SearchSearch

Sign In
 Sign in or Register
Buyer zone
Find skilled Sellers for your organisation
Seller zone
Tell organisations about your skills

About us

Contact us

FAQs

Testimonials

Site map

Can we help?
tel0870 389 3244
emaile-mail

infoYou are currently viewing the web site for registered charities, showing discounted Seller rates.


Access our main site

HomeLead Structural Engineer
[ Printer friendly ]

Freelance Lead Structural Engineer Jarrow

Contract

Rating:Unrated (New)
Hourly Rate:
Available From:
Seller ID: 279921

[ Top | CV | Skills ]

CV

NATIONALITY : BRITISH

QUALIFICATION : H.N.C. CIVIL ENGINEERING (1984)

EDUCATIONAL TRAINING : 1980-84 O.N.C. / H.N.C. CIVIL ENGINEERING

NEWCASTLE POLYTECHNIC

ADDRESS : 20 CLOVERHILL

FELLGATE

JARROW

TYNE & WEAR

NE32 4PX

EXPERIENCE TO DATE INCLUDES A TOTAL OF 28 YEARS IN ENGINEERING. THIS CONSISTS OF 6 YEARS IN GENERAL CIVIL AND STRUCTURAL ENGINEERING AND 22 YEARS IN PETROCHEMICAL AND OFFSHORE ENGINEERING.

DESIGN CODES OF PRACTICE USED INCLUDE THOSE OF BRITAIN BS5950, BS449 BS6399, NORWAY NS3472 AND USA AISC, API RP2A

Also use of STAAD 3, QSE, PDMS and Autocad 2000

JULY 2006- AJS v.o.f.

PRESENT HARTLEPOOL

Employed as Client Site Representative on the Shell Sean Compression Project. Responsible

for the management of all site activities during the Construction of a 2000Te Compression Module. Also responsible for Structural, Architectural, Outfitting activities on the site. Further responsibilities include co-ordination and approvals of all Offshore Installation activities including liaison with the Marine Warranty Surveyors.

MAR 2004- NEXEN PETROLEUM U.K. Ltd

JUN 2006 HARTLPOOL

Employed as Senior Site Structural Engineer on the Buzzard Project, as Client Discipline Engineer on the Utilities and Quarters Topsides Platform. Responsible for all structural related issues, including review and approval of Contractor submitted procedures for the construction activities on site. Also responsible for liaison with the engineering team based in the London design office, including resolution of all site queries and engineering queries. Responsible for all engineering related work in relation to loading out the 11300Te Platform on to the transportation barge, and co-ordinating readiness for sailaway. Additioanl duties include Deputy Resident Engineer, and Transportation and installation Site Co-ordinator.

APR 2003- AMEC

FEB 2004 WALLSEND, TYNE & WEAR

Employed as Lead Structural Engineer on the BP Clair Project, the construction of a 12,000Te Topside Platform. Responsible for producing Design reports for all Heavy Lifting Operations and Temporary Works associated with the Construction Phase of the Project through to completion, weighing and Load Out. Structural design calculations prepared in accordance with AISC Allowable Stress Design.

NOV 2002- SWAN HUNTER TYNESIDE LIMITED

APR 2003 WALLSEND, TYNE & WEAR

Employed as Senior Structural Engineer on an MOD Contract, providing Engineering services

to the Construction Team. Responsible for producing Design Reports for all Heavy Lifting Operations and Temporary works associated with the construction of two Naval Vessels. Design calculations prepared in accordance with AISC Allowable Stress Design and BS6399 Wind Code

AUG 2002- HALLIBURTON UK LIMITED

NOV 2002 SINGAPORE

Employed as Completions Manager on the Barracuda FPSO Conversion. Responsible for the co-ordination and management of a team of Engineers at the conversion Shipyard in Singapore, to evaluate the incomplete work to be transferred to the Integration phase of the Project in Rio de Janeiro.

DEC 2001- SWAN HUNTER TYNESIDE LIMITED

AUG 2002 WALLSEND, TYNE & WEAR

Employed as Senior Structural Engineer on an MOD Contract, providing Engineering services to the Construction Team. Responsible for producing Design Reports for all Heavy Lifting Operations and Temporary works associated with the construction of two Naval Vessels. Design calculations prepared in accordance with AISC Allowable Stress Design.

NOV 2001- HALLIBURTON BROWN & ROOT

DEC 2001 ABERDEEN

Employed as Senior Structural Engineer on the Chevron Alba Extreme South Project. Responsible for the preparation of Design Reports associated with the new ESDV Support Platform & Enclosure, and the installation of a new Riser Caisson. Design calculations prepared in accordance with BS 5950-1:2000.

