SearchSearch

Sign In
 Sign in or Register
Buyer zone
Find skilled Sellers for your organisation
Seller zone
Tell organisations about your skills

About us

Contact us

FAQs

Testimonials

Site map

Can we help?
tel0870 389 3244
emaile-mail

infoYou are currently viewing the web site for registered charities, showing discounted Seller rates.


Access our main site

HomeInst Engineer
[ Printer friendly ]

Freelance Inst Engineer Middlesbrough

Instrument engineer

Rating:Unrated (New)
Hourly Rate:
Available From:
Seller ID: 257667

[ Top | CV | Skills ]

CV

EDUCATION AND C & G L.I INDUSTRIAL MEASUREMENT AND

QUALIFICATIONS: CONTROL. TECH. CERTIFICATE.

H. N. C. - CONTROL ENGINEERING / ELECTRICAL & ELECTRONIC PRINCIPLES

EXPERIENCE:

April 2005 - Present Snr. INSTRUMENT ENGINEER

ABB LUMMUS GLOBAL. KINEF Kirishi Hydrocracker RUSSIA (June 2005 - Present)

HAGUE. NETHERLANDS Responsible Instrument Engineer for Rotating Equipment Package Units. Review vendor P&IDs, data sheets, schematics, dimensional data, design & installation data, utility data, calculations, inspection, test and commissioning procedures.

IFP-1 Caspian Sea, / LUKOIL (April.2005 - June 2005)

Instrument input to Basic Engineering/FEED for platform extension.

Specification for Wellhead Control Panel and Surge Control Sytem.

Evaluate budget proposals. Requisitions for PSVs, On-Off valves,

Control valves and level devices. Review commissioning procedures.

March. 2002 - April 2005 INSTRUMENT ENGINEER/TECHNICAL AUTHOR

SAIPEM ERHA FPSO EXXON (Feb. 2004 - April 2005)

PARIS FRANCE/ Production of integrity critical, normal and work aid maintenance

SINGAPORE procedures and training manuals for instrumentation used throughout the FPSO including; oil metering / proving, multiphase flow meters, vibration monitoring, anti surge control, pig signals, on-off valves, pressure safety valves, control valves, valve positioners, analysers, fire and gas detection and suppression system, turbine controls, emergency shutdown system and radar level monitoring system. Training Exxon technicians and follow up work at Singapore shipyard.

Snr. INSTRUMENT ENGINEER

FPSO bid AKPO, NIGERIA, TOTAL (Oct 2003 - Jan 2004)

Part of bid preparation team. Issue of endorsements and qualifications to TOTAL technical documents. Input to design review documentation.

Onshore Oil/Gas Facility. (March 2002 - Sept. 2003)

Rod ALGERIA. BHP / SONOTRACH

Responsible instrument engineer for Mechanical Packages (rotating and static) Gas Reinjection compressors - Nuovo Pignone, Flash Gas compressors - MAN Turbo, Gas Dehydration - Sices, Air Compressors/Dryers - Fores, Desalting Unit - Petreco, Stabiliser Reboiler - BIH, Water Injection Pumps - Sulzer, Fuel Gas Heater - Repco, Flares - ITAS, Produced Water Treatment - Petreco, Nitrogen Generation - Chemitrol, Pumps - Flowserve, Pompe Gabionnetta.

Attend Factory Acceptance Tests for compressor Unit Control Panels. Review package commissioning procedures and package control and functional descriptions. P&ID development and review. . Review of IDC documents from other disciplines. Requisitions and Specifications using documentum. Evaluate bids, clarifications and select vendors. Checking of specifications and data sheets for field instruments.

Feb. 2001 - Feb. 2002 Snr. INSTRUMENT ENGINEER

BASF-PETRONAS BDO Plant, BASF PETRONAS (Aug 01 to Feb. 02)

MALAYSIA Member of the Project Management Team. Review engineering

documentation issued by main contractor (Kvaerner) sub-contractors and vendors. Attend "Factory Acceptance Tests" Fisher-Rosemount and Honeywell. Responsible for instrumentation associated with Oschatz Boiler and Port Tank Farm / Jetty extension. Main contractor / vendor liaison.

Acrylics Complex, BASF PETRONAS (Feb 01 to Aug 01)

Member of Central Engineering Dept. As-Built Logic diagrams as implemented in Honeywell DCS. Checking of specifications & data sheets. Basic & Detail Engineering for Plant Modifications, pre-commissioning and commissioning. Review documents for Plant Modifications. Inspect Instruments delivered to site.

August 2000 - Feb.2001 Snr. INSTRUMENT ENGINEER

ABB LUMMUS GLOBAL. Onshore Gas Facility.

HAGUE. NETHERLANDS Ohanet ALGERIA. BHP / SONOTRACH

Responsible engineer for Control Valves, PSV's and On-Off Valves. Prepare inquiry documents using Metaphase, evaluate bids and select vendors. Manage selected vendors for in-house engineering. Checking of Index ( Intools ) database against P & ID's.

