Seller 282774 - Grangemouth
| Rating: |
| |
| Hourly Rate: | £45.00 | |
| Available From: | Now | |
| Overview: | Commission | |
CV
EDUCATIONGrangemouth High School
Falkirk College of Technology
Dunfermline Lauder College
Open University.
Institute :M.I.E.T. (Institute of Engineering Technology)
QUALIFICATIONS : B. of Science. (Honours) -Technology
B. of Science. (Open)
Diploma in Systems Practice.
Diploma in Design and Innovation
City and Guilds Certificates in:
Measurement & Control Instrumentation (Credit) 1982 -1983
Mechanical & Automated Engineering (Credit)
(Advanced modules in hydraulic and fluidic engineering)
COURSES : R.G.I.T. Combined Survival Certificate No. 19700
'3' Day Refresher's Nos. K08191/3615 & 09131/05931
Offshore Medical Certificates (British, Norwegian & Dutch)
Hazardous Areas "Ex" 5 day course
Shell "MAPS/PICWS Safety Course No. 2001052
Various internal Rolls-Royce specialised training courses.
EXPERIENCE : Experience gained in various types of industry, e.g. Petro-chemicals,
Power Stations, Paper Mills, Module Yards, Ship-building Yards,
Offshore Oil Production Platforms.
Duties included Construction, Maintenance, Commissioning and
Inspection, also control of labour, permits to work, risk assessments, tool box
talks, and all documentation, up to handover and client acceptance.
I am knowledgeable in all aspects of Process Control, e.g. DCS systems;
Honeywell TDC; Baileys Infi 90; Fisher Provox; PLC systems; Entronics,
GE Fanuc, Allen-Bradley,etc,
Fire and Gas / ESD systems;Wormald; Ics Bailey; August and Silvertech.
Other systems include Hvac, Scada, Drilling and wellhead control, Power &
Rotating Equipment control systems,
Management and Conditioning monitoring systems, etc.
Production Systems Network Commissioning Engineer Work Brief
Wellheads Industrial Estate Feb 07 - Date Commissioning responsibilities for
Dyce, ongoing engineering projects on
Aberdeen Chevron Topsides Delivery Contract
on the Alba, Erskine, Captain
platforms and FPSO vessel.
Rolls-Royce Power Engineering, Rotating Equipment Work Brief
Dunnings Bridge Road, Field Service Engineer Setting up and commissioning of
Bootle, July 99 - Feb 07 Rolls-Royce Entronic FT55/100/110 Merseyside.Control Systems on R-R turbines, eg
RB211, Avon etc for Generator and
Compressor drives,.
Supervision ofpackage installations
and contract labour, project liaising and
engineering interfacing with Clients and
vendors.
Risk assessment appraisals, Permit to
Work, Safety audits and toolbox talks
undertaken.
These duties have been on major
International projects which have
included offshore and onshore plants in
locations such as Algeria, Morocco,
Angola, Qatar, UAE and Russia, as well
as, almost all mainland European
countries.
Dresser-Rand Field Service Representative Work Brief
Southmoor Road, December 98 - July 99 Setting up and commissioning of
Wythenshawe, control systems (GeFanuc),and associated
Manchester. equipment involved with Gas compressors
and Power drives, liaising between company
and clients on all contractual aspects of
project, eg : warranty, design, O & M, and
company liabilities.
Harland & Wolff Senior Commissioning Work Brief
Queen's Dock Supervisor Supervision of Instrumentation personnel,
Belfast, December 97 - December 98 commissioning of all Instrumentation,
Northern Ireland, Vendor equipment and other associated
interface equipment, systems included
ABB Dcs system, Amec / Siemens Plc
System. Completion and handover of
final documentation for platform
acceptance on the Bideford Dolphin
Project.
Klochner International Commissioning Engineer Work Brief
Mazandaran Wood & August 97 - December 97 Commissioning of all Instrumentation and
Paper Industries, associated equipment concerned with a
Sari, Recovery Boiler and Power Plant, this
Iran. included Fisher-Provox Dcs system,
Allen-Bradley and Siemens Plc systems,
all analyser and vendor supplied equipment
and final tuning of control loops.
On site training of Iranian nationals,
(Instrumentation) at MWPI, Sari, Iran.
