Freelance Control and Instrument Engineer
Design, Construction &/or Commissioning Engineer
I have over 20 years of control and instrumentation work experience including a substantial period in design (10 years) and construction/commissioning (4 years). I have a broad base of knowledge that, additional to the above, includes, 18 months at the University of Salford gaining an MSc in Industrial Control Systems, maintenance (1 year), control applications (6 months) and 4 years apprenticeship.
I've worked in many fields and can offer a broad spectrum of past projects including 6 years in the Oil and Gas Industry, 3 years in the Petrochemical industry, 2 years each in the Pharmaceutical and Steel Industries and shorter periods in the Food, Chemical, FGD and Nuclear industries.
| Rating: | Unrated (New) |
| Hourly Rate: | |
| Available From: | Seller ID: | 283988 |
CV
Qualifications: MSc Industrial Control Systems - University of Salford, Salford, Manchester
HNC & ONC (Industrial Measurement & Control) - North Lindsey College of Technology, Scunthorpe
Discipline: Control & Instrumentation - Systems, Applications, Construction,
Commissioning & Design.
Training: Honeywell SCAN 3000 Implementation Course
ABB Master OS500 Configuration & Operation Course
Complementary Office XP, AutoCAD 2004, C Programming, PLC (RSLogix 5) Programming.
Skills:
SUMMARY OF EXPERIENCE
I have over 20 years of control and instrumentation work experience including a substantial period in design (10 years) and construction/commissioning (4 years). I have a broad base of knowledge that, additional to the above, includes, 18 months at the University of Salford gaining an MSc in Industrial Control Systems, maintenance (1 year), control applications (6 months) and 4 years apprenticeship.
I've worked in many fields and can offer a broad spectrum of past projects including 6 years in the Oil and Gas Industry, 3 years in the Petrochemical industry, 2 years each in the Pharmaceutical and Steel Industries and shorter periods in the Food, Chemical, FGD and Nuclear industries.
During this time I have gained experience and knowledge of the following Control Systems: -
ˇFoxboro I/A (Commissioning of interface, I/O & Sequencing)
ˇABB Advant 500 OS (Configuration, Commissioning and basic Programming - Typecircuits)
ˇAllen-Bradley PLC-5 (Programming using RSLogix 5)
ˇHoneywell SCAN3000 (Configuration)
ˇTaylor MOD300 (Commissioning, mainly I/O & Sequencing)
ˇFoundation Fieldbus instrumentation and control systems.
EMPLOYMENT HISTORY
September 2005 to present - FGD Project, Eggborough Power Station, Selby, UK.
C&I Engineer
Responsible for the overall maintenance of a newly commissioned PLC/SCADA system running the FGD plant at Eggborough Power Station. Developed relevent procedures for defeating interlocks during breakdowns, operations and server/workstation backups. Raised PCR's as required for software modifications to the Allen-Bradley Logix 5000 Controllogix PLC and IFix SCADA systems. Involved in software mod verification and testing.
Jan 2005 to August 2005 - Pemex HAKUMS Accommodation Platforms, SLP , Lowestoft.
Senior Instrument Design Engineer (Fire & Gas)
Developed Safety System, F&G detection and Clean Agent specifications. Also engineered and developed F&G layouts and Cause & Effect matrices. Involved in the Bid phase of the project to determine a SIL 3 rated Control System and likely vendor to safely control & monitor 2 off accommodation platform utilities. Liased with suppliers and the client to ensure work progressed to specification, plan and budget.
Sept 2004 to Dec 2004 - BP Operations & Maintenance, Wood Group, Aberdeen & Sullem Voe.
Principal Instrument Design Engineer
Responsible for a small group of Engineers and Designers to provide detailed workscope documents and drawings for the controlled demolition work of various skids including FEED studies and detailed design for a new Methanol Skid. Actively involved and worked closely with the client to provide engineering solutions at agreeable costs to suit both parties.
Nov 2003 to Aug 2004 - BP Operations & Maintenance, KBR (Halliburton), Baku, Azerbaijan.
Senior Instrument Design Engineer
Produced cost estimates, basic planning and workscopes/workpacks to upgrade/maintain/commission FCV's, F&G detection, PSV's and borehole water level control. Involved with FEED, detailed design and initial construction stages. Identified software problems in PLC logic (AB PLC-5) and proposed solution. Installed PLC logic, tested and commissioned.
Feb 2003 to Oct 2003 - SHELL Cleaver Bank High Brownfield Project, AMEC, Great Yarmouth & SHELL Bacton.
