SearchSearch

Sign In
 Sign in or Register
Buyer zone
Find skilled Sellers for your organisation
Seller zone
Tell organisations about your skills

About us

Contact us

FAQs

Testimonials

Site map

Can we help?
tel0870 389 3244
emaile-mail

infoYou are currently viewing the web site for registered charities, showing discounted Seller rates.


Access our main site

HomeBuilding Services Engineer
[ Printer friendly ]

Freelance Building Services Engineer Brighton

Building Services Engineer

Rating:Unrated (New)
Hourly Rate:
Available From:
Seller ID: 279607

[ Top | CV | Skills ]

CV









PROFESSIONAL QUALIFICATIONS

IEng ACIBSE (Chartered Institution of Building Services Engineers)

HND IN ENVIRONMENTAL ENG. Polytechnic of the South Bank, London SE1

DIPLOMA IN BUILDING ENGINEERING SERVICES South Thames College, London SW15

GCE 'O' LEVELS Design & Technology, Physics, English Language,

French, Chemistry, English Literature & Mathematics.

COMPUTER EXPERIENCE/RELEVANT TRAINING COURSES

LEAD AUDITOR 5 DAY COURSE HEVACOMP (V18)

NEC CONTRACTS WORKSHOP LEV VENTILATION (COSHH)

DISPLACEMENT VENTILATION SMOKE CONTROL BY PRESSURISATION

PRIMA VERA P3: PLANNING & SCHEDULING

MICROSOFT OFFICE (WORD, EXCEL, ACCESS ETC)

A/C INSTALLATION COMMISSIONING & MAINTENANCE

CAD PACKAGES (2D & 3D AUTOCAD, MICROSTATION, PEHVAC, SONATA & BSL)

CAREER HISTORY

Jul 2006 - Present ScottWilson BuildingServices, 8 Greencoat Place, London SW1P 1PL

Building Services Engineer, responsible for Leading numerous multi-

discipline projects mainly for LUL and Network Rail. Design & scoping of

Mech and PH services for Feasibility studies and RIBA Stage C & D

Reports, against tight deadlines including Cost Control and Value

Engineering activities. Surveying of existing services. Production of HVAC

Layouts using 2D Microstation.

Aug 2001 - Jul 2006 Fluor Global Services. LUL Connect Communications Project

Building Services Engineer. To plan, specify & control the design in

compliance with LUL & statutory requirements. To provide technical

support & assurance to the Project, carry out Risk Analysis & obtain Client

approval of Designs. Ensure agreed targets of quality, safety, cost & time

are achieved for the implementation and handover of HVAC, Water &

Public Health services for Communication Equipment Rooms (CER),

tunnels, stations & LUL accommodation.

Jun 2000 - Aug 2001 London Underground Ltd., London, E14 5EU.

Mechanical Project Engineer, responsible for numerous

multi-disciplined Projects including Kings Cross Station redevelopment.

Management of outside consultants, reviewing and assurance of designs.

To plan, specify & control the design in compliance with LUL & statutory

requirements. To audit in house Projects and Assets.

Apr 1999 - Jun 2000 AMEC Design, 12-18 Paul Street, London, EC2A 4JH.

PFIZER, Campus Gateway, New £36M Research Headquarters:-

Lead Designer responsible for the management and supervision of the

CAD Team; Engineering design calculations & selections; attending

Progress/Workshop meetings with the Client/Architect/Interior Designer;

production of Co-ordinated Plantroom and Floor layouts using Autocad.

CAREER HISTORY (cont.)

Feb 1997 - Apr 1999 Raytheon Engineers & Constructors, New Malden, Surrey.

Pfizer Ltd., Solids Handling Facility, Kent:- Lead Designer responsible

for the design and co-ordination of HVAC & steam services and

production of layouts & P&ID's as part of the project task force.

R.J.Reynolds, Tobacco Manufacturing Plant, St. Petersburg, Russia:-

Lead Designer based on site responsible for surveying existing

services & Design & Co-ordination of new HVAC, Steam, Vacuum

& Compressed Air services and speciality equipment.

Proctor & Gamble, Food & Beverages, Mechelen, Belgium:- Lead

Designer based on site, responsible for the concept design and 3D

co-ordination of specialised HVAC systems serving a Food Processing

Plant housing four existing and two new conveyor lines.

Oct 1995 - Feb 1997 Building Design Partnership, London W1.

Project Designer/Co-ordinator, responsible for full Co-ordination

of M&E Services using Autocad 12 & Microstation, as part of the

Professional Team on various projects.

Jun 1995 - Oct 1995 Rybka Battle Consulting Engineers, London W1.

Project Designer/Co-ordinator on various major projects,responsible

for full M&E services Co-ordination using Autocad 12.

Nov 1994 - Jun 1995 AMEC E&M Engineers Ltd.,Hong Kong.

New Nethersole Hospital,Hong Kong:- Project Designer, site based,

responsible for the Design & Co-ordination of M&E, Chemical, Fuel,

Steam & Hospital Services using Autocad 12.

