SearchSearch

Sign In
 Sign in or Register
Buyer zone
Find skilled Sellers for your organisation
Seller zone
Tell organisations about your skills

About us

Contact us

FAQs

Testimonials

Site map

Can we help?
tel0870 389 3244
emaile-mail

infoYou are currently viewing the web site for registered charities, showing discounted Seller rates.


Access our main site

HomeProject Manager
[ Printer friendly ]

Freelance Project Manager Newton Aycliffe, , UK

Project Manager

Rating:Unrated (New)
Hourly Rate:£73.33
Available From:Now
Seller ID: 284430

[ Top | CV | Skills ]

CV

I have extensive project knowledge of :-

• Rail Signalling , Design - Installation –Testing and Commissioning,
• Light Rail Systems[TRAM] Design and Construction 11KVA/750DC Sub-Stations- OHLE – S&C
• Train Describer [TD-TDM] Systems
• Passenger Information Systems [PA & CCTV]
• Working knowledge of OHLE and P-Way works
• Sub-Station installation and power distribution [AC & DC] OHLE and Third Rail
• SCADA control for power distribution and Information Systems
• TPWS & APT
• Train Depot Construction and associated equipment [Main Line & Tram Depots]
• Station Referb projects

Within this scope of work the requirement for :-
• Possession Management
• CDM Regs [Planning Engineer]
• W.B.S. planning & control
• Health & Safety Legislation
• Change Control
• Logistic Management
• Signalling Testing and Commissioning Plans and Strategy
• Method Statements - Risk Assessments- COSH
• ISO9000 control and documentation
• Planning :- Microsoft Project – Shuretrack & Primervera P3/e
• Purchase of equipment within a Rail Environment
• Six Sigma project experience


I have I have experience as a sub-contractor, lead contractor and consultant.

Synopsis
Agent / Consultant Blackpool Borough.Council . Light Rail System[Tram]
Consultant – John Laing Rail [Banbury] – Depot Feasibility Study & Engineering Requirements
Project Manager/Construction Manager - Trackwork Ltd. Tinsley International Freight Terminal
Freight Terminal Referb Project [ EWS-Helioslough.-Railtrack ]
Senior Construction Manager - Metronet Alliance [Atkins Rail ] –Station Referb Project – [LUL]
Project Manager – Connect Project– Metronet TMU – [LUL]
Project Manage [Comms] – Tube Lines [LUL]
Scheme Project Manager – Network Rail – ASPRO [ Western Region – Bristol ]
Project Manager /Consultant –CCTV – PA – Customer Information Systems
Systems Integration Engineer[WBS] – Planning
Consultant – [Rail Systems]
Completions Manager [Principle Contractor Net Rail-Jarvis ]
Project Manager S&T Network Rail
Systems Integration Engineer [Light Rail Systems]
Senior Consultant [Rail Systems]
Construction Manager S&T [Rail Construction]
Senior Project Manager [Rail Construction]
Project Manager S&T [Rail]
Agent Power and Control Systems [Light Rail System]
Site Services Engineer [Civil Construction]
Site Manager M&E [Installation and commissioning]]
Contract Manager
Construction Superintendent [Site Installation]
Site Engineer/Supervisor E [Installation and commissioning]
Service Engineer/ Process Engineer
ARMED FORCES [ROYAL ENGINEERS] APPRENTICE ELECTRICIAN. R.E. [Army Apprentice College Chepstow]





The co-ordination of design, approval of that design , and testing to the approval of the client and HMRI. Management of all site staff associated with the installation of electrical equipment Co-ordination with the Sheffield City Council Road Traffic Dept. on the design of the Road/Rail crossing and Signage required within the City Boundaries The control of all sub-contractors and the associated change control [VO and Site Instructions ] in the following disciplines :- 9 off 11 kva sub/stations and power distribution 750 dc track supplies to OHLE systems including Safety interlocking within the Tram Depot. SCADA Control System for Power Control of nine sub-Stations Road/Rail Crossing Systems P.A. - PABX - and CCTV integrated control systems Safety Signalling - Point Control and Point Indication Systems 25 Car Tram Depot fit -out including all E&M equipment and services inc.:- Wheel Lathe - Battery Room - Control Room -Welding Workshop -Fabrication Workshop - Sanding Loading System. Siemens Vehicle Identification System [VIS] - onboard vehicle control system controlling trackside points and signalling systems [Transponder/Receiver System]


1990 - 1992
Balfour Beatty - Fairclough J.V. Limehouse Link Joint Venture Island Row London E13 7HX
Site Services Engineer

1989 - 1990 Flaxyard Construction Ltd Marco Polo Building 346, Queenstown Road London
M&E Co-Ordinator - B Sky B satellite broadcasting studio

1988-1989 Hart Industrial Doors [ SPEEDOOR ] Rayburn Road Westerhope Newcastle-upon-Tyne
Contract Manager [Rail Systems]

1986-1988 Mannesman Engineers & Contractors Linguaphone House Beavour Lane Hammersmith London
Construction Superintendent

1974-1986 Henry Williams Ltd. Dodsworth Street. Darlington Co. Durham
Site Engineer

1972-1974 Self Employed Service Engineer

1966-1972 B.X.L. Plastics Aycliffe

1960-1966 H.M.Forces [ Royal Engineers]

Employment History

(Oct 2007 & ongoing)

Consultant

Blackpool

To present.

