Freelance Piping Designer Ferndown
Piping Design
Senior Designer Piping and Layout - Microstation and PDS/PDMS
Dow Chemical Asian Pillar Project.
| Rating: | Unrated (New) |
| Hourly Rate: | |
| Available From: | Seller ID: | 284727 |
CV
NATIONALITY BRITISH
QUALIFICATIONS INDENTURED TECHNICAL APPRENTICESHIP
CITY & GUILDS FULL TECH. CERTIFICATE (MECH)
O.N.C. MECH. ENG.
CAD EXPERIENCE PDMS DESIGN & DRAFT
INTERGRAPH MICROSTATION & PDS
EXPERIENCE
Jan.2006 - To Date AKER KVAERNER (UK) Havant Office
Senior Designer Piping and Layout - Microstation and PDS/PDMS
Dow Chemical Asian Pillar Project.
July 2005 - Dec 2005 EXXON / MOBIL FAWLEY SITE
Site Survey and Field Engineering - Distillation Unit
Reasponsible for piping surveys, levelling and construction
support for turnaround and pre-turnaround workload.
Jan. 2005 - July 2005 SHEDDEN UHDE
MELBOURNE AUSTRALIA
Senior PDMS Designer
Caltex Clean Fuels Project
Piping studies and layout for Caltex Brisbane site.
Isometric production and generation of draft drawings.
Use of Model Review. Clash checking.
Mar. 2004 - Dec.2004 ESSO PETROLEUM FAWLEY SITE
Site Survey work for Foster Wheeler
Constuction support and tie-ins for Scanfiner interface.
Dec 2003 - Mar 2004 SOFRESID AQUITAINE
PAU, FRANCE
Senior PDMS Designer.
Erha FPSO Project for Esso Nigeria
Piping studies,equipment modelling and Isometric production/co-ordination
Pipe support placement using Excel.
July 2000 - Nov. 2003 JACOBS ENGINEERING
PHILADELPHIA, USA
Senior PDMS Designer.
Piping and layout project for Centocor - Lieden.
Piping and layout projects for Merck:
Building 69D - West Point, New Varicella
and Merck Singapore projects. Use of Model Review
and conference meetings.
Feb 2000 - July 2000 KVAERNER PROCESS
NETHERLANDS
Process area layout and equipment modelling - PDMS
Solvay Pharmaceuticals
April 1999 - Feb 2000 BURNS & ROE
NEW JERSEY, USA
Senior PDMS Designer.
Design and Layout of new power plant for Merck. West Point
Site - PA. Equipment Modelling. Piping studies and layout and use of draft
___________________________________________________________________________
July 1997 - April 1999 KVAERNER, OSLO
Senior PDMS Designer
Area Piping Lead Asgard "B" offshore development.
Equipment modelling, design studies and isometric production through to project completion.
April 1996 - July 1997 JOHN BROWN E & C LTD
NEW JERSEY, USA
MERCK & CO INC
PDMS Designer
B.O.D. and design work for Merck on site at the Stonewall plant in Virginia - Crixivian project.
Piping PDMS design work, model reviews at site/office co-ordination.
Flint River Project - Georgia
Engineering back-up for construction with PDMS on site and use of Model Review.
Danville PA Avermectin Project.
Jan 1995 - April 1996 JOHN BROWN ENGINEERS & CONTRACTORS LTD
Dow Corning Project - South Wales
Preparation of piping studies. Equipment modelling and plant layout for Dow Corning chemical plant. Input of study work into PDMS system.
Samad Project - Saudi Arabia
Piping Studies of 2-EH plant using PDMS system.
Field Engineer on site.
March 1992 - Dec 1994 NORWEGIAN CONTRACTORS, OSLO
Heidrun TLP Project
Senior piping checker/co-ordinator. Responsible for co-ordination of piping and pipe support engineering drawings, to meet scheduled issue dates. Liaison between site and office regarding changes, solution to clashes, updating and re-issue of drawings. Use of Intergraph Microstation 5 and PDS.
Troll Project GBS
Senior piping designer/checker co-ordination of piping and pipe supports. Checking of piping special items and mechanical details and pipe supports. Use of Intergraph Microstation 5 and PDS.
____________________________________________________________________________
Feb 1991 - March 1992 ABB GLOBAL ENGINEERING AS., ASKER, NORWAY
Statoil - Sleipner Condensate Project Karsto
Preparation of layouts and piping studies of land based condensate terminal-process area. Preparation of piping studies for input into CAD Intergraph PDS system. Checking GA's and ISO's from the computer. Attending meetings with vendors and dealing with vendors' mechanical drawings. Use of Intergraph Microstation 5.
July 1990 - Feb 1991 SNAMPROGETTI, BASINGSTOKE -
MATTHEW HALL - LONDON
Senior Piping Designer
Initial studies and layout work. Preparation of piping studies for Tiffany "T" Block Development. Level 2, separation area Tiffany "A" Platform. Use of PDMS.
Feb 1990 - July 1990 McDERMOTT HUDSON, PERTH, W.AUSTRALIA
Woodside Petroleum - Goodwyn "A" Platform
Senior Piping Designer
Piping work on gas compression module
March 1989 - Jan 1990 AKER ENGINEERING, OSLO, NORWAY
Statoil - Sleipner "A" Project Gas Compression Module
Senior Piping Designer
July 1988 - March 1989 KVAERNER ENGINEERING, OSLO, NORWAY
BP - Gyda Platform
Senior Piping Designer/Checker
Working on separation module. Piping and dealing with isometrics and CAD Clash checks.