EMPLOYERS | POSITION & DATES | WORK BRIEF |
M.W. Kellogg, Stadium Way, Wembley, London. Bureau Veritas, Middle East Office, P.O. Box 26264, Abu Dhabi, U.A.E. Grootcon U.K. Yarmouth Business Park, Great Yarmouth, Norfolk. | Instrument Commissioning, Inspection Engineer August 1995-July 1997 Elect/Inst QA/QC Engineer July 1993-June 1995 Commissioning Technician March 1993-June 1993 | Responsible for commissioning of VSD Main Export Gas compressors, turbo-expander and flash gas compressors at Troll Gas Project, Kollsnes, Norway. Duties and responsibilities include supervision, engineering queries, handover documentation, software design changes to Bailey's Infinite 90 DCS system, and all associated Vendor package interfaces. Seconded to client Norske-Shell A.S. for project handover protocol, close-out of commissioning queries. Inspection and verification of the compliance of all Electrical and Instrument equipment for Hazardous area zone classification on Aniline/MNB Plant at I.C.I. Wilton, England, U.K. Employed on behalf of Abu Dhabi National Oil Company as QA/QC Independent third party authority on Adgas 3rd L.N.G. Train, and Certifying authority on Umm Shaif Gas Development Project for Adma-Opco, on Das Island, U.A.E. Duties involved projecting client's Quality standards and expectation of system's completions and documentation. Generation of N.C.R.'s, Technical Queries and system punchlists to M.E.C. and Contractor. Monitoring of all construction and commissioning activities on 3rd L.N.G. Train. On U.S.G.D.P., as Certifying authority, duties involved ensuring that all materials, work practices, construction, pre-commissioning and commissioning activities adhere to B.S. and A.P.I./Project Specifications. Generation of N.C.R.'s and S.Q.'s to M.E.C. Acceptance of T.Q.'s and Spec Waiver requests from M.E.C. and certification of all relevant documentation as representative for Bureau Veritas. Hazop audit and remedial engineering work carried out on John Brown Frame 5's at Margham Gas Plant for Arco, Dubai. Commissioning of I.C.S. E.S.D., Honeywell TDC 3000, Fire-Pumps and Telecomms systems on Chevron's "Alba" Integrated deck module at Zwijndrecht. Holland. |
EMPLOYERS | POSITION & DATES | WORK BRIEF |
Hi-tech Design Services, 3 High Street, Inverness. Foster-Wheeler Wood-Group, Greenwell Road , Aberdeen Orion Engineering, Essich Road, Inverness. | Senior Commissioning, Supervisor August 1991-March 1993 Instrument Technician/ Engineer May 1990-July 1991 Instrument Commissioning Technician QA/QC Inspector November 1989 - April 1990 | Supervision of Instrument personnel on the commissioning of the new Piper "Bravo" Oil Production Platform for Elf Enterprise Caledonia. Responsibilities include setting out work procedures, utilization and time allocations of labour workforce, advocation of system priorities, commissioning and safety systems on, e.g. Ics Bailey "Infinite 90" DCS system, Fire pumps, Deluge and Sprinkler skids, H.v.a.c. systems, Wellhead control, packages and associated vendor equipment. Inspection of all completed systems, clearance of final punchlists and signing over of completed packages to QA/QC at McDermott's Ardersier (Drilling Module) and Offshore. Working on the Control System Upgrade Project (C.S.U.). This is a complete refurbishment, re-instrumentation and new control room project for Shell U.K., on their Dunlin "A" and Cormorant "A" Oil production platforms. My duties involved liaising closely between offshore production and engineering departments and onshore design team, clearing all conceptual and detail design problems. Generation of work packs, packages and systems on clients behalf. As-buildng and interfacing of new systems, these systems were the Honeywell PLC System (for an E.s.d. system changeout), and replacement of full fire and gas system with new advanced ICS system. Commissioning of "Calcam" advanced control system, Fire and Gas, E.S.D. and Baker wellhead system and all related conditions and effects. Also responsible for final documentation clearance for all systems and associated equipment on "Phillip's Audrey II" unmanned gas production platform at McDermott's, Ardersier, Scotland. QA/QC Inspection of installation, completion, documentation, design changes and progressive fault finding at the L.L.D.P.E. Plant, B.P. Chemicals, Grangemouth, Scotland. |
EMPLOYERS | POSITION & DATES | WORK BRIEF |
