastructure - Rail - Job Role)
- Project Engineer (Engineering - Job Role)
- Project Manager (Construction - Building & Construction - Job Role)
- Project Manager (Construction - Civil & Structural - Job Role)
- Project Manager (Infrastructure - Rail - Job Role)
- Project Manager (Engineering - Job Role)
- Rail (Construction - Civil & Structural - Experience)
- Safety (Infrastructure - Rail - Experience)
- Safety (Engineering - Experience)
- Sage (Construction - Building & Construction - Software Skills)
- Services Manager (Construction - Building & Construction - Job Role)
- Site Manager (Construction - Building & Construction - Job Role)
- Site Manager (Construction - Civil & Structural - Job Role)
- Site Services Manager (Engineering - Job Role)
- Site Supervision (Infrastructure - Rail - Experience)
- Software Skills (Construction - Building & Construction)
- Software Skills (Infrastructure - Rail)
- Software Skills (Engineering)
- Steelwork (Construction - Civil & Structural - Experience)
- Structural Engineering (Engineering - Experience)
- Structural Steelwork (Construction - Civil & Structural - Experience)
- Training (Infrastructure - Rail - Experience - Safety)
- Training (Engineering - Experience - Safety)
- Underground (Infrastructure - Rail - Experience)

