Prepared commissioning procedures for control & instrumentation systems and verification/functional performance testing, managed their content, production and approval.
Involved in Factory and Site Acceptance testing, ensuring that equipment conforms to the design specification and demonstrated correct installation and operation prior to the commencement of inactive/active commissioning.
Executed the commissioning process as detailed in the approved commissioning procedures.
Participated in Operations and Maintenance personnel orientation, inspection, and training at the handover stage.
Sat on Test & Commissioning HAZOPand Optioneering panels.
Prepared Commissioning Programs/Plans that detailed commissioning activities in a logical sequence, described the commissioning organisation and testing including commissioning team structure and required commissioning procedures.
Managed the commissioning through the organisation of meetings, tests, demonstrations, training events, and performance verifications described in the contract documents and approved commissioning procedures.
Ensured commissioning procedures were followed and signed off with adequate recording of the test results and that reservation lists were raised and reservations cleared.
| Rating: | Unrated (New) |
| Hourly Rate: | |
| Available From: | Seller ID: | 284345 |
CV
Profile:
HND qualified and British Nuclear Fuels time served Control and Instrumentation Engineer. Extensive experience gained within the nuclear sector, highly motivated with proven man management and technical ability, equally comfortable both working as an individual or as part of a team. A good, clear communicator who possesses a high level of integrity coupled with a strong desire to succeed. Current MOD Developed Vetting (DV) security clearance held (22/12/2013).
Employment History:
AWE/Scantec PersonnelAldermaston, Reading. October 06 - Date Commissioning Engineer. |
- Prepared commissioning procedures for control & instrumentation systems and verification/functional performance testing, managed their content, production and approval.
- Involved in Factory and Site Acceptance testing, ensuring that equipment conforms to the design specification and demonstrated correct installation and operation prior to the commencement of inactive/active commissioning.
- Executed the commissioning process as detailed in the approved commissioning procedures.
- Participated in Operations and Maintenance personnel orientation, inspection, and training at the handover stage.
- Sat on Test & Commissioning HAZOPand Optioneering panels.
- Prepared Commissioning Programs/Plans that detailed commissioning activities in a logical sequence, described the commissioning organisation and testing including commissioning team structure and required commissioning procedures.
- Managed the commissioning through the organisation of meetings, tests, demonstrations, training events, and performance verifications described in the contract documents and approved commissioning procedures.
- Ensured commissioning procedures were followed and signed off with adequate recording of the test results and that reservation lists were raised and reservations cleared.
AWE/Scantec PersonnelAldermaston, Reading. January 05 - October 06 Facility Engineer. |
- Acted as the point of interface between the facility & design, technical & maintenance authorities and service providers.
- Identified technical problems evaluated options and formulated solutions to achieve satisfactory conclusions.
- Contributed to business cases, safety cases and option studies and to the design, installation, commissioning and hand over of modifications.
- Reviewed engineering methods, defects, maintenance faults, non-conformance's, operating and maintenance instructions.
British Nuclear Group/NRLSellafield, BNFL Technology Centre January 04 - December 04 Commissioning. |
- Undertook commissioning of Cat 5 Nuclear Research Facilities HVAC system back to Satchwell Building Management System.
- Carried out modifications to BMS software/Configuration of I/O interfaces.
- Liasied with design authority to resolve fault observations raised during commissioning. activities. Checked drawings, calculations, technical documentation and reports.
- Prepared Maintenance Documentation; Proof tests and Maintenance Instructions.
British Nuclear Fuels Plc (Staff) Sellafield, Sellafield MOX Plant March 2000 - January 04 Engineering Shift Team Leader. |
- Managed a multi-disciplined shift team of BNFL, Agency and Contractor staff ensuring that personnel conduct their work in accordance with company quality, safety and regulatory requirements.
- Preparation of risk assessment and safe systems of work.
- Planning of commissioning activities, routine maintenance and the prioritisation of manufacturing assistance and breakdown cover.