Morson International, Haypark, Polmont, Stirlingshire. Motherwell Bridge, Wellheads Ind. Estate, Dyce, Aberdeen. Balfour-Kilpatrick ) Glasgow Road ) Renfrew. ) ) ) James Scott, ) 55 Chapel Street ) Aberdeen. ) | Instrument Technician, May 1989-October 1989 Instrument Technician September 1988 - May 1989 Instrument Technician April 1986-September 1988 | Commissioning of Honeywell and Fisher Provox control systems on B.P./Britoil's "Amethyst" gas modules, Clydebank, Scotland. Commissioning and loopchecking of all instrumentation, design changes and final acceptance of Honeywell TDC control system, Omron and Monirex Plc systems, on the Cyclar PCU Experimental Plant at B.P. Refinery, Grangemouth, Scotland. Working for B.P. International on their Ethylene Oxide Plant at Zwijndrecht, Belgium. Workload consisted of checking all instrumentation, installation up to final acceptance, on Honeywell TDC 3000 system. Responsible for signing off all acceptance documentation and clearing any design problems encountered. Working between both companies on commissioning projects, both onshore and offshore, e.g. Pre-commissioning and inspection of instrument packages on Total's "North Alwyn" platform. Commissioning of Ferranti's advanced Fire and Gas system on Britoil's "Clyde" platform. Loopchecking and commissioning of control and instrumentation systems for the new Central Control Room at B.P. Refinery, Grangemouth, Scotland. Commissioning of Chemical Injection system and production wells on Britoil's "Clyde" platform. Commissioning of all production systems and associated equipment on Marathon's "Brae B" oil and gas production platform. Loopchecking and commissioning of instrumentation on new control system for Gasoline treatment unit at B.P. Chemicals, Grangemouth. |
EMPLOYERS | POSITION & DATES | WORK BRIEF |
Haigh and Ringrose, Woodend Ind. Estate, Cowdenbeath, Fife. M & I Instruments, 37 Bo'ness Road, Grangemouth, Stirlingshire. Grangemouth Dockyard Co., Middle Dry Dock, Grangemouth, Stirlingshire. Tarmac Construction, Earls Road, Grangemouth, Stirlingshire. | Instrument Technician March 1985-March 1986 Instrument Technician May 1983-March 1985 Marine Engineer May 1981-June 1982 Service Engineer (Apprenticeship) April 1975-April 1981 | Calibration and commissioning of new and existing instrumentation on LNG units and Flare systems at Fife NGL Plant, Mossmorran, Fife, and new furnace control system on the Catalyst Reformer Plant at B.P. Refinery, Grangemouth. Repair and maintenance of F & G, water and gas injection, and production systems instrumentation on Shell's "Brent", and B.P.'s "Forties" oil production platforms. Overhaul, repair and maintenance of control and safety systems of associated marine equipment, e.g. Compressors, generators, motors, pumps and valves on various sea going marine vessels. Served 4 year indentured apprenticeship, learning all aspects of engineering, e.g. Turning, fitting, welding, mechanical and electrical. Attendance at Falkirk College of Technology on day-release basis. Duties involved engineering repairs on hydraulic, pneumatic, mechanical, electrical and Hvac plant and systems in workshops, construction and civil engineering sites throughout Scotland. |
Categories & Skills
Engineering & Technical
Categories
- Building & Construction (Construction)
- Civil & Structural (Construction)
- Construction
- Energy
- Engineering
- Infrastructure
- Oil & Gas (Energy)
- Water (Infrastructure)
Skills
- Assessments (Risk)
- City & Guilds (Education Level)
- Civil Engineering (Experience)
- Civil Engineering (Experience)
- Civil Engineering (Experience)
- Commissioning (Plant )
- Commissioning (Experience)
- Commissioning (Experience)
- Commissioning Engineer (Job Role)
- Commissioning Engineer (Job Role)
- Conceptual Design (Experience)
- Construction (Experience)
- Construction (Experience)
- Control & Instrumentation (Experience)
- Control Systems (Experience)
- Control Systems (Experience)
- Design (Plant )
- Dutch (Languages)
- Dutch (Languages)
- Dutch (Languages)
- Education Level (Building & Construction)
- Engineer (Job Role)
- Engineering (Production)
- Engineering Design (Experience)
- Experience (Engineering)
- Experience (Water)
- Experience (Building & Construction)
- Experience (Civil & Structural)
- Experience (Oil & Gas)
- Field Engineer (Job Role)
- Hazardous Area Classification (Experience)
- HAZOP/HAZAN (Experience)
- Instrument Engineer (Job Role)
- Instrumentation Systems (Experience)
- Job Role (Engineering)
- Job Role (Water)
- Job Role (Building & Construction)
- Job Role (Oil & Gas)
- Languages (Engineering)
- Languages (Building & Construction)
- Languages (Oil & Gas)
- Marina / Marine (Experience)
- Mechanical Engineering (Experience)
- Norwegian (Languages)
- Norwegian (Languages)
- Norwegian (Languages)
- Offshore (Experience)
- Onshore (Experience)
- Plant (Experience)
- Power (Experience)
- Power Plant (Power)
- Power Stations (Experience)
- Power Stations (Experience)
- Power Stations (Experience)
- Production (Experience)
- QA Engineer (Job Role)
- QA Engineer (Job Role)
- Refinery (Experience)
- Risk (Experience)
- Risk Assessments (Experience)
- Risk Assessments (Experience)
- Risk Assessments (Experience)
- Rotating Equipment (Experience)
- Setting Out (Job Role)
- Systems Engineer (Job Role)