JUN 2001- KVAERNER OIL & GAS LIMITED

NOV 2001 ABERDEEN

Employed as Senior Structural Engineer on the Perth Field Development Project on the

Amerada Hess Scott Platform. Responsible for the preparation of Design Reports & Installation Philosophies associated with a new Caisson, Process Module and various Vendor Packages. Design calculations were prepared in accordance with AISC Allowable Stress Design. Discipline focal point for Weight Control, Mechanical Handling and Pipe Supports.

MAR 2001- McNULTY OFFSHORE LIMITED

JUN 2001 SOUTH SHIELDS, TYNE & WEAR

Employed as Project Engineer responsible for the design, procurement, fabrication and installation of the Debottleneck Module for the Bleo Holm FPSO Contract.

OCT 2000- AKER OIL & GAS TECHNOLOGY

MAR 2001 SOUTH SHIELDS, TYNE & WEAR

Employed as Senior Structural Engineer on the Talisman Blake FPSO Contract. Responsible for the Design of Secondary and Tertiary Steelwork for 3 No. new Modules for installation onto an existing FPSO. Design verification of existing Structure capability to accept new Pipework loadings on Piperacks and existing Modules, to comply with the requirements of AISC Allowable Stress Design and CP3 Wind code.

FEB 1999- GULF PIPING COMPANY

OCT 2000 ABU DHABI, U.A.E.

Employed as Project Manager for the construction of the Main Turret for the Terra Nova

Project, on the FPSO stationed on the Grand Banks in Newfoundland.

Responsible for the overall Management of the Project, including Budget Control, Material Procurement, Scheduling, Engineering, Multi-Discipline Production, Completions and Commissioning. Liaison with the Client, and their Partners, Vendors, Suppliers and Subcontractors. Other responsibilities included preparation of Weekly and Monthly Progress Reports, Monthly Cost Reports, and internal Management Reports.

AUG 1998- WS ATKINS NORTHERN

FEB 1999 WHITEHAVEN, CUMBRIA

Employed as Senior Structural Engineer / Project Engineer on various Projects from the Cumbria Office, relating to Heavy Engineering and Nuclear Projects. Responsible for the supervision & co-ordination of the Structural & Mechanical Engineering Departments. Development of new Business Client contacts, including the preparation of Tenders for Consultancy Services. Design Codes used BS5950, BS6399, BS449, CP3.

NOV 1996- NOELL-LGA GASTECHNIK GmbH

JUL 1998 ABU DHABI, U.A.E.

Employed as Assistant Project Manager on the development of a Multi- Product Storage and Distribution Depot for the Government Oil Company, ADNOC-FOD.

Responsibilities included General day to day Management of the Project, including all Engineering and Construction Activities for all Disciplines, Preparation of Weekly & Monthly Progress Reports, Progress Invoices, Liaison with Vendors, Suppliers & Subcontractors, and approval of Purchase Orders. Monitoring and approval of Variation Orders. Site Management of all Civil & Mechanical Activities.

FEB 1996- SWAN HUNTER ( TYNESIDE )

OCT 1996 WALLSEND, TYNE AND WEAR

Employed as Lead Structural Engineer on the Solitaire Project, the conversion of a Bulk Carrier into the worlds largest Pipe Laying Vessel. Responsible for the Management of the Structural, Architectural, HVAC and Weight Control Engineering Departments, for all engineering activities to maintain schedule, and meet budget targets.

SEP 1995- GULF PIPING COMPANY

FEB 1996 ABU DHABI, U.A.E.

Employed as Head of Engineering and Production, responsible for the Management of the Engineering Office for the production of all Engineering Drawings, MTO's, Requests and TQR's for various Projects, including Mooring Buoys, Turret Systems, Subsea Templates and Container Handling Cranes. Responsible for developing company procedures for engineering

activities in order to achieve ISO9000 status.

APR 1994- AOCINTERNATIONAL, ABERDEEN

SEP 1995 SHELL BRENT ALPHA REFURBISHMENT

Employed as Structural / Architectural Engineer on the MMSC Contract for the refurbishment of the Shell Brent Alpha Platform. Responsible for the overall upgrade of the Platform, including a total Refurbishment of the Permanent Living Quarters, and a Major Structural

Extension to accommodate a new Lifeboat Station and Temporary Refuge Facilities. Onshore responsibilities include the development of Work Packs for Offshore Implementation.

