SearchSearch

Sign In
 Sign in or Register
Buyer zone
Find skilled Sellers for your organisation
Seller zone
Tell organisations about your skills

About us

Contact us

FAQs

Testimonials

Site map

Can we help?
tel0870 389 3244
emaile-mail

infoYou are currently viewing the web site for registered charities, showing discounted Seller rates.


Access our main site

HomeElectrical Supervisor
[ Printer friendly ]

Freelance Electrical Supervisor

,

Rating:Unrated (New)
Hourly Rate:
Available From:
Seller ID: 279984

[ Top | CV | Skills ]

CV

PERSONAL SKILLS:

Self-starter, motivated, professional

Good communication skills

Problems-solver

A keen ability to obtaining hard to get information

High moral standards and business ethics

Receptive and responsive to team work

Adapting rapidly to changes in enviroment, places, people

TECHNICAL SKILLS:

Construction, Pre - Commissioning, Commissioning, Start-up and Operation for Electrical Installations and Power Plant include Gas Power Plant.

Repair, Maintenance and Troubleshooting

Project Coordinator

Quality Assurance / Quality Control Activity.

Testing of Electrical Equipment.

Procedures for Testing of Electric Equipment for Nuclear Power Plant (NPP)

Technical and Commercial Evaluation of Tenders.

EDUCATION/TRAINING

PolytechnicUniversity- Diploma of Electrical Engineer

Industrial High School, Bucharest - Awarded Diploma of Baccalaureate profile Electro-Energetic

AGIP KCO Permit to work Training Workshop, Caspian Technical Resources Craft Training Center-Kazakhstan, Nov.2006

Marketing and Negotiated Techniques, Romania, 2003

Fiability and Maintenance in Quality Assurance System, Romania, 1998

The Instrumentation Training Course, Danfoss, Denmark, 1997

Compensation of reactive energy with automatic capacitor bank, Frako, Germany , 1996

Evaluation of Industrial Companies, Romania, 1995

Risk Assessment in Industrial Activities, University of Pisa, Italy, 1995

Management in Research and Development Activities, Romania, 1994

Member of New York Academy of Sciences,

Selected as a Potentially Qualified Candidate for Inclusion in the 1998 Edition of International Who's Who

Senior Researcher

LANGUAGES: English: good level

COMPUTER SCIENCE: MS Word, MS Excel, Internet Explorer

EMPLOIMENT HISTORY

March 2007-May 2007- GENERAL ELECTRIC Intl.

Commissioning & Start up Electrical Supervisor

Project:RAB2 Power & Water Plant -Ras Abu Fontas/Qatar

Activity:

Supervised activity for commissioning & start up for LV/HV electrical installations-Transfomers,Substations,UPS,Switchgears,MCC,Electrial Cables.Motors,a.s.o.

September 2006-March 2007- AGIP KCO/PETROFAC Intl. Ltd.

Electrical Superintendent

Project:Kashagan Development Experimental Program-Eskene West Onshore Processing Facility/Kazakhstan

Activity:

Follow up the execution of project in accordance with the Discipline Design Instructions,Project Procedures on Safety and Quality Control.

Provide assistance and support for construction,pre-commissioning,commissioning and start-up for LV and HV electrical installations as: Substations, Transformers, Switchgears, Electric Cables, Motors, MCC,Power Centers, LMS (Load Management System),DMS (Distribution Management System),IPCD (Integrated Protection and Control Device),Diesel Generators,UPS,Electrical Super Heater,Earthing System,Cathodic Protection,Trace Heating,Lighting System,Lightning Protection,

Supervised and controll the EPC CONTRACTOR's activities regarding engineering,procurement and construction, verify and checking all the documentation (technical specifications,drawings,procedures)

Organized , participate and coordinated all necesary technical meetings to implemetnt the performance of the work.

Interfacing with all EPC Contractor departments on technical,contractual and procedural issues in order to settle in useful time the critical problems.

Well-known of local standards (PUE,SNiP a.s.o.)

2004- August 2006 -TECHNIP ITALY S.P.a

Electrical Supervisor-Team Leader

Project:Unleaded Gasoline/Low Sulphur Gas Oil Project - Abu Dhabi Oil Refining Company UAE.

Activity:

Developing and implementing the EPC CONTRACTOR's technical documentation for pre-commissioning,commissioning and start-up activity.

Precommissioning, Commissioning and Start-up activity for HV( high voltage), and LV ( low voltage) electrical installations as: Substations, Transformers, Switchgears, Electric Cables, Motors, MCC, Power Centers, VSD(LOHER),UPS(GUTOR), Capacitor Bank(ABB),SCADA System,Electrical Heaters (CHEMTEC.B.V.),Cathodic Protection, configuration and settings of inteligent protection relays as: Motor Managers MM5(S&I),MULTILIN Relay SR 269,469,489,745,750/760 (ABB) a.s.o.

Training his Engineering Team regarding the testing of equipment and acceptance criteria and assuring that all lessons are properly learned and applied.

2003-2004-GENERAL ELECTRIC - NUOVO PIGNONE

Electrical Supervisor

Project: GasTurbine Generator-Western Libya Gas Project-WAFA DESERT- North Africa -Libya

Activity:

Supervised teams of electrical specialists for construction of GTG (Gas Turbine Generator) equipment.