Jan. 2000 - Aug. 2000 Snr. INSTRUMENT ENGINEER

BASF-PETRONAS Acrylics Complex, BASF PETRONAS Chemicals Sdn Bhd

MALAYSIA Member of Project Management Team. Manage Plant Modifications

Basic/Detail Engineering. Assist with logic implementation (advisory)

Logic De bugging (DCS implementation). Assist with water runs (logic integrity) pre-commissioning, commissioning and start-up. Review commissioning procedures.

Sept. 97 - Oct. 99 Snr. INSTRUMENT ENGINEER

BECHTEL ASIA PACIFIC Acrylics Complex, BASF PETRONAS Chemicals Sdn Bhd

SINGAPORE / Front End Engineering (Singapore)

KUALA LUMPUR Detailed Engineering (Kuala Lumpur)

Supervision of Engineers and Designers. P & ID Development. Logic Development. Pre-Fat de-bugging/checking (Logic implementation- SMS & DCS). Specifications. I.S. Loop Design Verification

Proposals for Various Projects (Singapore)

Jan. 97 - Aug.97 Snr. INSTRUMENT ENGINEER

AKER OFFSHORE Balder. FPSO. ESSO

NORWAY. Cause & Effect Diagrams. Block Logic Diagrams for shutdown systems. Instrument input to Mechanical Packages.

August 94 - Dec. 96 Snr. INSTRUMENT ENGINEER

ABB LUMMUS GLOBAL. Petrogal. Sines and Porto. PORTUGAL

HAGUE. NETHERLANDS Shell Nederland Raffinaderis. PERNIS

Lukoil Permefteorgsyntex. Perm RUSSIA.

Rotating Equipment Packages. Field Instrument requisitions for Long Lead items. Bid Evaluations. DCS database Development (PCDs/IEDP) P&ID Development. Control Valve, PSV, and Orifice Plate calculations/sizing. Analyser Requisitions.

Apr. 91 - August 94 Snr. INSTRUMENT ENGINEER

DET NORSKE VERITAS. Frøy integration on TCP2. ELF. (July 93 to August 94)

(VERITEC) STAVANGER, Specifications & Data Sheets for valve and control panel packages. Bid

NORWAY. analysis /recommendation. Vendor Liaison. Follow on Engineering.

Vendor Document Review. Participate in Factory Acceptance Tests.

Ekofisk complex evaluation. PHILLIPS (Feb.93 to July 93)

Development of Instrument Signal Budget. Evaluate performance monitoring and control. Evaluate alternatives within the Fiscal Metering. Input to main equipment list. Demolition, upgrade and changeover.

Ekofisk firewater system upgrade. PHILLIPS (Apr.91 to Jan.93)

Review existing systems; develop Cause & Effects and System Block Diagrams. Specification for field instruments, firewater activation, deluge and fire & gas detection systems. Bid Analysis. Vendor Liaison. Participate in Factory Acceptance Tests.

Follow-up engineering. Modifications to existing equipment.

Prepare I.O. lists, demolition scope of work, MTO & cost reports.

JAN. 90 - APR. 91 Snr. INSTRUMENT ENGINEER.

FLUOR DANIEL. DuPont de Nemours.Lycra plant, Maydown, IRELAND.

HAARLEM. NETHERLANDS. P&ID Development. Instrument specifications for field instruments.

Bid Analysis. Vendor Liaison. Assist site with loop checking, and pre-

commissioning Follow up engineering.

JUL.89 - DEC.89 Snr.INSTRUMENT ENGINEER.

ARTIFICAL LIFT CON. B.P.FORTIES Field. Gas-Lift project.

(BROWN & ROOT/ Instrument Specifications for field instruments

WIMPY) ABERDEEN. UK Bid Evaluation and selection of vendors

DEC. 88 - JULY 89 INSTRUMENT SECTION LEADER.

FLUOR DANIEL. DuPont de Nemours. Lycra Plant extension

HAARLEM. Dordrecht.Netherlands

NETHERLANDS. Responsible to the Project E&I Engineer to the instrument section for:-

P&ID Development. Specification, requisitioning and bid analysis of field instrumentation. Co-ordination between design & engineering for progress reports, schedule, design, queries. Man-hour estimates, budgets, cost estimates. Adherence to deadlines and milestones.

JULY 87 - DEC.88. INSTRUMENT ENGINEER.

KVAERNER ENGINEERING. Phillips Petroleum Company.

STAVANGER. NORWAY. EKOFISK 2/4 B-C Gas Lift.

Preparation of Data sheets and procurement data for field instruments.

Bid analysis and selection of vendors for control panels and field

instruments. Checking of P & IDs, Hook ups, Loop drawings, General

arrangements. Wiring and Termination drawings, data sheets and

drawings from other disciplines. Fire & Gas, deluge and fusible loop

systems.

SEP. 85 - JUNE 87 PROJECT ENGINEER.

HADEN MOORE ENG. Ltd. Accountable to Project Manager for monitoring progress on various

MIDDLESBROUGH. UK. contracts. Supervision of all activities including:-

Design, procurement, assembly and manufacture of control panels/equipment housings. Preparation of technical specifications tender documentation, loop-drawings, P&IDs and wiring diagrams for various contracts, on shutdown, Fire & Gas and control systems. Ensuring adherence to delivery schedules and clients procedures.

