Freelance Maintenance Planner
Maintenance Planner
| Rating: | Unrated (New) |
| Hourly Rate: | |
| Available From: | Seller ID: | 282171 |
CV
Academic Qualifications:
1981 - 1986 | Bachelor of Science Degree BSc Mechanical Engineering, University of Basrah, Iraq Subjects studied include: Fluid Mechanics; Thermodynamics ; Metallurgy; Heat Transfer; Cooling- Heating & Refrigeration; Industrial Engineering; Electrical Engineering; Internal Combustion Engines; Power Plants; Advanced Engineering Analysis; Strength of Materials; Mechanical Vibrations; Automatic Control; Manufacturing Processes; Mechanical Design;…etc. |
Career History
July/2006-July/2007 AJS-The Netherlands
AJS is the abbreviation of (Amec-Jacobson-Stork) a consortium of 3 companies joined together in one Integrated Services Contract (ISC), a 3 rd party partner to NAM/Shell, both in UK and NL.
Position: Integrated planner.
Tasks:
1-Using Primavera-Enterprise version 5.1, and SAP, I run the master plan (integrated plan) for 2 offshore installations (gas-producing platforms).
An integrated plan is a major plan that consists of 5 embedded sub-plans:
- 1.1-The maintenance plan.
- 1.2-The capital projects plan.
- 1.3- Engineering minor modifications plan.
- 1.4-Well services plan.
- 1.5-Operations plan.
2- Compiling shut down plans; for annual shut downs, from one week to one month detailed hourly plan of the stoppage of the platforms.
3- Running "Change Request" process, whereby feedback is supplied to the functional planners and area coordinators with changes of the plan implications and deviation due to weather/resources restrictions.
Jan./2006- July/2006 Corus-The Netherlands
I had joined "Corus British Steel/ijmuiden" to work as a planning engineer, during which I had issued several plans for new installations as well as existing ones.
The new installations plans were related to the erection of a new production line, where all the working disciplines had to be taken care of; e.g. Construction site and infrastructure, Civil works, mechanical works …etc.
While the plans for existing installations consisted of various maintenance plans ((especially Shut downs)), and one major multi-phases plan for improving the performance of all parts/units of an existing production line, with a time frame of 3 years.
01/08/2005-31/12/2005 GDF-The Netherlands
I joined GDF/ Gaz de France for an apprenticeship/training period of 5 months, which has ended up by joining my last work.
During those 5 months I had the chance to visit the offshore installations twice, had some on-site presentation/demonstration of the processes, and got familiar with the different procedures involved in this industry including the necessary "knack" of putting on the special suit and life vest when boarding the helicopter, and had some first hand information of how to stick to the safety rules and regulations therefore.
My tasks as a trainee planner ((co-planner)) at GDF involved among others:
- Preparing maintenance programs using Primavera Enterprise P3e version 4.1
- Preparing the schemes or planning the ((people on board)) using Excel.
- Participated in preparing Shut down and ((PMFMP)) plans for the next year 2006.
- Participated in preparing the ((aanvlieg schema)) for the heli & boat visits to the platforms for the next year 2006.
-Attending weekly maintenance meeting with the staff of engineers and supervisors from both departments of maintenance and production.
-Holding my own P2P ((person to person)) discussions and attending daily or semi-daily department meetings.
-Having the privilege to our data base program called ((Maximo) which equals (SAP) in other companies, I perform numerous tasks, such as making reservations (bookings) for the heli. flights and approving them ((WAPPRD)) status.
-Using Maximo, I issue work orders, and have the privilege or authority to modify others' work orders.
-Issuing my statistical reports, using the graphical aid of Excel.
-For smaller programs I used MS-Project.
-I use the other "traditional" suite of Microsoft such as Word and Outlook, efficiently, and on daily bases.
2000 - 2005 | Various labor activities at temporary positions in Noord Holland.
