HomeConstruction Superintendent Site Engineer
[ Printer friendly ]

Freelance Construction Superintendent Site Engineer Redcar

construction superintendent site Engineer
construction coordinator

Rating:Unrated (New)
Hourly Rate:
Available From:
Seller ID: 284383

[ Top | CV | Skills ]

CV

EDUCATION.

1965 - 1969: Longlands College of Further Education, Middlesbrough, and Cleveland.

1960 - 1964: Lawson School for Boys, North Ormesby,

Middlesbrough, Cleveland.

QUALIFICATIONS.

City & Guilds Certificate.

VOCATIONAL TRAINING.

2004, 3 Day Combined Offshore Survival & Fire Fighting Course.

1 Netherlands Oil & Gas Exploration & Production Personal Safety Log Book.

Petans Offshore Basic 5-Day Fire Fighting Course. GOC Foundation Course.

National Safety Passport - Number - 164788.

BRIEF EMPLOYMENT HISTORY.

I have gained experience and assumed many lead roles whilst being employed on numerous major construction projects and plant shutdowns.

During this time I have been both UK and Worldwide based, including projects that have required Offshore Mobility. I have become familiar with various Codes of Practice including Company Procedures and Certification. Flexibility has been an essential asset to me as I have been employed in a wide variety of environments, and held various positions. These include Construction Manager, Piping Engineer, Hydro test Engineer, Nitrogen leak testing coordinator, Construction Coordinator, Implementations Engineer, Construction Superintendent, QA Engineer, Expeditor, Technical Consultant, and various multi-disciplined Supervisory roles.

CAREER DETAILS

Feb 1998 to date AMEC OIL AND GAS

During this period I have been employed as a QA Engineer a Piping Engineer, Nitrogen leak testing coordinator, Hydro testing Engineer, Construction Coordinator, Construction Superintendent, Expeditor, on numerous projects as listed below.

- Ensuring maximum safety and quality from all personnel on the project

- Working with and inputting into AMEC's JMS system

- Compiling work packs

- Working with WinPcs and GOC completions and commissioning procedures

- Compile information into a completed QA package to hand over to our client at the end of the event

- Testing Welders to EN 287 & ASME 9

- Interpreting information contained in client Drawings & Documentation, Technical reports, also conveying productivity up-dates to site Managers

Throughout my employment I have been fully dedicated to successfully meeting short -term mobilisation and safety and productivity targets.

AMEC ABERDEEN MAY 2006 to Date Construction Coordinator

Offshore Construction Superintendent

Transferred from the Bonga Project, Nigeria to the BG Armada Platform Upgrade.

- Overall control of the onshore and offshore constructions teams

- Putting together constructions work packs

- Preparing a team for the offshore phase of the project

AMEC WALLSEND SEPTEMBER 2003 Bonga FPSO Project Piping Engineer

- Engineer, responsible for writing job cards with the JMS system for the Hook Up phase of the project

- Transferred to the Hook-Up and Commissioning phase offshore Nigeria

- Hydro Test Engineer and on completions move to become the Nitrogen Leak Test Coordinator. On completion of the leak testing I then became a Field Construction Engineer on the installation of extra living quarters to the Bonga. (Sept 2003 to April 2006)

BP. GRANGEMOUTH THREE SHUTDOWNS. QA ENGINEER 2003.

BP. CORYTON CLEAN FUELS PROJECT. CONSTRUCTION SUPERINTENDENT 2003

KA NON-BORIC PROJECT DUPONT WILTON SITE QA ENGINEER 2002.

EXPEDITING TWO STEAM SUPERHEATERS FROM RAMSIS ENGINEERING

BAHRAIN, FOR THE BERRI GAS PROJECT SAUDI ARABIA. 2002.

JV06 OLEFINS SHUTDOWN HUNTSMAN WILTON. . SHUTDOWN SUPERINTENDENT 2002.

HYDROCRACKER SHUTDOWN BP GRANGEMOUTH. . QA ENGINEER 2002.

ACIDS 2 & KA SHUTDOWNS, ALSO MELINAR 5 UPGRADE AT WILTON SITE FOR DUPONT & DUPONT SA. QA ENGINEER 2001.