JUN 1992- AOCINTERNATIONAL, ABERDEEN

FEB 1994 SHELL NELSON PROJECT

Employed as Structural Engineer on the Integrated Management Team for the Offshore Hook-up of the Shell Nelson Platform. Six months in the Design Team offices in London reviewing the design and details of the Offshore Workscope, and preparation of Work Packs for both

Structural and Architectural Disciplines. Further eight months in the Construction Yard to verify the Offshore scope, and preparing the Outstanding Works List for incomplete Onshore work. Offshore Engineer for the Hook-up of the entire Platform for Structural and Architectural activities, ensuring safe and efficient progression of the work.

JAN 1991- AOCINTERNATIONAL, ABERDEEN

JUN 1992 BP MILLER PROJECT

Employed as Structural Engineer on the Integrated Management Team for the Offshore Hook-up of the BP Miller Platform. Onshore responsibilities include the preparation of Work Packs for the Structural scope of work, Design & Detailing of Offshore Installation Procedures & co-ordination with Construction Sites & Installation Contractor. Offshore Engineer on the Hook-up of the Platform, and all associated Modules.

MAY 1990- AKER ENGINEERING A/S

DEC 1990 OSLO, NORWAY

Employed as Senior Structural Engineer for the design of all Platform infill Steelwork, Structural Hook-up Co-ordination with Construction Sites for the Sleipner A Platform. Preparation of all necessary Design Reports for Client Approval, and management of drawing production. All design calculations prepared in accordance with the Norwegian Standard. Seconded to Statoil as Discipline Engineer for the Inshore Phase Hook-up Tender Evaluation.

Design calculations prepared in accordance with the Norwegian Standard, NS3472.

NOV 1988- AKER ENGINEERING A/S

MAY 1990 OSLO, NORWAY

Employed as Structural Engineer for the Detailed Engineering phase of all Secondary and Outfitting Steelwork on the Sleipner A Platform. Responsibilities include preparation of all detailed engineering calculations for the above Modules & preparation of Design Dossiers. Supervision of the Draughting group, regarding engineering quality. Co-ordination with other

Disciplines and external companies. Post Production Engineering Analysis of Modules for Loadout and Transportation, review of Contractors erection procedures and the resolution of Engineering Queries. Design calculations prepared in accordance with the Norwegian Standard, NS3472.

JUL 1986- PRESS OFFSHORE LTD.

NOV 1988 WALLSEND, TYNE & WEAR

Employed as Lead Structural Engineer responsible for Structural Engineering requirements for various major Offshore Projects. Preparation of Tender Documents, Erection Procedures, Weighing and Load-out Procedures. Supervision of Engineers with delegation of workload.

Preparation of Design Reports for Temporary and Permanent works, for Projects based in the UK, Canada, South Africa and Australia. Review of potential fabrication facilities in Canada and Australia, including yard development proposals at greenfield locations, suitable for establishing an offshore fabrication base.

JUL 1984- PRESS OFFSHORE LTD.

JUL 1986 WALLSEND, TYNE & WEAR

Employed as Senior Structural Engineer, responsible for the preparation of Calculations and Design Sketches for all Temporary Works, and preliminary Construction work, co-ordination of Erection sequences with calculations for Main Structural integrity for the lifting arrangements, and installation of Major Equipment, including rigging arrangements. Preparation of Load-out Procedures, including full Structural analysis, Load-Out Methods, Quay Integrity calculations and River Flow Velocity Surveys, Including Mooring Analysis and Mooring Bollard design. All calculations were prepared in accordance with BS449 and CP3.

JUL 1980- GREENER WHITEHOUSE & ASSOCIATES

JUL 1984 NEWCASTLE UPON TYNE

Employed as Junior Engineer involved in the preparation of Calculations & Design Sketches for Structural Steelwork, Reinforced Concrete and Brick Structures. Engineering assistance on site during construction phases, performing Site Surveys, attending Progress Meetings, and liaison with Clients.

OCT 1979- WRIGHT ANDERSON & COMPANY

MAY 1980 GATESHEAD, TYNE & WEAR

Employed as Structural Draughtsman, preparing Structural Fabrication Drawings for Heavy Industrial Buildings in Steel and Concrete. Preparation of General Arrangement and Setting Out Drawings.

AUG 1978- TYNEDRAFT DESIGN LTD.

OCT 1979 NEWCASTLE UPON TYNE

Employed as a Junior Structural Draughtsman, preparing fabrication Drawings for Heavy Steel Industrial and Agricultural Buildings.

[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.

Register as buyer

Freelancers: (Sellers)


To sell your skills please Register as a Seller for FREE.

Register as seller