Provides engineering assistance to superintendents, directs assigned personnel in meeting cost and time schedules, verifies materials, equipment, and workmanship and assures results meet design requirements.

Assigned and monitored work of subordinate staff to ensure efficient use of personnel.

Prepared reports and maintain records of time and materials utilized in project.

Developed work methods and provided technical support for installation of GTG equipment.

Pre-commissioning, commissioning and start-up activity for electrical installations.

Colligated the electrical diagrams with MARK V philosophy for start-up GTG.

Project: Kwale Gas Injection Upgrading Project -OBI-OBI, Nigeria

Activity:

Electrical commissioning and start-up activity for Gas Turbine Generators, Low, Medium and High Pressure Compressors: Generator Control and Protection Panel, Excitation Panel, MCC, Rectifiers, Inverters, Motors a.s.o.

2002- 2003 -GENERAL ELECTRIC MATERIALS

Senior Electrical Engineer

Activity:

Received allocated duties and views enquiry documentation from client together with Scope of Work, interfaces with other disciplines to ensure integration of activities.

Prepared specifications, datasheets and undertake calculations to meet requirements of allocated tasks.

Undertakes technical evaluation of vendor offers to ensure that technical details are satisfied..

Develop equipment specifications and prepare material requisitions for electrical equipment.

Asses progress and procedure associated reports and propose plans to recover slippage and correct inefficiency and to take any resulting agreed actions.

Received "as built" information from Project Management Team, checked and reviews content.

2001 - 2002 -TECHINT CIMIMONTUBI - ITALY

Electrical Supervisor

Project:

NigeriaLiquefaction Natural Gases Expansion Project, BONNY ISLAND-NIGERIA

Activity:

Supervised the construction of electrical installations: Catholic Protection, Electrical Substations, Earthing Systems.

Planned, scheduled, assigned and supervised the work of teams engaged in the installation of electrical systems and equipment.

Determinate of job requirements estimate and requisitions materials.

Developed and maintained safe work practices and enforces strict conformance to safety regulations..

Participate to weekly engineering meeting,providing the inputs to the Site Manager for Project reporting.

Provide to Site Manager daily report as concerns the working progress and proposed actions to implement the performance of the work.

QA/QC activity.

1996 - 2001- TOFAN GROUP, DANUBIANA S.A.

Head of Electrical Department-Project Coordinator

Main Projects:

Rewamping of Electrical Substations-Install H2S Switchgears (ABB-Type)

Implementation of Frequency Conveters for Pumping Systems (SIEMENS-Type)

Compensation of Reactive Power with Automatic Capacitor Bank (FRAKO-Germany)

Information Management System (FRAKO-Germany)

Activity:

Supervised, construction, pre-commissioning tests and commissioninig,repair and maintenance for wide variety of equipment : Electric Motors, Generators, Motor Control Centers, Pumping Stations,Compressor Stations,UPS,Frequency Converters, Electric Cables, Transformers, Rectifiers, Switchgears, Relays a.s.o.).

Scheduled maintenance inspections for a wide variety of electrical equipment.

Inspected the electrical installations..

Coordinated and assisted in development and completion of all electrical QA/QC acceptance forms and electrical testing of site electrical equipment.

Liaised with all those involved in achievement of electrical installations (EPC Contractor, Sub-contractor, Commissioning Group, Owner).

Assisted owner electrical staff for the taking over maintenance of electrical installations.

Verified the development and completion of all electrical specific forms and electrical testing before energizing the systems.

Coordinating of trouble tracking and start up activity before energizing.

Analyzed of tender documents, bid evaluation and carries out commercial and technical evaluation of tenders..

1992 -1996 - EUROTEST S.A

Scientific Manager

Activity:

Management of Research and Development activity in field of equipment qualification, namely: assessment of the capability's equipment to operate in specific conditions (Thermal and Operational Aging, Radiation Vibration, Earthquake and Nuclear Accident) for Nuclear Power Plant.

Organization and coordination of QA activity.

Coordination of activity to elaborate of new methodologies for qualification of electrical equipment (electrical panels, rectifiers, inverters, transformers, a.s.o).

Providing technical advice and assistance to engineering personnel

1985 -1992- ELECTROTECHNICAL RESEARCH INSTITUTE, Bucharest

Head of Research and Qualification Department for Equipment of NPP (Senior Researcher)

Activity:

Research in field of Qualification of Safety Related Equipment for NPP.

Elaborated of new methodologies and procedures for testing of equipment for Cernavodă NPP according to international standards (IEEE, IEC, ASTM a.s.o.) before installing and commissioning

Established operating procedures and work standards.

Supervised and participated in the training of employees.

Performed of specific tests for Electrical, Electronic and Automation Equipment as: thermal aging, radiation aging, vibration and seismic testing and LOCA test (Loss of Coolant Accident).

Compiled the tests forms procedure and data sheet.

1977 - 1985 - DANUBIANA

Head of relays protection department

Activity:

Testing of electric equipment (Electric Motors, Generators, Transformers, Electric Cables, a.s.o.) as part of maintenance programs.

Pre-commissioning tests for electrical equipment and drawing up the acceptance forms.

Verified the measured values. Checking the protections and settings of relays protections.

Verifying boards, motors a.s.o. Drawing up the procedures for commissioning of electrical installation.

[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.

Register as buyer

Freelancers: (Sellers)


To sell your skills please Register as a Seller for FREE.

Register as seller