MARCH 84 - AUG.85 INSTRUMENT ENGINEER /CHECKER.

SORCO ENGINEERING A/S Phillips Petroleum Company.

STAVANGER. NORWAY. EKOFISK Field Projects.

Responsible to PPCon project engineer for scope of work, cost estimates, As Built surveys and detailed engineering. Design packages for emergency shutdown, Fire & Gas, deluge, process control and wellhead control systems. Assist with pre-commissioning and commissioning

NOV. 83 - MARCH 84 INSTRUMENT DESIGNER.

FLUOR DANIEL. ESSO Rotterdam. Flexicoker Project.

HAARLEM, HOLLAND. Production of instrument location drawings and typical installation

details. Supervision of draughtsmen and checking of control system

diagrams and associated drawings and data. Identification and

checking of field instruments on the plant model.

JAN.83 - NOV.83 DESIGN ENGINEER.

HADEN MOORE ENG. Ltd. Torness / Heysham. Nuclear power stations

MIDDLESBROUGH.UK. Design and production of external wiring diagrams for essential

interlock, relay logic, status indication, annunciator input/output,

analogue loop, PLC I/O systems. Heating and ventilating control

instrumentation. Quality assurance of, sequence flow, block wiring,

panel general arrangements, schematic & external wiring diagrams.

JULY 82 - JAN.83 INSTRUMENT DESIGN ENG.

HONEYWELL CONTROL Tioxide. UK. Titanium pigment

SYSTEMS. TEESSIDE. UK. Engineering, design, pre-commissioning and commissioning of

instrument modifications. to existing plant. Revision of all relevant

drawings and documentation. As Built drawings.

DEC. 81 - JULY 82 PROJECT ENGINEER.

SASOL INSTR. PROJECTS. SASOL Oil from coal project

SECUNDA. R.S.A. Supervision of engineering, design, construction, commissioning and start-up of new projects and start-up modifications. Liaison between Client (SASOL) and contractors on all aspects of instrument construction, quality control, loop checking, commissioning, hand over of control systems and expediting of problems. Assist with pre-commissioning, commissioning and start-up. Project cost estimates and manpower requirements. Review commissioning procedures. Review of "As Built" and final documentation.

JUNE 81 - DEC.81 INSTRUMENT ENG. / INSPECTOR.

SASOL CONSTRUCTION. SASOL Oil from coal project.

SECUNDA. RSA. Inspection of mechanical completion as per specifications. Monitoring

of construction, loop checking and commissioning progress.

Liaison between contractors and SASOL maintenance dept. Checking

of all relevant documentation and drawings.

JUNE 80 - JUNE 81. INSTRUMENT INSPECTOR/EXPEDITOR.

ROXBY ENGINEERING. ICI. Wilton.T.A.T8 plant. (Terapthalic Acid)

TEESSIDE UK. Inspection of all equipment, installations (mechanical completion), calibrations and loop checks. Liaison between all sub-contractors and the client (ICI). Supervision of paperwork required for final documentation.

1978 - 1980 INSTRUMENT ENGINEER.

ROXBY ENGINEERING. ICI. Wilton. Olefines VI plant. (Ethylene)

TEESSIDE. UK. Supervision of inspection, workshop calibrations, loop checking, pre-

commissioning, commissioning and start-up of instrumentation

related to the Petrochemical industry. Final documentation.

1976 - 1978 INSTRUMENT DESIGNER.

ROXBY ENGINEERING. ICI. Wilton. Design Department. Olefines VI plant. (Ethylene)

TEESSIDE. UK. Production of loop drawings (Foxboro spec.200), cable schedules, logic

diagrams, electrical connection schedules, P& I Ds, trip and alarm

schedules, etc. Revision of loop drawings and other relevant

documentation as per modifications and 'As Built'. Liaison between

Design Office, ICI maintenance department and on-site contractors.

1973 - 1976 INST. PLANNER / INST. TECHNICIAN

S.A.I. & S. Corp. S.A.I.&S.C. Steel Plant.

NEWCASTLE. RSA. Member of the planning department responsible for the organisation of routine and corrective maintenance.

Inspection of instrumentation associated with the steel industry. Supervision of contractors for calibration, loop-checks, pre-commissioning, commissioning and start-up.

1965 - 1973 INSTRUMENT APPRENTICESHIP / INST. TECHNICIAN.

ICI. WILTON. Instrument apprenticeship followed by four years as an Instrument

TEESSIDE. UK. Technician. Routine maintenance, pre-commissioning, commissioning, alarm and trip testing, flow metering, analysis including gas detection, construction, faultfinding, and process investigation. In house courses on Process Control, Analysis, Flameproof Equipment, Drawing Office Practices, Hazardous Area Classification, etc.

[ Top | CV | Skills ]

Categories & Skills

Engineering & Technical

Categories

Skills


Businesses: (Buyers)


To contact this Seller, or other freelancers, please register as a Buyer for FREE.

Register as buyer

Similar Freelancers


Freelancers: (Sellers)


To sell your skills please Register as a Seller for FREE.

Register as seller