Senior Instrument Design Engineer
Produced cost estimates, basic planning and workscopes for various Change Proposals (CP). These CP's comprised of expanding the Control Monitoring System (CMS) and Total Platform Shutdown system (TPS) to incorporate additional I/O from two new platforms (Carrack QA & Clipper PR). Raised Call-off contracts for vendors to supply expertise and equipment. Specified and raised requisitions for instrument and telecoms equipment. Responsible for coordinating and managing CP's to completion.
Sept 2002 to Jan 2003 - West Sole Compressor Project, AMEC, Great Yarmouth & BP, Dimlington.
Senior Instrument Design Engineer
Responsible for the instrument design completion of the above project. This incorporated the following: - Specifying instrumentation, creating datasheets, requisitioning, writing design specs and work scopes, revising Cause & Effect matrices, upgrading compressor control logic, upgrading ESD logic, updating SCADA database, raising and answering engineering queries and the supervision of an instrument designer.
May 2002 to August 2002 - Woollybutt FPSO Topsides Installation Project -Merpro Ltd, Nailsea, Nr Bristol
Instrument Design Engineer
Created and updated Instrument Test, Factory Test and Pre-commissioning in-house documents for Merpro Ltd. Reviewed and updated P&ID's, instrument design package, Control Philosophy and Cause & Effect documents and issued to the client (Vanguard IOM) for construction.
November 2001 to April 2002 - Various Projects -IMPaC Offshore Engineering GmbH, Hamburg, Germany
Snr Instrument Design Engineer
Responsible for delivering front-end technical specifications and front-end instrumentation documents/drawings to the main client (SPDC Nigeria). Liased with clients on a consultancy basis to answer any queries raised by their bidders/ vendors and suppliers. Required to attend various meetings with clients and suppliers including HAZOP meetings. Attained knowledge of IEC 61508 to assign SIL to SIF's. Also attained knowledge of Foundation Field bus.
July 2001 To October 2001- LPG Instrumentation Upgrade - ZUEITINA, Zueitina LPG Terminal, Libya
Instrument Construction Engineer
Responsible for overseeing construction of the above project. Ensured contractor (VOEST-ALPINE) followed scope of work using best engineering practices and company standards. Issued site instructions and answered technical/engineering queries as required.
May 2000 To June 2001 - ULYSSES Project - TRANSCO, North West LDZ, Bolton
Instrument Engineer
Involved in answering any technical/engineering queries the contractor (Logica) may have. As part of a small team surveyed and audited all sites in the North West to eventually result in the upgrade of all of this regions telemetery systems (160+).
October 1999 To May 2000 - DF1 Upgrade Project, Tate & Lyle, Selby
C & I Engineer (Design, Construction and Commissioning)
Site survey of 5 molasses/sugar fermenters + utilities. Created engineering design documents - I/O Schedules, Datasheets etc. Specified and ordered instrumentation. Developed process and sequence control narratives ready for implementation onto a Foxboro I/A DCS. Oversaw construction sub-contractor. Actively involved in commissioning the DCS, field instrumentation and plant process.
April 1999 to September 1999 - Balder FPSO (Floating Production Storage and Offloading) Project (ESSO Norway) - ABB, Port Glasgow
DCS Commissioning Engineer
Involved in the pre-commissioning of most systems associated with this type of project. I.e. ESD, F&G, PSD and Topsides. Scope of work mainly consisted of assisting the clients (ESSO) techs with solving hardware system faults and highlighting software faults on ABB's MasterPiece and MasterAdvant equipment. Knowledge attained of ABB's AMPL programming language, including PC elements and configuring Database elements. Designed and built Typecircuits.
November 1998 To April 1999 - Triton Project - Honeywell Control Systems, Bracknell
PLC Application Engineer
Knowledge attained in Allen-Bradley PLC-5 programming using RSLOGIX 5. Work involved typically converting customer narratives/control philosophies into PLC-5 software then testing with the customer during FAT. Configuration of hardware and DH+ comms using RSLINX Lite.
May 1998 To October 1998 - Amoco Bacton Renewal Project - Honeywell Control Systems, Bracknell & Bacton
C & I Design Engineer (Systems)
Involved in the Select and FEED stage of a plant wide control system upgrade. Major work consisted of typically a site survey to determine I/O and discussions with operations and process personnel to determine PCS/PSD/ESD applications. Knowledge attained in FDDI networks & Honeywell SCAN 3000 based SCADA systems.