- Appointments held include: Duly Appointed Person (LC28 DAP). Authorised Person Electrical (AP(E)) Radiological Protection Supervisor (RPS)
BNFL Engineering Ltd/RullionSellafield, THORP Plant January 1999 - March 2000 Systems Auditor. | Undertook the review of engineering data prior to its input into various asset management and procurement systems. Mapped Electrical Dist System from site supply through to final loads and developed a cause and effects database. |
Enron/General Electric/ESCASutton Bridge Power Station August 98 - December 98 Commissioning Engineer. | Commissioned 3 off GE SpeedTronic Mk5 Turbine control systems with GE 9F frame gas turbines. Provided client services including preparation of O&M documentation, and on site training. |
AMEC Process & Energy/Primat Easington Gas Terminal June 1998 - August 1998 Commissioning Technician. | Commissioned Emergency Shut down (Wormald/Triconex) Gas turbine control and Fire & Gas detection systems. |
Balfour Kilpatrick/Thistle UIE Shipyard, Port Glasgow May 1998 - June 1998 Commissioning Technician. | Commissioning of instrument loops onboard ESSO's Balder FPU. As-built drawings and carried out modification to plant. Preparation of commissioning documentation. |
Balfour Kilpatrick/Thistle British Sugar, Norfolk Jan 1998 - May 1998 Commissioning Technician. | Commissioning of Combined Heat and Power Station. Electrical and Instrumentation associated with Gas Turbine and Boiler Units. |
Southern Electric Contracting ESSO Fawley Refinery October 1998 - January 1998 Advanced Controls Technician. | Commissioning of Emergency Shutdown System. Installation and set to work of plant upgrades. |
Key Skills:
Instrumentation | 9 Years | |
Electrical | 4 Years | |
Commissioning | 5 Years | |
Supervisory | 4 Years | |
Projects | 2 Years | |
Maintenance | 5 Years | |
Industries | Nuclear, Petrochemical, Gas, Power Generation, Chemical. | |
Instrumentation | Pressure, flow, radiometric, temperature, weight, level and speed loops. Control valves, controllers, gas analysers, Inspection Systems. | |
Electrical | Motor Control Centres, Power Distribution Systems, Fire Protection, Evacuation, Gas Turbines, Battery Systems. | |
Mechanical | Active/Non-active Ventilation, electro-mechanical handling plant. |
Categories & Skills
Engineering & Technical
Categories
Skills
- Commissioning (Energy - Oil & Gas - Experience)
- Commissioning Engineer (Energy - Oil & Gas - Job Role)
- Commissioning Engineer (Energy - Nuclear Energy - Job Role)
- Control & Instrumentation (Energy - Nuclear Energy - Experience)
- Control & Instrumentation (Engineering - Experience)
- Control Systems (Energy - Oil & Gas - Experience)
- Control Systems (Energy - Nuclear Energy - Experience)
- Control Systems (Engineering - Experience)
- Detection Systems (Energy - Oil & Gas - Experience - Fire)
- Detection Systems (Energy - Nuclear Energy - Experience - Fire)
- DV (Energy - Oil & Gas - Security Clearance)
- DV (Energy - Nuclear Energy - Security Clearance)
- DV (Scientific & Technical - Security Clearance)
- DV (Engineering - Security Clearance)
- Education Level (Energy - Oil & Gas)
- Education Level (Energy - Nuclear Energy)
- Education Level (Scientific & Technical)
- Education Level (Engineering)
- Fire (Energy - Oil & Gas - Experience)
- Fire (Energy - Nuclear Energy - Experience)
- Gas Detection Systems (Energy - Oil & Gas - Experience)
- Gas Turbines (Engineering - Experience)
- HND Qualified (Energy - Oil & Gas - Education Level)
- HND Qualified (Energy - Nuclear Energy - Education Level)
- HND Qualified (Scientific & Technical - Education Level)
- HND Qualified (Engineering - Education Level)
- Installation (Energy - Oil & Gas - Experience)
- Instrumentation Systems (Energy - Oil & Gas - Experience)
- Mechanical Handling (Engineering - Experience)
- Nuclear (Engineering - Experience)
- Refinery (Engineering - Experience)
- Security Clearance (Energy - Oil & Gas)
- Security Clearance (Energy - Nuclear Energy)
- Security Clearance (Scientific & Technical)
- Security Clearance (Engineering)