Seller 284804 Market Rasen
Responsible for the organisation, coordination and execution of all commissioning activies involved in the installation of new Solar Gas Turbine driven generators on the Alpha and Charlie Platforms which supply the entire Forties Field with electrical power and oversee the completion of all verification and handover certification to G.O.C.
| Rating: | Unrated (New) |
| Hourly Rate: | |
| Available From: |
CV
June 2005-Present
Wood Group Engineering
Greenwell Road
East Tullos
Aberdeen
Lead Instrument Engineer
in the role of
Lead Commisioning Engineer
Apache Oil North Sea
Forties Field Power Generation
Responsible for the organisation, coordination and execution of all commissioning activies involved in the installation of new Solar Gas Turbine driven generators on the Alpha and Charlie Platforms which supply the entire Forties Field with electrical power and oversee the completion of all verification and handover certification to G.O.C.
July 2004-June 2005
Wood Group Engineering
Greenwell Road
East Tullos
Aberdeen
Principal Instrument Engineer
in the role of
Commissioning Co-ordinator
BP Schiehallion FPSO
Co-ordiantion of the various activities and vendor attendances required to complete the offshore of Solar Gas Turbine driven produced water injection pump. Also completion of final handover certification packs based on G.O.C.
November 2003 -July 2004
Wood Group Engineering
Greenwell Road
East Tullos
Aberdeen
Principal Instrument Engineer
BP Forties Unity Re-intsrumentation Project
Fire and Gas and ESD system replacement design engineering and offshore commissioning.
September 2002 - November 2003
Wood Group Engineering
Greenwell Road
East Tullos
Aberdeen
Seconded to Wood~Stork Engineering Alliance, Velson Noord, The Netherlands
Responsibilities ;
Lead Instrument Engineer on the ring-fenced project for the replacement ESD/C&M System on the K15FB-1 Production Platform
Principal Instrument Engineer (Systems)
Generation of Year 2003 Project Plans and manhour estimates
General ISC projects including;
Platform K14 DCS and ESD system modifications to accommodate upgrade of the platform air supplies.
Platform K81 DCS and ESD system modifications for the renewal of the gas supply and signal interface to replacement gas generators.
Den Helder Gas Terminal; installation of gas chromatographs on the NOGAT export metering.
March 2002 - August 2002
Wood Group Engineering
Greenwell Road
East Tullos
Aberdeen
Principal Instrument Engineer (Systems)
NAM Project
Responsibilities ;
Design Engineering of DCS and ESD system modifications packages for Platform K81 produced water reinjection project.
Design Engineering of DCS and ESD system modifications packages for Platform K81 to accommodate the installation of an umbilical to Platform k82 demanning.
December 2001 - March 2002
Amec Process and Energy
City Gate
Altens
Aberdeen
Certification and Commissioning Engineer
Magnus EOR Project, Sullom Voe
Responsibilities ;
Compilation of GOC Certification in preparation of System Handover to BP Operations and the supervision of the commissioning technicians.
July 2000 - December 2001
Wood Group Engineering
Greenwell Road
East Tullos
Aberdeen
Senior Instrument Engineer
Responsibilities ;
BP ISC contract
Design Engineering and offshore commissioning of various modification packages for North Everest and Lomond Platforms
Design Engineering for the installation of a gas chromatograph on the BP Schiehallion FPSO.
Jan 1998 - July 2000
Amec Process and Energy
BP Dimlington Terminal
Hull, East Yorkshire
Senior Instrument Engineer
Responsibilities ;
Design Engineering and On Site Commissioning of Projects for BP onshore terminals (Easington & Dimlington) and offshore gas production platforms.
Project Involvement ;
ESD and Fire & Gas system replacement for Easington Gas Terminal ; design engineering and final commissioning.
ECA Project : Tie in of BG gas fields Neptune & Mercury to the BP Cleeton Platform. Special responsibilities for ESD and F&G modifications ; design engineering and final commissioning.
ECA Project : BP Dimlington, Condensate Heater Upgrade ; final commissioning.
Study and cost estimate of halon removal from all offshore installations in the BP Southern Sector.
1994 - 1998
Wood Group Engineering
Greenwell Road
East Tullos
Aberdeen
Senior Instrument Engineer
Responsibilities ;
Design Engineering and On Site Commissioning of Projects on the BP Magnus Platform. Special responsibilities for ESD mods. & upgrade.
Project Involvement ;
Gas Lift facility for low pressure wells; design engineering and commissioning
Produced Water System enhancement; design engineering and commissioning.
Conversion of Platform Control System to Honeywell TDC 3000 ; final commissioning.
Conversion of underperforming wells direct into LP Separator; design engineering and final commissioning.