March 1998 To May 1998 - Alba (Northern Platform) Phase 2B Project, - Amec Process & Energy, Aberdeen
Instrument Engineer
Requisition Engineer responsible for checking Vendor work pack. Engineering checks on ESD, PCS and Fire & Gas documentation. Produced calculations for I.S circuits. Produced report and documentation based on these calculations
September 1996 to February 1998 - University of Salford -MSc Industrial Control Systems
Student
January 1996 to August 1996 - Petrotrin Oil Refinary - Point-a-Pierre site, Insertech Carribean Ltd, San Fernando, Trinidad
Senior Instrument Construction Superintendent
In charge of 40+ men (instrument fitters, semi-skilled and expat instrument techs) in a total instrumentation revamp of a Cat-Cracker and Gas Conversion plant. Responsible duties:- Liasing with the main contractor's (SNC Lavalin) engineers and designers ensuring design or engineering problems were dealt with quickly, Liasing with the Safety Officer ensuring the men were working in safe conditions at all times, Ensuring the work progressed to the planned schedule, Daily report writing, Ensuring all updated engineering documents were correct for handover to Petrotrin, Ensuring instruments were calibrated and loop checked to procedure and shedule.
May 1995 to December 1995 - Ciba-Grimsby Grimsby S.Humberside - Various projects
Instrument Designer/Engineer
Up dating P&ID of Solvent Recovery Stills following a site survey. Created a Decommissioning package for the above. Produced documents explaining the analogue and digital control philosophy of a DMF distillation plant. Designed ESD relay logic systems and relay logic sequencing to control the above plant. Created a design package (ie. Instrument index, Cable block diagrams, Cabinet layout, loop, Process hook‑up, Pneumatic hook‑up, Location drawings, Bulk MTO's etc.) for construction and commissioning.
February 1994 to April 1995 - Roche Products Dalry Ayrshire Scotland - CHP DCS Replacement Project
Instrument Designer/ Engineer
Surveyed two oil fired boilers and steam turbines. Up‑dated PID and instrument location drawings. Designed the interfacing of existing equipment (i.e. Burner Management, Turbine Control, Generator Control systems etc.) to an ABBMASTERPIECE DCS from a KENT P4000 system. Specified and ordered instrumentation and other equipment. Created a detailed design package (i.e. cable block diagrams, loops, termination schedules, hook‑ups, GA's etc.) supervised sub‑contractor's Electrical/Instrument Technicians and liased with their Engineers to answer technical and engineering technical and engineering queries.
November 1993 to January 1994 - SCM Chemicals Stallingboro South Humberside - APV Ore Drying Project
C & I Commissioning Engineer
In charge of loop checking and writing up loop check, test ,calibration and cable test/spec.sheets. Proving measurement and control loops. Proving Allen Bradley PLC/Field I/O's. PLC sequence testing. Commissioning experience attained in the following:‑ Allen Bradley PLC, Pneumatic conveyors, Nat.gas burner management systems, Conveyor control systems, Motor control systems.
February 1993 to November 1993 - Babcock Energy Ltd - FGD Plant Drax Power Station South Yorkshire
C & I Commissioning Engineer
In charge of pre‑commissioning and commissioning Limestone and Gypsum Dewatering. Commissioning experience attained in the following:‑ Taylor Mod 300 DCS (with TRIO blocks), Autotune (Ziegler Nichols based algorithm), Huwood Conveyors, Senior Davis Derby PLC's, Krauss Maffei centrifuge systems, Hard wired safety interlock systems. Supervised a pool of Instrument Technicians in setting up control loops sequence testing Emergency Shutown Systems. This job also entailed giving out construction work to Babcock's sub‑contractors,liasing with head office on design/construction problems and writing up loop check sheets.
June 1992 to January 1993 - Sizewell B Nuclear Power Station Sizewell Suffolk
C & I Commissioning Engineer
Commissioning Engineer responsible for High Pressure Coolant Injection, Reactor Building Spray and Residual Heat Removal Systems. Scope of work involves following Nuclear Electric procedures in the witnessing of instrument monitoring and control checks on each system, also checking logic diagrams for inherent sequencing faults. Created written Procedures/Method statements for Instrument Technicians to use for calibrating instruments, checking and setting up control loops.
