SearchSearch

Sign In
 Sign in or Register
Buyer zone
Find skilled Sellers for your organisation
Seller zone
Tell organisations about your skills

About us

Contact us

FAQs

Testimonials

Site map

Can we help?
tel0870 389 3244
emaile-mail

infoYou are currently viewing the web site for registered charities, showing discounted Seller rates.


Access our main site

HomeChartered Structural Engineer
[ Printer friendly ]

Freelance Chartered Structural Engineer Bolton

DESIGN OF STRUCTURES, SUPERVISION OF DRAWING OFFICE,DEVELOPMENT OF STRUCTURES,DESIGN AND BUILD,SUPERVISION OF TECHNICAL DOCUMENTS.

Rating:Unrated (New)
Hourly Rate:
Available From:Now
Seller ID: 283967

[ Top | CV | Skills ]

CV

Job Title:Chartered Structural Engineer

Qualifications :

Member of the Institute of Structural Engineers

Membership No.024393965 Mr. Trevor Peter Jones

CPD annotation achieved 2000-2005

Associate Member IStructE 1995-2003

HNC Structural Engineering

ONC Structural Engineering

Structural Technician Apprenticeship

Summary of 32 years Working on Construction Projects:

1985 - 2006 20 years design of components and connections

1979 - 1985 6 years structural design draughtsman at consulting engineers

1973 - 1979 6 years detailing structural steelwork

Summary of Employment :

Steelwork Fabricators : Process Engineers : Consulting Engineers :

William.Hare Ltd. . Glaxochem Ltd Sinclair Knight Merz

Watson Steelwork Costain Engineering Ltd. NW Structural Consultants Ltd.

Fairclough Engineering Ltd. B.N.F.Plc Bingham Cotterell

Madeglade Consulting Eng. Ltd.

Building Design Partnership

Design Group Partnership

EXPERIENCE

2006-Present Watson Steelwork; Bolton.

Temporary works design engineer on New Opening Roof for Wimbledon Centre Court

W Hare LTD., Brandlesholme House,BURY

2006:Multi Storey Office Building on Paddington Cross Rail Deck.Pre-Engineering for construction including Fire Engineering. Temporary stability during construction.

2005-2006:. Office Building 3&4 in Manchester Spinningfields Development.Duties similar to above including design of critical connections.

2004-2005:Lead Engineer for Three storey substructure to The Blenheim Centre in Hounslow("Key-Worker" Residential Housing) .Composite Construction Steelwork Transfer level over Leisure Centre & ASDA Store with basement car park. All areas supporting concrete framed apartments being built above.

2001-2004:M&E retail services support structures.Refurbishment of 1932 BBC Broadcasting House extending original riveted steel frame.Mincing Lane: New office building in Plantation Place London. Throckley School PFI Project for Bovis. Modular construction process plant. This being for extraction of oil from oilsands in Alberta, Canada. Buildings in central London also include .74 St James's Street for HSBC , Broadgate West II for Gemini Investments & 90 Holborn for Skanska.

2001:Airbus A380 wing production facility for Laing. Crane, foundation and wind loading followed by design of overhead gantries for complex Demag cranage system.





2001-2006

2000-2001 Sinclair Knight Merz Manchester

Design of feature external staircases for Richard Rogers Chiswick Development.

Stadium Australia Post - Olympic Stadium Roof.

Royal Northern Collage of Music Student Accommodation.Modular bedroom construction.

Office developments on business parks Involving wind analysis, design of foundations, masonry cladding panels and composite floors.





2000NW Structural Consultants Ltd. Carnforth

Lifting assessments and runway beam design checks for BNFPlc. MAGNOX Power Station at Wylfa in Anglesey during April/May "Outage "period at Wylfa based on LOLER regulations..This included site inspection and report writing and training to Nuclear Site safety and operational requirements.(BNFPlc.Training Card).





1995-2000 W Hare LTD., Bolton

2000:Merrill Lynch European Headquarters for Mace Construction Ltd.

1999:Vinyl Project Qatar for Krupp UHDE / Alexander Gibb and Partners. Millennium Dome display structure National Portrait Zone.

1998:Blast resistant compressor house structures at Karsto LNG terminal Norway for Statoil/MWKellogg. Power station, Saltend Cogeneration Project, Hull for Kier Construction Ltd/Raytheon Engineers and Constructors Inc.

1997:LNG Project OMAN for Chyoda (Japan) &Foster Wheeler Joint Venture.Redevelopment of The Royal Opera House London. Temporary works design allowing "Top down" Construction to second level of basement.

1996: Lead Engineer on Design and build Heathrow Terminal 3 Extension project to re-route a road under Pier 6 , enlarge T3 Baggage Hall and rebuild the South wing office block.

1995:White Rose Centre Retail Development, Leeds. Main floor beams and columns,parapet,mansard plant screens including elliptical atrium superstructure.





1995 Watson Steelwork; Bolton.

North Stand Redevelopment: Design and Build for M.U.F.C. at Old Trafford. Replacing centre section of concrete + steel frame cantilever stand built for 1966 World Cup. New suspended gable frames and abutment with existing corner quadrant stands which were strengthened to suit.





1994-1995 Bingham Coterell , St Helens.

Centro Project Oberhausen Germany. Design work on 150 000 m 2 three storey shopping mall (similar to Meadowhall Nr. Sheffield).





1994 Madeglade Consulting Engineers Ltd. Reddish

Canopy and atrium steelwork design/drawings for SUNTEC City project in Singapore





1992-1994 Glaxochem Limited., Ulverston, Cumbria.

Civil Engineering Department /Pharmaceutical Works Design Office.

Reinforced Concrete and Steelwork Designer including drafting.





1989-1992 Costain Oil Gas and Process Limited., Process Contracting Division.

Designer in Civil Engineering Department Gas Processing Plant and piperacks .Developing scope of work, specification , technical bid evaluation including review of drawings and calculations.Design of "cold box"( low temperature process) gas recovery units.BNFL THORP Project design of frames for transporting decontamination equipment .





1989 BNFL (BNF Plc.); Risley.(onsecondment from MDC Stockport)

1985-1989 Watson Steelwork; Bolton.(incl.Structural Design Partnership).

1985-1987 Building Design Partnership (BDP) Manchester

1979-1985 Design Group Partnership (DGP) -Eccles,Leigh and Irlam-Manchester

1978-1979 Fairclough Engineering Limited-Adlington

1978 Humphreys & Glasgow ; Cheadle Hulme

Apprentice Technician: attending 6 months course progressing to experienced detailer with ONC & HNC in Structural Engineering.

Drawing and checking beams,stanchions,flooring,walways,staircases,ladders,bracing systems,runways,gantries,portal frames, roof trusses etc.

1973-1978 R Watson & Co. Limited; Bolton

[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.

Register as buyer

Freelancers: (Sellers)


To sell your skills please Register as a Seller for FREE.

Register as seller