Design Engineering for converting Water Injection well to Oil Producer.
Recategorisation of Platform Trip signals to ESD.
1993 - 1994
British Steel
Scunthorpe
Instrument Commissioning Engineer
Responsibilities ;
Commissioning of integration of existing plant with new control systems.
Project Involvement ;
Continuos Slabcasting Plant ; Existing plant to Eurotherm T1000 Control System.
Desulpherisation Plant ; Analogue signals into central engineering monitoring system.
Vacuum Degassing Plant ; Existing plant to Fisher & Porter Micro DTI System.
1993
BP Exploration
Magnus Asset
Wood Group Project Centre
East Tullos
Aberdeen
Senior Instrument Engineer
Responsibilities ;
Design Engineering and On Site Commissioning of additional of 5th Water Injection Pump on the BP Magnus Platform.
1993
AOC International
Dyce
Aberdeen
Instrument Commissioning Engineer
Responsibilities ;
Offshore commissioning of various topsides instrumentation packages on the Elf Saltire Platform.
1992 - 1993
British Steel
Scunthorpe
Instrument Commissioning Engineer
Responsibilities ;
Final Design and Commissioning of Air Mist Cooling System for steelmaking vessels which was controlled by Fisher & Porter Micro DTI System.
1988-1992
ICS Scotland Ltd.
Abbotsinch Industrial Estate
Grangemouth
Stirlingshire
Instrument Systems Engineer
Responsibilities ;
Design Engineering and On Site Commissioning of addition of various instrument and ESD systems including the following ;
Project - Forties 'B' Multiphase Pump
Client - BP Pet. Dev., Aberdeen
Project - G4 Polyethylene Plant ESD
Client - BP Chemicals, Grangemouth.
Project - Magnus Platform , ESD Wellbay Facilities Extension
Client - BP Exploration
Project - Claymore Platform, Fire and Gas System Power Supply mods.
Client - Occidental
Project - Magnus Platform, ESDV Installation on Oil and Gas Export Lines
Client - Client - BP Exploration
Project - Welton Gas Gathering Centre, waste gas incinerator shutdown and control panel (Taylor Mod 30)
Client -BP Pet. Dev., Aberdeen
Project - AN4 Acrylic Nitrile Reactor Upgrade and sequence control panel (Rosemount RS3)
Client - BASF, Sealsands, Teesside
Project - Phthalic Anhydride Plant, Reactor control system upgrade & DCS
Client - BP Chemicals, Saltend, Hull
1979-1988
Daniel Industries Ltd.
Lochlands Industrial Estate
Larbert
Stirlingshire
Electrical Engineer
Responsibilities ;
Design Engineering of electrical packages including distribution switchgear, motor control centres, lighting, traceheating and installation of instruments on skid mounted fiscal metering system packages.
Also supervision of installation contractors and calibration of field mounted equipment. Occasional On Site Commissioning including 6 months on Das Island, UAE and various Petrochemical Facilities in Norway.
Categories & Skills
Engineering & Technical
Categories
Skills
- Commissioning (Energy - Oil & Gas - Experience)
- Commissioning (Infrastructure - Water - Experience)
- Commissioning (Infrastructure - Water - Experience - Plant )
- Commissioning Engineer (Energy - Oil & Gas - Job Role)
- Commissioning Engineer (Infrastructure - Water - Job Role)
- Control Systems (Energy - Oil & Gas - Experience)
- Control Systems (Engineering - Experience)
- Design Engineer (Engineering - Job Role)
- Design Engineer (Infrastructure - Water - Job Role)
- Electrical Engineer (Energy - Oil & Gas - Job Role)
- Electrical Engineer (Engineering - Job Role)
- Electrical Engineer (Infrastructure - Water - Job Role)
- Electrical Engineering (Engineering - Experience)
- Electrical Engineering (Infrastructure - Water - Experience)
- Engineering Design (Energy - Oil & Gas - Experience)
- Gas Turbine Generators (Energy - Oil & Gas - Experience)
- Installation (Energy - Oil & Gas - Experience)
- Instrument Engineer (Engineering - Job Role)
- Offshore (Energy - Oil & Gas - Experience)
- Onshore (Energy - Oil & Gas - Experience)
- Plant (Infrastructure - Water - Experience)
- Principal Engineer (Engineering - Job Role)
- Principal Engineer (Infrastructure - Water - Job Role)
- Project Engineer (Energy - Oil & Gas - Job Role)
- Project Engineer (Engineering - Job Role)
- Project Engineer (Infrastructure - Water - Job Role)
- Senior Engineer (Energy - Oil & Gas - Job Role)
- Systems Engineer (Engineering - Job Role)