____________________________________________________________________________
Dec 1986 - July 1988 ESSO PETROLEUM, WIMPEY ENGINEERING FAWLEY SITE
Senior Piping Designer/Checker
Various revamps and modifications throughout refinery.
Field engineer piping. Engaged on new expansion project.
Residfiner offsites and tie-ins of various units around refinery.
June 1985 - Dec 1986 ESSO OIL REFINERY, LUMMUS CREST FAWLEY
Field Engineer
Responsible for piping. Fawley isomerisation process checking piping systems for hydrotest.
Dec 1983 - June 1985 KVAERNER ENGINEERING, EGERSUND, NORWAY
Gullfaks "A" Offshore Platform
Working in construction yard on piping design for Main Power Generation Module.
March 1983 - Dec 1983 KVAERNER ENGINEERING, OSLO, NORWAY
Elf Aquitaine - Heimdal Gas Platform
Senior Piping Designer
Piping and pipe support work on separation module and cellar deck.
Nov 1980 - March 1983 ESSO OIL REFINERY, FAWLEY SITE
Esso Chemicals
Modifications and updating of piping systems -
flowsheets and GA's - various units and offsites
C.J.B. (Esso Chemicals)
Updating of safety relief and flare systems on Ethylene Plant-flowsheets, piping GA's and tie-ins. M.E.K. expansion project preparation of piping studies and GA's - checking GA's and ISO's co-ordinating tie-ins.
Foster Wheeler (Esso Petroleum)
Construction planning for shutdown of Powerformer PH1. Co-ordinating engineering disciplines prior to and during shutdown.
____________________________________________________________________________
Aug 1979 - Nov 1980 ZIMMER AG, FRANKFURT, GERMANY
Layout work vessel, orientations on columns and reactors. Preparation of piping studies and GA's for Oxo Alcohol Plant Poland.
Jan 1979 - Aug 1979 BROWN & ROOT, BERGEN, NORWAY
KVAERNER ENGINEERING, OSLO, NORWAY
Onshore/offshore checking GA's and construction surveys offshore on Mobil, Statfjord "A" Production Platform.
Module layout and design on Valhall Joint Project checking GA's and ISO's.
March 1978 - Jan 1979 SNAMPROGETTI, BASINGSTOKE
Piping/Designer Checker refinery layout work. Preparation of piping studies and GA's for computer aided ISO's. Model work and ISO checking - for Amonia Plant - India. GA work for computer on Isoprene Plant - South Africa.
Jan 1977 - Mar 1978 FLUOR, LONDON
Piping design and layout, preparation of final GA's for Aramco Oil, Ju'Aymah Oil Terminal Saudi Arabia.
Tank farm and offshore piping to production platform. Checking ISO's and stress diagrams
Feb 1976 - Jan 1977 McDERMOTT HUDSON, LONDON
Piping Designer/Checker offshore production platforms.
Separation module layout and piping studies for Union Oil "Heather" platform. Preparation of GA's and checking ISO's.
June 1974 - Feb 1976 MATTHEW HALL, LONDON
Piping Designer/Checker offshore production platforms.
Preparation of studies, layouts and GA's for Shell Brent "C" Platform. Module layout and GA's for Mobil Statfjord "A" platform checking GA's and IOS's.
April 1972 - June 1974 POWERGAS, LONDON
Piping GA's and layouts of Modules for offshore production platforms in Arabian Gulf. Some work on model. On site work at Esso Oil Refinery Fawley on construction of Desulphurisation Project.
Categories & Skills
Engineering & Technical
Categories
Skills
- Chemical (Energy - Oil & Gas - Experience)
- Construction (Energy - Oil & Gas - Experience)
- Construction (Engineering - Experience)
- Construction Planning (Construction - Building & Construction - Experience)
- Crest (Construction - Building & Construction - Software Skills)
- Design (Engineering - Experience - Piping)
- Field Engineer (Energy - Oil & Gas - Job Role)
- Languages (Construction - Building & Construction)
- Languages (Energy - Oil & Gas)
- Languages (Engineering)
- Layout (Engineering - Experience - Plant)
- Microstation (Construction - Building & Construction - Software Skills)
- Microstation (Energy - Oil & Gas - Software Skills)
- Norwegian (Construction - Building & Construction - Languages)
- Norwegian (Energy - Oil & Gas - Languages)
- Norwegian (Engineering - Languages)
- Offshore (Energy - Oil & Gas - Experience)
- Onshore (Energy - Oil & Gas - Experience)
- PDMS (Energy - Oil & Gas - Software Skills)
- PDMS (Engineering - Software Skills)
- PDS (Energy - Oil & Gas - Software Skills)
- Pharmaceuticals (Engineering - Experience)
- Piping (Engineering - Experience)
- Piping Designer (Energy - Oil & Gas - Job Role)
- Piping Designer (Engineering - Job Role)
- Piping Engineer (Energy - Oil & Gas - Job Role)
- Plant (Engineering - Experience)
- Power (Engineering - Experience)
- Power Plant (Engineering - Experience - Power)
- Refinery (Engineering - Experience)
- Senior Piping Designer (Engineering - Job Role)
- Shutdown Planning (Energy - Oil & Gas - Experience)
- Shutdown Planning (Engineering - Experience)
- Site Engineer (Construction - Building & Construction - Job Role)
- Site Engineer (Energy - Oil & Gas - Job Role)
- Software Skills (Construction - Building & Construction)
- Software Skills (Energy - Oil & Gas)
- Software Skills (Engineering)

