Freelance Project Engineer London
Project Engineer
| Rating: | Unrated (New) |
| Hourly Rate: | |
| Available From: | Seller ID: | 280036 |
CV
Education:
1984 - 1988 | Testwood Secondary School | 8 GCSE's A-C |
1988 - 1992 | Southampton Technical College | C&G 236 Pt 1 + 2 |
2002 | Waltham Forest College of Higher Education | C&G 2380 16th Edition Revised |
2004 | Reading College | C&G 2391 Inspection & Testing |
Items of employer interest
Full Clean Driving License, PTS Card Holder (Un Sponsored with current D&A), IPAF Card holder, LU entry Permit, LUL Medical Track accustomed (23/6/2011), Passport to Safety, Core Engineering & Fire watchman, Quaf 54, Machine Room Awareness.
Employment History
June 2007- 12 th July 2007 Powerminster (A part of the MJ Gleeson Group)
Kenetic House
Borehamwood
Herts
Contracts Manager
A temporary position taken to tie me over till my annual leave. This was to complete the relevant stage of the contract.
Position was to complete the snagging and program retrieval on a social housing project that had fallen behind schedule.
Duties include Procurement, Labour Planning, Client Liaison, H & S Supervisor, and lots of Snagging.
Program was running 2 months behind and was pulled back by 6 weeks.
Time off for Interviews was agreed prior to commencing this position.
May 2007 - June 2007 Mc Nicholas Rail
Elstree
Herts
Electrical Project Manager
Temporary position as agency who placed me was unable to provide
PTS Sponsorship.
Position was to provide the day to day management
of a Load Monitoring Program for the new Network Rail
Communications System, (GSM-R). The programming of site surveys.
Arranging of; safety critical work plans and Rimini applications. This was part of a major ongoing contract.
January 2007 - April 2007 Bailey Rail
Compass House
Redan Place
Bayswater
London
Lead Engineer
Responsible, for the building of new Signal Equipment Rooms.
From the compilation of Method Statements through to; the initial survey of site. From construction to the testing and snagging of works, and finally, the compilation of O&M's. Procurement, labour & Sub Contractor planning, and the commercial viability of the project. Were aspects considered when working to a tight 12 week program.
July 2006 - Jan 2007 Engenica (A Thames Water RWE company)
Engenica House
Wraysbury Reservoir
Middlesex
Project Engineer
Responsible for the day to day running, of the mechanical services refurbishment, of various stations within the London Underground refurbishment program. The position starts at the design level, moving through the setting out of programs. The compilation of method statements. Procurement, Recruitment and running of the works. Finishing up with the final snagging, testing and handover of the station back to the client. All works being undertaken in a very strict timeframe to an even stricter LUL Spec.
July 2005 - July 2006 First Engineering (Network Recruitment)
Platform 1 Euston Station
Mechanical & Electrical Foreman
Responsible for the day to day management of 8 Engineers in the delivery of the reactive and planned maintenance in Euston and Kings Cross Major Stations.
Writing and amending method statements, Checking risk assessments, carrying out spot safety checks on Contractors and Sub Contractors, to ensure they are carrying out there works to the required levels of Health & Safety. Creating a safe working environment where Health & Safety is paramount due to high levels of asbestos, due to the age of the buildings. Ensuring the full backup and support to the specialist sub contractors.
Working to the high specifications that are demanded by Network Rail.
November 04- July 05 Taylor Woodrow Facilities Management
High WycombeGeneral Hospital
Maintenance Engineer (Temporary via McGinley's In Construction)
A completed PFI project. Carrying out, a comprehensive PPM program, with reactive works. Working within a tight completion frame: Dealing with contractors on building works, in day-to-day repairs and on going projects. Completion of risk assessments, approving of contractors Method Statements.
Working with Hot water, Steam & Chilled water systems. Ensuring stable supplies and services, which are paramount to the running of operating theatres.
April 04-October 04 K Gasteratos & Sons. SA.
San Marino Hotel & Beach Club, Corfu
Club Maintenance Engineer
The Installation and Maintenance of the Lighting, Video and Sound Systems along with general maintenance, including Plumbing, Refrigeration, Air Conditioning and other electrical appliances in the complex.