August 1991 to June 1992 - British Gas Easington - (Rough DSS/VDS Replacement Project)
Instrument Designer
September 1990 to July 1991 - BP Chemicals Project Department Saltend Hull - (Various Projects)
E & I CAD Designer
Instrument CAD Designer - ACETYLS TANK FARM MONITORING PROJECT
Instrument CAD designer - S14 DOCUMENTATION
May 1989 to September 1990 - Matthew Hall Engineering BP Chemicals Saltend Hull - S24 Expansion Project
Instrument CAD Designer
September 1988 to May 1989 - Robert James Associates Consultant Engineers Immingham and Hull
Instrument Designer
September 1982 to September 1988 - British Steel Scunthorpe
Instrument Designer (1 year)
Instrument Technician (1 year)
Apprentice Instrument Mechanic ( 4 years)
Categories & Skills
Engineering & Technical
Categories
- Building & Construction (Construction)
- Construction
- Energy
- Engineering
- Infrastructure
- Nuclear Energy (Energy)
- Oil & Gas (Energy)
- Scientific & Technical
- Water (Infrastructure)
Skills
- Block Diagrams (Infrastructure - Water - Experience - Cable)
- C Programming (Engineering - Software Skills)
- Cable (Infrastructure - Water - Experience)
- Commissioning (Construction - Building & Construction - Experience)
- Commissioning (Energy - Oil & Gas - Experience)
- Commissioning (Infrastructure - Water - Experience - Plant )
- Commissioning Engineer (Energy - Oil & Gas - Job Role)
- Commissioning Engineer (Energy - Nuclear Energy - Job Role)
- Commissioning Engineer (Infrastructure - Water - Job Role)
- Construction (Energy - Oil & Gas - Experience)
- Construction (Energy - Nuclear Energy - Experience)
- Construction (Engineering - Experience)
- Construction Engineer (Energy - Oil & Gas - Job Role)
- Construction Engineer (Energy - Nuclear Energy - Job Role)
- Construction Engineer (Engineering - Job Role)
- Control & Instrumentation (Energy - Nuclear Energy - Experience)
- Control & Instrumentation (Engineering - Experience)
- Control Philosophies (Scientific & Technical - Experience)
- Control Philosophies (Infrastructure - Water - Experience)
- Control Systems (Energy - Oil & Gas - Experience)
- Control Systems (Energy - Nuclear Energy - Experience)
- Control Systems (Engineering - Experience)
- Cost Engineer (Scientific & Technical - Job Role)
- Cost Estimates (Energy - Nuclear Energy - Experience)
- Cost Estimates (Engineering - Experience)
- Design (Infrastructure - Water - Experience - Plant )
- Design Engineer (Scientific & Technical - Job Role)
- Design Engineer (Engineering - Job Role)
- Design Engineer (Infrastructure - Water - Job Role)
- Education Level (Scientific & Technical)
- Education Level (Engineering)
- Engineer (Construction - Building & Construction - Job Role)
- Engineering Design (Energy - Oil & Gas - Experience)
- Estimating/Proposals (Construction - Building & Construction - Experience)
- Fire Engineer (Construction - Building & Construction - Job Role)
- HAZOP/HAZAN (Construction - Building & Construction - Experience)
- I/O Schedules (Infrastructure - Water - Experience)
- Instrument Control (Engineering - Experience)
- Instrument Designer (Energy - Oil & Gas - Job Role)
- Instrument Designer (Engineering - Job Role)
- Instrument Engineer (Engineering - Job Role)
- Instrumentation Systems (Energy - Oil & Gas - Experience)
- Method Statements (Construction - Building & Construction - Experience)
- Method Statements (Engineering - Experience)
- MSC (Scientific & Technical - Education Level)
- MSC (Engineering - Education Level)
- Nuclear (Engineering - Experience)
- Operations (Energy - Oil & Gas - Experience)
- Plant (Energy - Oil & Gas - Experience - Process)
- Plant (Infrastructure - Water - Experience)
- Power (Engineering - Experience)
- Power Plant (Engineering - Experience - Power)
- Process (Energy - Oil & Gas - Experience)
- Project Engineer (Construction - Building & Construction - Job Role)
- Project Engineer (Energy - Oil & Gas - Job Role)
- Project Engineer (Energy - Nuclear Energy - Job Role)
- Project Engineer (Scientific & Technical - Job Role)
- Project Engineer (Engineering - Job Role)
- PSV's (Energy - Oil & Gas - Experience)
- Scope of Work (Energy - Oil & Gas - Experience)
- Senior Engineer (Construction - Building & Construction - Job Role)
- Senior Engineer (Energy - Oil & Gas - Job Role)
- Software Skills (Engineering)
- Specifications (Scientific & Technical - Experience - Technical)
- Steam Turbines (Engineering - Experience)
- Systems Engineer (Engineering - Job Role)
- Technical (Scientific & Technical - Experience)
- Technical Specifications (Energy - Nuclear Energy - Experience)
- Technical Specifications (Engineering - Experience)
- Telecoms (Engineering - Experience)