Consultant – 4.5 k Tram / S&C Referbish/Regeneration Project and Two New 11KVA,/650DC Sub-Station


(Apr 2007 to Oct 2007)

Consultant

Train Depot [New Build – 25k ]
Unit 1 Tramway Ind. Estate, Banbury Oxon

1. Feasibility study for new train depot for Chiltern Rail including equipment specification and depot services
2. Power upgrade for Rail Depot and New Main Sewage installation


(Dec 2006 to Apr 2007)

Project Manager and Construction Manager –

Doncaster

Design & Build Contract - Initial Project cost of 3m


(Nov 2006 to Dec 2006)

Principal Contractor

Sheffield

New track alignment, drainage and Flood Lighting inc. 11kva substation and signal modifications
Responsibilities
• Budget/cost control
• Sub-Contracts
• Design Approval with client and Net Rail
• Planning including three week look ahead programme with staff requirements
• Change control with extension to contract and associated claims
• Site Plant Hire & Staffing requirements
• Site Health & Safety
• Method statements - risk assessments - COSH
• CDM documentation


(Jul 2006 to Nov 2006)

Senior Construction Manager

Metronet Alliance – Station Referb Project
Communication, Data, SMS Customer .Information Systems. & C.C.T.V. Station P.A. Communications
Integrate and direct “comms” Fulfil the planned programme of works within the overall works programme
Design changes and Station Access restrictions - Programme/Planning update’s and reporting Cost /Progress to line manager against P3/e programme


(Dec 2005 to Mar 2006)

Project Manager

Connect Project – 1.4m Radio Cab Installation for A C & D Stock
Control and amend programme of work as required to meet ever changing work schedule
Change Control against original management programme and clients requested variations, Delays to programme due to unavailable cab units and associated claims
Schedule materials, some free issue, to the clients programme


(Jul 2005 to Dec 2005)

Project Manager

L.U.L. Tube Lines

Communication, Data, Customer .Information Systems. & C.C.T.V. Station P.A. Communications
Referb. on four London Underground Stations
Integrate and direct sub-contract programme of works within Civil works programme
Design changes and Station Access restrictions with all associated delay and claims
Programme update’s and reports to line manager


(Jan 2005 to Jul 2005)

Scheme Project Manager

ASPRO Network Rail , Bristol

Provide outside third parties with an interface for their projects,
Allocate work packages to Network Rail engineers and sub-contractors,
This included:-
• Issue of Sub Contract’s and associated contract management
• Sub-Contract cost management and change control
• Design control and approval of third party design
• Clients programme of works and integration/ approval
• Possession & protection as required to non rail client


(Jul 2004 to Dec 2004)

Consultant

QinetiQ

Passenger information system, [GPS] .C.T.V. & PA System
Provide client with information on existing rail systems and rail infrastructure. Survey 30 stations for possible refurbishment and advise on type of equipment and equipment approval requirements, programme of works for survey installation and test & Commission, Advise client on type of installation [Sub-contractor interface] and initial cost analysis.



(Jun 2004 to Jul 2004)

Consultant – APM [Rail Systems] -

CTRL

Stratford Box - Skanska Construction
Interface with R.L.E. and Sub-Contractors on Modifications to existing infrastructure,
[ P-Way-OHLE-Signalling] at Stratford Box Construction Site

Professional Qualifications

Computer Tools

City & Guilds in IT Services Microsoft Office 2003 – Word - Access and Excel
Planning Tools Microsoft Project - Shuretrack - Primervira P3/e
****************************************************************************************************************


Member of the Association of Project Managers [MAPM]
Reg. No. RO6793 Dated 31/3/08

PTS 40812408 dated to 06 June 2009 Medical to 20 December 2008
LUL ticket dated to 30 July 2007
Metronet Passport [SPA] ID No TO11814


****************************************************************************************************************



EDUCATION & QUALIFICATIONS

1956 - 1960 MARLOWE HALL COMPREHENSIVE SCHOOL
Newton Aycliffe Co. Durham
Northern Counties School Certificate [4 subjects]

1960 - 1966 H.M.FORCES [ ROYAL ENGINEERS ]
Army Apprentice College Chepstow Monmouthshire
Army Certificate of Education Intermediate Certificate English -Maths - General Studies –
Practical and Theoretical Map reading [This certificate is equivalent to General Certificate of Education [GCE] - O level ]
Army Certificate of Education Senior Certificate English - Maths - Map-Reading - Physics - Engineering Drawing
[ This certificate is equivalent to General Certificate of Education GCE- A level ]
City and Guilds Installation B Certificate - Apprenticed as a Electrician R.E.

1964 Royal School of Military Engineering [Royal Engineers] Chatham Kent
Advanced Grade 2 Electrical Engineers Certificate [ This certificate is equivalent to Higher National Certificate -HNC]

1980 Roxby International Roxty Training Centre Station Road Sidcup Kent
Instrument and measurement Principals Course

1993 Balfour Beatty - Fairclough Joint.Venture. Limehouse Link
Site Safety [Cranes and Slings] [Scaffold and Towers] Residential course of safe systems of work and legislation on construction sites inc.

1995 British Rail S&T Dept Interlogic Control Engineering [ I.C.E. ]CP 18 18, Western Tower Station Hill Reading
Project Management - HSE Legislation - CDM Regs - Site Safety Course run by British .Rail. Projects Eversholt Street London one week residential course


1998 Clough Smith Ltd. Rail Division Suit 4 Lysander Close York
Possession Planning and the use of Pride [3 Day residential course at CATALIS Derby]
Site Emergency First aid - Abrasives & the use of Cutting Tools

2002 Bombardier Carillion Consortium NET Line 1 Project Office Gregory Boulevard Nottingham
Best Practice Health & Safety in Construction

2006 Forgetrack Ltd Thistle House St Andrew St Hertford SG141JA
Primervira P3/e [ Residential Course Edinbrough]

[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.

Register as buyer

Freelancers: (Sellers)


To sell your skills please Register as a Seller for FREE.

Register as seller