March 03 - April 04 Parkersell Lighting & Electrical
(Electrical Testing & Inspection Division).
ETI Engineer
Duties included the electrical testing of commercial premises including all of the relevant NIC EIC paperwork & Remedial repairs. Also carry out Emergency Lighting & Fire alarm testing and certification.
Feb 02 - March 03 Consumer Direct Lighting (CDL)
Carry out the inspection / repair and maintenance of High Level Lighting on Retail Parks and Industrial estates. The Relevant Fault Finding on Exterior And Interior electrical Systems, BMS Programming, Time Clock Alignment, Carry out Lighting Level (Lux) Testing, along with Health and Safety Evaluations in public Places.
June 1989 - Feb 02 Class A Construction
Shop Fitting and Office Refurbishments
Duties where varied and included all of the relevant electrical work including Fire Alarms, Emergency Lighting, Decor lighting, along with Plumbing, Carpentry, Partitioning and general building work.
Categories & Skills
Engineering & Technical
Categories
- Building & Construction (Construction)
- Construction
- Engineering
- Infrastructure
- Rail (Infrastructure)
- Water (Infrastructure)
Skills
- Assessments (Infrastructure - Water - Experience - Risk)
- Assessments (Infrastructure - Rail - Experience - Risk)
- Construction (Infrastructure - Water - Experience)
- Construction (Infrastructure - Rail - Experience)
- Education Level (Infrastructure - Rail)
- Engineer (Construction - Building & Construction - Job Role)
- Engineering (Infrastructure - Water - Experience - Safety)
- Engineering (Infrastructure - Rail - Experience - Safety)
- Entry Permit (Infrastructure - Rail - Education Level - LUL)
- Facilities Management (Construction - Building & Construction - Experience)
- General (Construction - Building & Construction - Experience - Facilities Management)
- Health (Construction - Building & Construction - Experience)
- Health & Safety (Infrastructure - Water - Experience)
- Health & Safety (Infrastructure - Rail - Experience)
- Health & Safety (Construction - Building & Construction - Experience)
- Hotel (Construction - Building & Construction - Experience)
- Housing (Construction - Building & Construction - Experience)
- LUL (Infrastructure - Rail - Education Level)
- Method Statements (Engineering - Experience)
- Method Statements (Infrastructure - Rail - Experience)
- Method Statements (Construction - Building & Construction - Experience)
- Procurement/Buying (Construction - Building & Construction - Experience)
- Project Engineer (Engineering - Job Role)
- Project Engineer (Infrastructure - Water - Job Role)
- Project Engineer (Infrastructure - Rail - Job Role)
- Project Engineer (Construction - Building & Construction - Job Role)
- Project Manager (Engineering - Job Role)
- Project Manager (Infrastructure - Water - Job Role)
- Project Manager (Infrastructure - Rail - Job Role)
- Project Manager (Construction - Building & Construction - Job Role)
- Recruitment (Infrastructure - Rail - Experience)
- Retail (Construction - Building & Construction - Experience)
- Risk (Infrastructure - Water - Experience)
- Risk (Infrastructure - Rail - Experience)
- Risk Assessments (Construction - Building & Construction - Experience)
- Safety (Infrastructure - Water - Experience)
- Safety (Infrastructure - Rail - Experience)
- Setting Out (Construction - Building & Construction - Job Role)
- Site Surveys (Engineering - Experience)
- Site Surveys (Infrastructure - Water - Experience)
- Social Housing (Construction - Building & Construction - Experience)
- Surveys (Infrastructure - Water - Experience)
- Surveys (Infrastructure - Rail - Experience)
- Underground (Infrastructure - Rail - Experience)
Healthcare (Non-Clinical)
Categories
Skills
- Engineering (Estates - Operational Management)
- Estates Management (Estates)
- Facilities Management (Estates - Operational Management)
- Maintenance (Estates - Operational Management)
- Medical Staffing (HR)
- Operational Management (Estates)
- Plumbing (Estates - Estates Management)
- Recruitment (HR - Medical Staffing)
- Waste Management (Estates - Operational Management)