TERRA NITROGEN SEVERN SIDE WORKS. SHUTDOWN SUPERINTENDENT 2001.

DUPONT SA, T7 SHUTDOWN WILTON SITE CONSTRUCTION SUPERINTENDENT 2000.

CORUS-REDCAR BLAST FURNACE RE-LINES. CONSTRUCTION SUPERINTENDENT 2000.

BP OIL FIELDS WYTCH FARM SHUTDOWN. QA ENGINEER 2000.

TERRA NITROGEN, BILLINGHAM SITE AMMONIA 4 SHUTDOWN, CONSTRUCTION SUPERINTENDENT 2000.

DUPONT SA, WILTON SITE, T8 SHUTDOWNS, WELDING SUPERINTENDENT 1999

DUPONT, WILTON SITE, ACIDS 1 SHUTDOWN QA ENGINEER. 1999.

BP CHEMICALS, BAGLAN BAY, VA PLANT SHUTDOWN, QA ENGINEER 1999.

AND IPA PLANT SHUTDOWN, QA ENGINEER 1998.

TERRA NITROGEN, BILLINGHAM, WEAK NITRIC ACID & AMMONIA 4 SHUTDOWNS,

CONSTRUCTION SUPERINTENDENT 1999.

ICI, BILLINGHAM SITE, METHANOL HEADER REPLACEMENT PROJECT, CONSTRUCTION SUPERINTENDENT 1998.

ICI, ROCKSAVAGE SITE, ETHYLENE PIPELINE DIVERSION PROJECT, SITE SUPERINTENDENT 1998.

ICI, WILTON SITE, CAUSTIC CHLORINE SHUTDOWN, NIGHTSHIFT SUPERINTENDENT 1998.

OCTOBER -1993 TO DECEMBER -1997 A.S.C. ENGINEERING SERVICES

Throughout my employment I was seconded to various major projects in Europe and the Far East.

- Area Piping Engineer for Petronas Labuan Malaysia

- Construction Superintendent for F.I.B. Montage, Leeuwarden, Holland

- Duties included control and supervision of a multi-skilled and multi-national work force

- To meet performance targets and put safety first

- Projects include various paper mill shutdowns in Holland and Germany

- Construction of two small gas power stations, a chemical plant for Akso-Nobel, and a Methanol plant shutdown in Malaysia

MAY 1993 TO SEPTEMBER 1993M.S. AL- SUWAIDI,

CONSTRUCTION SUPERINTENDENT.

CONSTRUCTION OF A POLYPROPYLENE PLANT.

- Main duties included overall control and supervision of a multi-skilled and multi-national work force

- Ensuring maximum safety of the work force as a priority to the project.

- Other duties included installation of mechanical equipment and associated pipe work

- Liaison with QA Department to ensure that all work packs were to client specification

- Technical reports and various administrative duties

JANUARY 1991 TO APRIL 1993 Laing Industrial Engineering & Construction

CONSTRUCTION MANAGER.

CHANNEL TUNNEL PROJECT.

- Responsible for the fixed equipment side of this project

- Covering the installation of the Cooling Water and Fire Main pipe work and supports in the two marine and land running tunnels

- Main duties included overall control of all personnel working on this project

- Ensuring maximum safety at all times

- Keeping in close contact with the safety department to monitor tool box talks are taking place, and the workforce have a good understanding of our safety policy

- Monitoring the movement of all personnel and equipment into the four running tunnels

- Ensuring permits and work areas are all in place for start of each shift

- Liaise with client on productivity and availability of work areas in the tunnels, ensuring equipment is sent to the right work area and the work trains are in the right work area

OCTOBER -1993 TO DECEMBER -1997 A.S.C. ENGINEERING SERVICES

Throughout my employment I was seconded to various major projects in Europe and the Far East.

- Area Piping Engineer for Petronas Labuan Malaysia

- Construction Superintendent for F.I.B. Montage, Leeuwarden, Holland

- Duties included control and supervision of a multi-skilled and multi-national work force

- To meet performance targets and put safety first

- Projects include various paper mill shutdowns in Holland and Germany

- Construction of two small gas power stations, a chemical plant for Akso-Nobel, and a Methanol plant shutdown in Malaysia

MAY 1993 TO SEPTEMBER 1993M.S. AL- SUWAIDI,

CONSTRUCTION SUPERINTENDENT.