May 1994 - Sep 1994 Snamprogetti Ltd., Basingstoke.

Fisons Pharmaceuticals, New Pilot Plant, Loughborough. Project

Designer/Co-ordinator using BSL 3D Modelling Package on Autocad 12.

Oct 1993 - May 1994 Sulzer Infra Ltd./THS Consortium

Bank of England Printing Works, Essex. Lead M&E Co-ordinator

using Autocad 12 utilising a Workflow Management System.

Sep 1991- Oct 1993 Rosser & Russell/Pyramis CADD Bureau

Lead Co-ordinator on various commercial projects - Responsible for

the on site Co-ordination & Supervision of the Team using Autocad 12 and

on site trouble shooting using Sonata 3D CADD System.

Mar 1989 - Sep 1991 Sulzer Building Services Ltd

British Airways Shorthaul Catering Facility, Heathrow

Lead Designer/Co-ordinator.

Sep 1988 - Mar 1989Abroad in S. E. Asia, Australia & USA

Feb 1988 - Sep 1988 FHP Partnership Consulting Engineers

High Wycombe, Bucks. Design Draughtsman.

Feb 1987 - Feb 1988 Sulzer Building Services Ltd.

30 Gordon House Road, London NW5

Design/Co-ordination Draughtsman

Sep 1981 - Feb 1987 Rosser & Russell Building Services Ltd.

Queen Caroline Street, London W6. Project Engineer.

PROFESSIONAL EXPERIENCE

I have twenty six years experience in Mechanical Engineering, which started with my Apprenticeship at Rosser & Russell and has continued within the Building Services, Pharmaceutical and more recently the Rail Industry.

During this time I have gained experience in all aspects of Design and Contracting, working as an integral part of a team, either on site or in the office.

Since 1990 I have had extensive use of CADD Systems for production of fully co-ordinated 3D & 2D Plantrooms, floor layouts & Client Presentation drawings including the use of 3D modelling packages and

3D Services Libraries.

More recently I have been involved in the design, engineering and management of projects including writing of specifications. I have attended numerous CPD courses including NEC Contracts 2 day Course; Smoke Control by Pressurisation; Local Exhaust Ventilation (LEV); Lead Auditors 5 day Course; Displacement Ventilation; Smoke & Heat Exhaust Ventilation: Prima Vera P3.

My responsibilities have ranged as follows:-

Project Leader, CADD System Supervisor, Head Co-ordinator, Calculation of Ductwork & pipework systems, Checking & Approval of Contract Drawings, Production of Co-ordinated Services Drawings, System & Network Management, Programming, Site Surveys, Commissioning, Attending Site Meetings, Estimating, Assessing Valuations and Final Accounts.

OTHER CONTRACTS WORKED ON

PFIZERS, PHARMACEUTICAL DEVELOPMENT FACILITY, SANDWICH, KENT - £50M

HVAC Services using PEHVAC 3D CAD Modelling Package.

BRITISH AIRWAYS SHORTHAUL CATERING FACILITY, HEATHROW. - £5M

Full range of M&E Services including Chemical, Vacuum, Steam and other Specialist Services.

RHCH, WINCHESTER HOSPITAL. - £1.8M

Full range of M&E Services including Chemical, Vacuum, Steam and Specialist Hospital Services.

SOUTHQUAY PLAZAPHASE II (DAILY TELEGRAPH OFFICES) - £4.5M

Full range of M&E Services including a major refit to suit the client.

CAMOMILE COURT EC1 (OFFICE BLOCK) - £2.5M

Full range of M&E Services.

ROCHE PHARMACEUTICALS, WELWYN GARDEN CITY (RESEARCH BLOCK) - £2.2M

Full range of M&E Services including Chemical, Vacuum & Foam Services.

BRITISH RAIL, STANIER HOUSE, BIRMINGHAM - £500,000

Battery rooms, Fume Cupboards, Heating & Ventilation & Specialist Equipment.

SMITHFIELDS MARKET, LONDON EC2 - £4M

Full refurbishment of Mech., Elect. & Public Health Services whilst maintaining normal operation for the Market Traders

THAMES HOUSE, 1 MILLBANK, LONDON SW1.

Full refurbishment of Mech., Elect. & Public Health Services for Secure Government Offices.

BRITISH STANDARDS INSTITUTE, CHISWICK

Full refurbishment of Mech., Elect. & Public Health Services for Head Office.

FUJITSU LTD., NEW FABRICATION BUILDING, DURHAM

Production of large bore pipework routes & full M&E Co-ordination drawings on site.

MARKS & SPENCERS FINANCIAL SERVICES, CHESTER

Production of full M&E Co-ordination drawings in Plantroom areas as well as individual service drawings (HVAC, Public Health, Power & Lighting).

[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Healthcare (Non-Clinical)

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.

Register as buyer

Freelancers: (Sellers)


To sell your skills please Register as a Seller for FREE.

Register as seller