Those works included some production activities, anticorrosive
works ((painting and surface treatment)), scaffolding erection at
building sites, operator of some ((clever)) teach-in machinery,
with all the labour skills needed at workshops, plus driving
|
1996 - 1998 | Higher Institute of Technology, Iraq.Lecturer in Engineering Drawing & Industrial Safety Co-lecturer in Strength of Materials |
1988 - 1996 | Petrochemical Compound ((PC3)), IraqMaintenance PlannerDuring this period of work I gained experience with the following processes: o1 Utilities such as steam, industrial / demineralised water, compressed air o2 Salt plant - brine, slurry, salt. o3 Packing plant and associated plastics unit My responsibilities included the following: o Co-ordination of all maintenance activities o Ensuring a high availability & reliability of all plant equipment o Preparing preventive maintenance schedules and annual shut down programs o Carrying out break down and emergency trouble shooting analysis o Writing technical reports o Raising inventory and budget reports o Placing requisitions for equipments and spare parts, and preparation of the required datasheets and technical specifications o Performing quality control on the received materials o Participation in daily, periodical and urgent meetings with the board of plant engineers, shift supervisors, and directors, to discuss the factory performance, and conclude the necessary steps and actions to be made |
1986 - 1988 | Petrochemical Compound ((PC3)), IraqJunior Mechanical EngineerIn this position, I worked in the central mechanical workshop, performing the following tasks: o1 Preparing engineering drawings o2 Reporting the statistics and analysis of the performed activities. o3 Preparing ((production technological path)) of different work pieces such as, bearings, shafts, sprockets, etc. |
Training
Date | Duration | Location | Course Attended |
1995 | One week | Iraq | Industrial Safety |
1993 | 10 Days | Iraq | DATA BASE program - Maintenance database |
2004 | 5 Days | Ned | Primaver/P3, and Network planning, 2 diplomas |
2005 | 3 Days | Ned | Primavera Enterprise 5.1, with diploma |
LanguageSkills
First Language: | Arabic |
Additional Languages: | English - Fluent in spoken & written English |
Dutch -Intermediate, currently following language lessons to enhance my level |
IT Skills
ˇ PC literate, familiar with, Primavera project planner 3.1, P3e, MS-Project 2003, MS Windows, Word, Excel, Coral Quattro- pro spreadsheets, Outlook & Internet.
ˇ Familiar with AutoCAD (2D/3D).
ˇ Completed an Introduction to Mechanical Desktop
Categories & Skills
Engineering & Technical
Categories
- Building & Construction (Construction)
- Civil & Structural (Construction)
- Construction
- Energy
- Engineering
- Infrastructure
- Oil & Gas (Energy)
- Scientific & Technical
- Water (Infrastructure)
Skills
- Arabic (Engineering - Languages)
- Arabic (Construction - Civil & Structural - Languages)
- BSC or Equivalent (Scientific & Technical - Education Level)
- BSC or Equivalent (Engineering - Education Level)
- BSC or Equivalent (Infrastructure - Water - Education Level)
- BSC or Equivalent (Construction - Building & Construction - Education Level)
- BSC or Equivalent (Construction - Civil & Structural - Education Level)
- BSC or Equivalent (Energy - Oil & Gas - Education Level)
- Control (Engineering - Experience - Quality)
- Dutch (Engineering - Languages)
- Dutch (Construction - Civil & Structural - Languages)
- Education Level (Scientific & Technical)
- Education Level (Engineering)
- Education Level (Infrastructure - Water)
- Education Level (Construction - Building & Construction)
- Education Level (Construction - Civil & Structural)
- Education Level (Energy - Oil & Gas)
- Electrical Engineering (Engineering - Experience)
- Electrical Engineering (Infrastructure - Water - Experience)
- English (Engineering - Languages)
- English (Construction - Civil & Structural - Languages)
- Heat Transfer (Engineering - Experience)
- Infrastructure (Construction - Civil & Structural - Experience)
- Languages (Engineering)
- Languages (Construction - Civil & Structural)
- Mechanical Engineer (Engineering - Job Role)
- Mechanical Engineer (Infrastructure - Water - Job Role)
- Mechanical Engineer (Construction - Building & Construction - Job Role)
- Mechanical Engineer (Construction - Civil & Structural - Job Role)
- Mechanical Engineer (Energy - Oil & Gas - Job Role)
- Mechanical Engineering (Engineering - Experience)
- Mechanical Engineering (Infrastructure - Water - Experience)
- Microsoft (Engineering - Software Skills)
- Microsoft (Construction - Civil & Structural - Software Skills)
- Offshore (Construction - Civil & Structural - Experience)
- P3e (Engineering - Software Skills - Primavera)
- Planning Engineer (Engineering - Job Role)
- Planning Engineer (Energy - Oil & Gas - Job Role)
- Primavera (Engineering - Software Skills)
- Project Planner (Scientific & Technical - Job Role)
- Project Planner (Infrastructure - Water - Job Role)
- Project Planner (Construction - Building & Construction - Job Role)
- Quality (Engineering - Experience)
- Software Skills (Engineering)
- Software Skills (Construction - Civil & Structural)
- Surface Treatment (Engineering - Experience)
- Technical Specifications (Engineering - Experience)
- Trainee (Construction - Civil & Structural - Job Role)
- Word (Engineering - Software Skills - Microsoft)
- Word (Construction - Civil & Structural - Software Skills - Microsoft)