CONSTRUCTION OF A POLYPROPYLENE PLANT.

- Main duties included overall control and supervision of a multi-skilled and multi-national work force

- Ensuring maximum safety of the work force as a priority to the project.

- Other duties included installation of mechanical equipment and associated pipe work

- Liaison with QA Department to ensure that all work packs were to client specification

- Technical reports and various administrative duties

JANUARY 1991 TO APRIL 1993 Laing Industrial Engineering & Construction

CONSTRUCTION MANAGER.

CHANNEL TUNNEL PROJECT.

- Responsible for the fixed equipment side of this project

- Covering the installation of the Cooling Water and Fire Main pipe work and supports in the two marine and land running tunnels

- Main duties included overall control of all personnel working on this project

- Ensuring maximum safety at all times

- Keeping in close contact with the safety department to monitor tool box talks are taking place, and the workforce have a good understanding of our safety policy

- Monitoring the movement of all personnel and equipment into the four running tunnels

- Ensuring permits and work areas are all in place for start of each shift

- Liaise with client on productivity and availability of work areas in the tunnels, ensuring equipment is sent to the right work area and the work trains are in the right work area

DEC 1998 TO DEC 1990 Press Production Systems

CONSTRUCTION SUPERINTENDENT,

PORT ELIZABETH, SOUTH AFRICA,

CONSTRUCTION SUPERVISOR, RAVENSPURN HOOK-UP.

- In South Africa I was responsible for the implementation of a training program with recognised qualifications for the welders at the end of a successful training and testing program

- I was responsible for the supervision of a multi-national work force in the construction of four modules

- Employed as a construction supervisor on the Ravenspurn hook-up

1984To 1989 GROOTCON-UK-LTD.,

CONSTRUCTION SUPERINTENDENT.

OFFSHORE MAINTENANCE SUPERVISOR.

GENRAL FOREMAN.

WELDING SUPERVISOR.

During this period of employment I had a number of supervisory roles.

- Superintendent. Jack-up of the Ekofisk Complex, offshore Norwegian sector of the North Sea

- Superintendent. Construction of two modules for the Gaviota Gas Platform in Bilbao Northern Spain

- North Sea Maintenance supervisor and General Foreman on a number of hook-ups in the Dutch sector

1983TO 1984 BLANDFORD OFFSHORE SERVICES,

OFFSHORE WELDING SUPERVISOR,

CODED WELDER.

Welding Supervisor Tyra East Hook-up Danish sector of the North Sea.

Coded welder Hook-up of the TLP Hutton Platform.

1982 TO 1983 REDPATH OFFSHORE LTD.,

CODED WELDER.

Employed throughout the fabrication and erection phase of the Morecambe Bay Modules.

1982GROOTCON-UK-LTD.,

CODED WELDER, BP Magnus hook-up.

1981 TO 1982 BORCO OIL COMPANY, Grand Bahamas

MAINTENANCE SUPERVISOR.

Maintenance Supervisor on Refinery shutdown and upgrade projects.

1980 T0 1981 WILLIAM PRESS AND SONS LTD., Scotland

WELDING SUPERVISOR, SULLEM VOE OIL TERMINAL.

Promoted to Supervisor after two months working as a Coded Welder on this major construction project.

1980 BRYTECH UK LTD.,

CODED WELDER PIPEFITTER, BORCO OIL REFINERY.

Duties included the completion of various specialised welding tasks carried out on a furnace shutdown on site in the Bahamas.

1979 TO 1980GROOTCON UK LTD.,

CODED WELDER, TEXACO TARTAN HOOK-UP,

CODED WELDER, MODUAL CONSTRUCTION YARD HOLLAND.

1964 TO 1979 SMITHS DOCK COMPANY LTD.,

[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.

Register as buyer

Freelancers: (Sellers)


To sell your skills please Register as a Seller for FREE.

Register as seller