SearchSearch

Sign In
 Sign in or Register
Buyer zone
Find skilled Sellers for your organisation
Seller zone
Tell organisations about your skills

About us

Contact us

FAQs

Testimonials

Site map

Can we help?
tel0870 389 3244
emaile-mail

infoYou are currently viewing the web site for registered charities, showing discounted Seller rates.


Access our main site

HomeC and I Designer
[ Printer friendly ]

Freelance C and I Designer Borehamwood

Designer, Technical Author, Contract Administration

Rating:Unrated (New)
Hourly Rate:
Available From:
Seller ID: 282851

[ Top | CV | Skills ]

CV

Experience Summary:

ˇ AUTOCAD - up to and including version 2002

ˇ PDMS (viewing and information retrieval only).

ˇ INTERGRAPH Microstation SE and J

ˇ Pafec ICE/DOGS Computer Aided Engineering (CAE) System.

ˇ CAESAR Database (Proprietary BNFL CAE system)

ˇ CAIES database (Proprietary Bechtel CAE system).

ˇ Microsoft Project

ˇ Microsoft Word, Microsoft Access and Microsoft Excel

ˇ Development of Microsoft Access database for design information using VBA.

ˇ Composition of Commissioning Documentation

ˇ Engineers Order definition and Production

ˇ Technical Query and Fault Observations reports

ˇ Site Works Order Production

ˇ Panel General Arrangement, wiring and tubing diagrams

ˇ Loop Testing and Commissioning

ˇ Loop equipment Specification, Procurement, Manufacture Installation, and Maintenance

ˇ Contract Administration: Monitoring, Reporting, Checking, and Certifying equipment and equipment Installation

ˇ Logic and Relay Ladder Logic diagrams

ˇ Control and Instrumentation Loop, Schematic, and Hook-up Diagrams

ˇ Equipment Installation diagram

ˇ Cable connection Management

ˇ Mechanical Handling Control

ˇ Motor Control Circuitry

ˇ Emergency Shutdown and Trip Circuitry.

ˇ Block Cable Diagrams

ˇ Trunking Routing Diagrams

ˇ Familiarity with IS (Intrinsically Safe) Equipment.





Employers:

Mencap

Dates: February 2005 to Present

Position: Support Worker

British Nuclear Fuels Inc., Risley, Warrington, UK

Dates: April 2001 to February

Position: C&I Designer

Projects: BNFL Technology Centre

Duties: Design from initial design concepts and modify existing documentation as required for the following: Panel General Arrangement, Panel fascia layout and Panel Wiring, Junction Box GA and Wiring, Equipment System Wiring Diagrams, Equipment location diagrams, Cable routing, Instrument Loop Schematic, and hook-up diagrams, Cable connection and Equipment Termination diagrams. CAESAR Data entry, supervision and checking.

Employment: Agency Staff

Reason for leaving: Contract completion

British Nuclear Fuels Inc. / CH2MHILL / BECHTEL / Department of Energy, Richland, Washington, USA

Dates: April 1999 to April 2001

Position: Senior C&I Designer

Projects: River Protection Project - Waste Treatment Plant

Duties: To 'Front-end' design Panel General Arrangements; Panel internal Wiring and Termination, Cable Management, Equipment location, and Instrument Loop information. Plan Equipment and Cable procurement and installation time scales. CAEIS Data Entry and monitoring /

Employment: Agency Staff working as consultant

Reason for leaving: Return to Britain: Personal commitments

Fircroft Engineering Ltd, Risley, Warrington, UK

Dates: February 1999 to April 1999

Position: Technical Author: Control Systems (Commissioning)

Projects: SNM Removal Plant: Capenhurst

Duties: Composition of Commissioning Documentation for Instrument and Control Systems.

Employment: Agency Staff

Reason for leaving: Preparation for American Contract through Fircroft Inc. USA

British Nuclear Fuels Ltd., Risley, Warrington, UK

Dates: February 1989 to January 1999

Position: Senior C&I Designer

Projects: EPMF (Effluent Plants Maintenance Facility)

TEM (Tank Emptying Machine)

NEATER/INGRID Robot cable Management

B100A, B102 & B213 Laboratories Refurbishment

Duties: To design and modify existing documentation as required for the following: Panel General Arrangement, Panel fascia layout, Panel Wiring and Termination, Junction Box GA and Wiring, Equipment location diagrams, Cable routing, Instrument Loop Schematic, and hook-up diagrams, Cable connection and Equipment Termination diagrams. Motor Control Circuitry, Mechanical Handling Control diagrams, Interlock Diagrams, Sequence Diagrams, DCS System Cabling, I/O and Connection Diagrams

CAESAR Data entry, supervision and checking.

Employment: Agency Staff

Reason for leaving: Contract Termination

DATS Ltd. Widnes, UK

Dates: November 1988 to February 1989

Position: Senior C&I Designer

Projects: THORP (Thermal Oxide Reprocessing Plant)

Duties: Design of Control Systems for Process Plant

Employment: Agency Staff

Reason for leaving: Security clearance obtained for BNFL, Risley

Taylor Woodrow, Warrington, UK

Dates: October 1987 to November 1988

Position: Senior C&I Designer

Projects: Sizewell B Ventilation System

Duties: To Design Control Loops for ventilation systems, including Instrumentation schematic and hook-up Diagrams, Instrument Location Diagrams, Logic and Relay Logic Diagrams, Motor Control Circuitry, Panel Termination and Wiring Diagrams

Employment: Agency Staff

Reason for leaving: Contract termination

Costain Petrocarbon, Manchester, UK

Dates: April 1986 to October 1987

Position: C&I Designer

Projects: MASWEP

Duties: Design of Instrumentation and Control Loop schematic and hook-up Diagrams, Equipment Location Diagrams, Cable Routing, Panel Termination and Wiring Diagrams

Employment: Agency Staff

Reason for leaving: Personal Commitments

Solvay Interox, Warrington UK

Dates: February 1986 to April 1986

Position: C&I Designer

Projects: Chemical Project - Finland

Duties: Instrument Loop Hook-up Design and Equipment recommendation for procurement and Relay ladder Logic Diagrams for Intrinsically Safe Plant

Employment: Agency Staff

Reason for leaving: Temporary position on return from South Africa

ESCOM (Electricity Supply Commission, South Africa)

Dates: February 1981 to February 1986

Position: Engineering Assistant

Projects: Koeberg Nuclear Power Station

Duties: Contract Administration: consisting of monitoring, recording, liaison with Instrument Maintenance.

Employment: Employed Staff

Reason for leaving: Return to Britain due to illness





DATS Ltd. Widnes, UK

Dates: October 1978 to February 1981

Position: C&I Designer

Projects: Various Chemical and Nuclear clients

Employment: Agency Staff

Reason for leaving: Emigration to South Africa

Imperial Chemical Industries, Manchester, UK

(Pharmaceutical Division)

Dates: October 1977 to October 1978

Position: C&I Draftsman

Projects: IHPT Plant, Macclesfield

Employment: Agency Staff

Reason for leaving: Travelling distance

British Nuclear Fuels Ltd.., Risley, Warrington

Dates: June 1973 to October 1977

Position: Apprentice / Instrumentation Draftsman

Employment: Employed Staff

Reason for leaving: Experience sought





[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.

Register as buyer

Freelancers: (Sellers)


To sell your skills please Register as a Seller for FREE.

Register as seller